-
Home
›
-
Rail News
›
-
Crashworthiness Hours
Crashworthiness Paperwork for Locomotives Stays at 407 Hours
Published: November 28, 2026
By: Adam Burns
WASHINGTON — The Federal Railroad Administration on November 24, 2026, asked for comment on the information collection for locomotive crashworthiness. FRA has made no changes to the previously approved burden of 407 hours and 554 responses. The stated dollar equivalent is $38,446.38. Comments are due on or before January 25, 2027. The docket is FRA-2026-2147. The document is FR Doc. 2026-23911, and the OMB control number is 2130-0564.
Allegheny Valley's train AVR-1, led by SD60Ms #6005 and #6003, are exchanging cars with Norfolk Southern at Island Avenue Yard in Pittsburgh on December 1, 2023. Doug Kroll photo.
What the collection covers
Under 49 CFR part 229, subpart D, FRA prescribes minimum crashworthiness standards for certain locomotives. The standards are intended to help protect locomotive cab occupants in a collision or a derailment. FRA uses the collection to check that railroads operate locomotives meeting the minimum performance standards and design load requirements for newly manufactured and re-manufactured locomotives.
The request is an extension without change of a currently approved collection. There is no form. Submissions are on occasion, and some are one-time. The respondent universe is 773 railroads and 4 locomotive manufacturers. The affected public is listed as Businesses/Public/Interested Parties. This notice asks for comment before FRA submits the request to the Office of Management and Budget. It does not itself approve the collection.
The hour table is unchanged
The notice states 554 total estimated annual responses, 407 total estimated annual burden hours, and a dollar cost equivalent of $38,446.38. The total row lists 554 responses, 407 hours, and 38,446.38. The notice says totals may not add up due to rounding.
Section 229.207(b), petitions for approval of a new locomotive crashworthiness design, lists 2 petitions, 50 hours each, 100 hours, and $9,450.00. That cost cell is the one petition row printed with a dollar sign. Section 229.207(c), a substantive change to an approved design, lists 0.33 petition, 50 hours, 16.50 hours, and 1,559.25. Section 229.207(d), a non-substantive change, uses the same 0.33 petition, 50 hours, 16.50 hours, and 1,559.25. Section 229.209(b), an alternative design, again lists 0.33 petition, 50 hours, 16.50 hours, and 1,559.25.
Section 229.211(b)(3), a hearing for more information on a petition, lists 1 hearing, 24 hours, and 2,268.00. Section 229.213(a)(3), manufacturing information kept by railroads, lists 773 railroads, 500 records, 2 minutes each, 16.67 hours, and 1,575.32. Section 229.215(a), retention of original designs, lists 4 locomotive manufacturers, 24 records, 8 hours each, 192 hours, and 18,144.00. That retention row is the largest block of hours. Section 229.215(b), records of repairs and modifications, lists 773 railroads, 6 records, 4 hours each, 24 hours, and 2,268.00. Section 229.215(c), inspection of records, lists 773 railroads, 20 records, 2 minutes each, 0.67 hour, and 63.32.
The dollar equivalents use 2025 Surface Transportation Board Quarterly Wage Form A&B data for Class I railroads. The footnote defines the wage as straight-time compensation divided by straight-time service hours. It does not print a single hourly rate.
Comments
Interested persons may comment on or before January 25, 2027. Written comments go to Docket No. FRA-2026-2147 at regulations.gov. Comments are posted without change, including any personal information. Correspondence should refer to OMB control number 2130-0564. FRA will summarize the comments in a later public notice and include them in the submission to OMB.
The notice invites comment on whether the activities are necessary for FRA to carry out its functions, including whether they will have practical utility; on the accuracy of the burden estimates, including the method and assumptions; on ways to improve the quality, utility, and clarity of the information; and on ways to reduce the burden, including automated collection. FRA says it may not conduct or sponsor, and a respondent is not required to respond to, a collection of information that does not display a currently valid OMB control number.
Questions go to Joanne Swafford, Information Collection Clearance Officer, at joanne.swafford@dot.gov or (757) 897-9908. The notice is signed by Christopher S. Van Nostrand, Deputy Chief Counsel.
Related reading on American-Rails.com
Sources
- Federal Railroad Administration, “Proposed Agency Information Collection Activities; Comment Request,” notice of information collection, Federal Register XML published November 24, 2026, FR Doc. 2026-23911, Docket No. FRA-2026-2147, OMB Control Number 2130-0564, filed 11-23-26 at 8:45 a.m. https://www.federalregister.gov/documents/full_text/xml/2026/11/24/2026-23911.xml The XML marks a page break at 75982 inside the abstract, between design load and requirements. It does not print another page mark. Title: Locomotive Crashworthiness. Type of request: Extension without change of a currently approved collection. FRA has made no changes to the previously approved burden of 407 hours and 554 responses. Affected public: Businesses/Public/Interested Parties. Forms: N/A. Respondent universe: 773 railroads, 4 locomotive manufacturers. Frequency: On occasion; one-time. The abstract covers 49 CFR part 229, subpart D, minimum crashworthiness standards for certain locomotives, used to check performance standards and design load requirements for newly manufactured and re-manufactured locomotives. Table rows: section 229.207(b) 2 petitions, 50 hours, 100 hours, $9,450.00; section 229.207(c) 0.33 petition, 50 hours, 16.50 hours, 1,559.25; section 229.207(d) 0.33 petition, 50 hours, 16.50 hours, 1,559.25; section 229.209(b) 0.33 petition, 50 hours, 16.50 hours, 1,559.25; section 229.211(b)(3) 1 hearing, 24 hours, 24 hours, 2,268.00; section 229.213(a)(3) 773 railroads, 500 records, 2 minutes, 16.67 hours, 1,575.32; section 229.215(a) 4 locomotive manufacturers, 24 records, 8 hours, 192 hours, 18,144.00; section 229.215(b) 773 railroads, 6 records, 4 hours, 24 hours, 2,268.00; section 229.215(c) 773 railroads, 20 records, 2 minutes, 0.67 hour, 63.32. The $9,450.00 cell includes a dollar sign. The other row equivalents above are printed without one. Total estimated annual responses 554. Total estimated annual burden 407 hours. Total estimated annual burden hour dollar cost equivalent $38,446.38. The table total cell prints 38,446.38 without a dollar sign. Wage footnote: Surface Transportation Board Quarterly Wage Form A&B Data (2025), Class I railroads, wage equal to straight-time compensation divided by straight-time service hours. The footnote does not state a single hourly dollar rate. Totals may not add up due to rounding. Comments on or before January 25, 2027. Joanne Swafford, (757) 897-9908, joanne.swafford@dot.gov. Christopher S. Van Nostrand, Deputy Chief Counsel. This notice does not itself approve the collection. No outbound agency link is used in the article.
-
Nov 29, 26 02:11 PM
The Colfax caboose, built in 1924 as Northwestern Pacific 28, was moved on November 12, 2026, to a track beside the 1905 depot.
Read More
-
Nov 29, 26 02:07 PM
Oil City News says Standard Oil No. 1 was unloaded at Fort Caspar Museum on October 21, 2026. Repairs are planned over the next few years.
Read More
-
Nov 29, 26 02:05 PM
WABI says volunteers finished an 18-year, $1.3 million restoration of the Greenville Junction depot. The Friends about page still describes waiting-room work in 2026.
Read More
-
Nov 29, 26 01:46 PM
The Indiana and Ohio Railway asked the Federal Railroad Administration to discontinue centralized traffic control in Cincinnati. Comments are due December 21, 2026.
Read More
-
Nov 29, 26 01:41 PM
BNSF asked the Federal Railroad Administration for approval to remove fixed derails at the Fort Madison movable bridge. Comments are due December 21, 2026.
Read More
-
Nov 29, 26 01:32 PM
MARC Train Service asked the Federal Railroad Administration to keep an eight-year brake maintenance interval on its HHP-8 locomotives. Comments are due December 21, 2026.
Read More
-
Nov 29, 26 01:26 PM
NJ Transit asked the Federal Railroad Administration to retire fixed automatic block signals on the Bergen County Line in Rutherford. Comments are due December 21, 2026.
Read More
-
Nov 29, 26 12:48 PM
FRA estimates 1,232 hours a year for emergency escape breathing apparatus records, down from 1,670. Comments are due January 25, 2027.
Read More
-
Nov 29, 26 12:44 PM
FRA is extending the locomotive crashworthiness information collection at 407 hours and 554 responses. Comments are due January 25, 2027.
Read More
-
Nov 29, 26 12:37 PM
FRA estimates 53,174 hours a year for positive train control and signal-system reporting, up from 51,931. Comments are due January 25, 2027.
Read More
-
Nov 29, 26 12:18 PM
FRA is extending 18 safety-appliance checklist forms at 142 hours and 142 responses. Comments are due January 25, 2027.
Read More
-
Nov 29, 26 11:40 AM
East Troy Railroad Museum is sending its 2026 Christmas trains to a new workshop at the Castle. Daytime and evening trips leave the East Troy Depot.
Read More
-
Nov 29, 26 11:23 AM
Hocking Valley Scenic Railway lists Santa trains from November 28 through December 20, 2026. The adult fare is $26 for a trip of about two hours.
Read More
-
Nov 28, 26 11:47 PM
Cajon Pass, the Santa Fe grade between the San Bernardino and San Gabriel mountains. The 1885 line, the 1913 track, the Palmdale Cutoff, and the San Bernardino wreck of 1989.
Read More
-
Nov 28, 26 11:43 PM
Richmond's Triple Crossing, three railroad levels at Sixteenth and Dock. The West Point line, the Seaboard viaduct of 1900, and the Chesapeake & Ohio elevated line.
Read More
-
Nov 28, 26 07:04 PM
Sand Patch Grade, the Baltimore & Ohio summit in Somerset County, Pennsylvania. The 1871 tunnel, the double-track bore finished in 1912, and the grades in the 1913 account.
Read More
-
Nov 28, 26 06:49 PM
The Rathole, the tunnel section of the Cincinnati Southern between Wilmore, Kentucky, and Emory Gap, Tennessee. Twenty-seven bores, the Cincinnati, New Orleans and Texas Pacific lease, and the clearan…
Read More
-
Nov 28, 26 11:41 AM
The Northeast Corridor from Boston to Washington. Separate railroads, then one electrified route. Amtrak owns 363 of the 457 miles. Acela, the Northeast Regional, and the commuter railroads share the…
Read More
-
Nov 28, 26 11:37 AM
Helmstetter's Curve, the Western Maryland horseshoe in Cash Valley, outside Corriganville, Maryland. Trestle, then fill. The Connellsville Extension opened August 1, 1912. Scenic trains still run…
Read More
-
Nov 28, 26 11:28 AM
St. Paul & Pacific Railroad filed to discontinue service over approximately 28.39 miles in Santa Cruz County. The exemption is effective December 30, 2026, unless stayed.
Read More
-
Nov 28, 26 11:26 AM
The Surface Transportation Board let the Justice Department and the Transportation Department file merger supplements on or before January 15, 2027. Initial comments are still expected on December 3.
Read More
-
Nov 28, 26 11:23 AM
The Federal Railroad Administration warned that lithium-ion batteries in e-bikes and scooters can create life-threatening heat in a passenger railcar within 20 to 60 seconds.
Read More
-
Nov 28, 26 11:20 AM
The Northern Indiana Commuter Transportation District asked to run trains 35, 432, and 601 without positive train control for about three hours on one night. Comments are due December 7, 2026.
Read More
-
Nov 28, 26 10:46 AM
The Surface Transportation Board made an Alameda Belt Line operating exemption effective on November 12, 2026. Pacific Harbor Line keeps operating authority.
Read More
-
Nov 28, 26 10:41 AM
Amtrak said on November 17 that the NextGen Acela schedule listed more than 40 weekday trips, 25 Saturday trips, and 32 Sunday trips.
Read More
-
Nov 28, 26 10:19 AM
Amtrak plans eight 10-car Airo trainsets for the Northeast Regional, expected to begin entering service in 2031. Each set is to seat more than 640 customers.
Read More
-
Nov 28, 26 10:14 AM
CSX Transportation asked the Federal Railroad Administration to let five trains pass the 1,000-mile brake test and run as far as 1,500 miles. Comments are due January 25, 2027.
Read More
-
Nov 28, 26 09:34 AM
Bogalusa Central Railroad filed to acquire approximately 95.5 miles from the Illinois Central. Patriot Rail filed to continue in control. Consummation may follow December 5, 2026.
Read More
-
Nov 28, 26 09:32 AM
The American Short Line and Regional Railroad Association asked the Federal Railroad Administration to extend an hours of service waiver. Comments are due January 25, 2027.
Read More
-
Nov 28, 26 09:27 AM
The Federal Railroad Administration finalized the first-year audit of Ohio rail environmental reviews. Two public comments did not change the draft report.
Read More
-
Nov 28, 26 09:24 AM
The South Shore Line plans to ask the state for another $35 million a year in operating help. A November 23 letter says a South Bend airport project was not selected in this grant round.
Read More
-
Nov 27, 26 11:48 PM
Snoqualmie Pass and Tunnel 50 on the Milwaukee Road. The Cascade bore in Washington, the grades in the 1912 and 1917 accounts, and the trains that used the line.
Read More
-
Nov 27, 26 11:25 PM
Eagle Nest Tunnel, Milwaukee Road tunnel No. 4, and trestle CC188 in the Belt Mountains of Montana. The Olympian, the Olympian Hiawatha, and the 1961 trolley raise.
Read More
-
Nov 27, 26 11:05 PM
Tunkhannock Viaduct at Nicholson, Pennsylvania, the Lackawanna concrete bridge of November 6, 1915. 2,375 feet long and 240 feet above Tunkhannock Creek. Norfolk Southern still crosses.
Read More
-
Nov 27, 26 09:56 PM
Electro-Motive GM6C, one 6,000-horsepower electric freight demonstrator. Tested from 1975 on the Penn Central and Conrail. Order 75606, serial 75606-1. Returned to La Grange and scrapped.
Read More
-
Nov 27, 26 11:59 AM
BNSF asked the Federal Railroad Administration to extend relief so certain extended haul trains may run up to 1,702 miles. Comments are due January 25, 2027.
Read More
-
Nov 27, 26 11:51 AM
The Surface Transportation Board on November 27, 2026, published notice of the Lake Providence Port Commission amended feeder-line application and set filings through March 29, 2027.
Read More
-
Nov 27, 26 11:50 AM
The City of Solon, Ohio, filed to acquire Norfolk Southern residual common carrier rights on approximately 6.5 miles of rail-banked line, from milepost RH 15.0 to RH 21.5.
Read More
-
Nov 27, 26 11:47 AM
The Surface Transportation Board on November 27, 2026, published Brookfield Corporation notice FD 36960, regrouping 103 U.S. rail carriers into three companies that Brookfield would still control.
Read More
-
Nov 27, 26 11:41 AM
The Association of American Railroads on November 19, 2026, welcomed Senate passage of the Bipartisan American Affordability and Jobs Act of 2026 and urged the House to advance the bill.
Read More
-
Nov 27, 26 11:31 AM
BNSF added the Modesto and Empire Traction Company and the Temple and Central Texas Railway to Shortline Select. The railroad said the program now includes 12 short lines.
Read More
-
Nov 27, 26 11:24 AM
The second daily Pennsylvanian made its inaugural run on November 18, 2026. PennDOT said it will allocate $318.7 million in state and federal funding toward the expansion.
Read More
-
Nov 27, 26 11:08 AM
Jim Vena and Mark George told RailTrends 2026 that a year of talks supports a simpler network, with about 88,000 new single-line lanes and about $3.5 billion in annual shipper savings.
Read More
-
Nov 27, 26 10:46 AM
CSX on November 23, 2026, joined Niron Magnetics in announcing a $1.8 billion magnet campus on the rail-served Westgate Super Site in Dothan, Alabama.
Read More
-
Nov 27, 26 10:44 AM
The Surface Transportation Board on November 24, 2026, proposed to take interim trail-use negotiations outside its process. Comments are due January 8, 2027.
Read More
-
Nov 27, 26 10:43 AM
The American Farm Bureau Federation on November 24, 2026, asked the Surface Transportation Board to reject the Union Pacific application to acquire Norfolk Southern.
Read More
-
Nov 27, 26 10:33 AM
U.S. railroads moved 540,111 carloads and intermodal units in the week ending November 21, 2026, up 4.7 percent, the Association of American Railroads reported.
Read More
-
Nov 26, 26 12:03 AM
Tulip Viaduct, the railroad bridge over Richland Creek in Greene County, Indiana. Opened accounts give 2,215 feet, 2,295 feet, and 2,000 feet. The Indiana Rail Road still crosses.
Read More
-
Nov 25, 26 11:40 PM
The Santa Fe Super Chief, Chicago to Los Angeles, May 12, 1936 to May 18, 1974. The 39-hour-and-45-minute card, the Budd rooms, Fred Harvey, and the Turquoise Room.
Read More
-
Nov 25, 26 03:05 PM
Salisbury Viaduct, the Western Maryland bridge west of Meyersdale, Pennsylvania. 1,908 feet, and 101 feet above the Casselman River. The Great Allegheny Passage uses the deck.
Read More