1. Home
  2. ›
  3. Fallen Flags
  4. ›
  5. Seaboard Air Line
  6. ›
  7. Steam Roster

Seaboard Air Line Steam Roster (Post 1900)

Published: October 14, 2026

By: Adam Burns

The Seaboard Air Line’s main line south through the Carolinas was an inland railroad with a sawtooth profile, and the engines below are the ones bought for that railroad after 1900. Light Consolidations and Russian Decapods covered the branches. Mikados and 2-10-2s took the through freight. The passenger engines ran from light Pacifics to 4-8-2s with 72-inch drivers.

Seaboard Air Line 2-6-6-4 No. 2503, class R-1, assisting a pair of FT diesel units about 1945

2-6-6-4 No. 2503, class R-1, assists a pair of FT units, about 1945. The location was not recorded. Ed Olsen photograph. American-Rails.com collection. The five R-1s and five R-2s were sold to the Baltimore & Ohio in 1947.

On this page: At a glance · Switchers · Freight · Articulateds · Passenger engines · Roster

At a glance

ItemDetail
RailroadSeaboard Air Line. Mark SAL. Company history
This tableSteam locomotives built since 1900, in Drury’s class order
Freight backboneQ-3 2-8-2s, numbers 334–451, built 1923–1931. Quantity cell 118
BranchesRussian Decapods, plus Baldwin catalog Decapods D-2 and D-3 on the Montgomery lines
ArticulatedsClass A 2-8-8-2s, sold to the Baltimore & Ohio in 1920. Classes R-1 and R-2, 2-6-6-4s, sold to the Baltimore & Ohio in 1947
Last road steamRoad diesels from 1938. Steam road service reported finished in 1953. Tank engine 1001 worked at Columbus, Georgia, until 1959
Diesels734 locomotives, all-time

Switchers

The standard switchers of the teens were class L-5, thirty Baldwins numbered 1030–1059, built from 1907 to 1913. The heavy switcher of the late steam era was class F-7, fifty Baldwins numbered 1101–1150, built in 1927 and 1928, with front-end throttles, 51-inch drivers, 23×28-inch cylinders, and an engine weight of 180,000 pounds. They lasted to 1953. In 1918 the United States Railroad Administration assigned the railroad ten 0-6-0s. Those are the Cooke engines 1090–1099, class F-5.

The odd switchers are the acquired machines and the tanks. No. 1001, an 0-4-0T built by Baldwin in 1936, worked the street trackage at Columbus, Georgia, until 1959, after the road engines had been reported dieselized. No. 1000, an 0-4-2T, came from the Columbia Belt Line. Nos. 468, 123, 954, and 955 came from the Georgetown & Western. Five 0-8-0s, 1175–1179, were Elgin, Joliet & Eastern engines rebuilt from 2-8-0s.

Freight

Richmond built twenty class L-3 Consolidations in 1902 and 1903, numbers 970–989, with 57-inch drivers, an engine weight of 145,200 pounds, and wide fireboxes. Baldwin’s ten class H engines of 1904, numbers 990–999, kept the 57-inch driver and weighed almost 34,000 pounds more. The last new 2-8-0s were class H-1, twenty Baldwins of 1911, numbers 900–919, with 56-inch drivers, 21×30-inch cylinders, and a weight of about 214,000 pounds. The last of them, No. 919, was superheated, with 25×30-inch cylinders and 48,450 pounds of tractive effort.

The Mikado replaced the Consolidation on the through freight. Class Q, Richmond 1914, numbers 300–318, had 63-inch drivers and weighed 282,000 pounds. The engines began at 185 pounds of pressure with 27×30-inch cylinders, and later carried 26-inch cylinders at 200 pounds, with mechanical stokers added over time. In 1918 the USRA assigned ten light Mikados, class Q-1, numbers 490–499, with mechanical stokers and otherwise the Q-class specification. Class Q-2, Schenectady 1922, numbers 319–333, followed the same modifications.

Class Q-3 was based on the USRA light Mikado: a cast trailing truck with a booster, air pumps on the smokebox front, and 17 inches of extra space between the cylinders and the first drivers. The class is numbered 334–451, quantity 118, built from 1923 through 1931 by Schenectady, Baldwin, Richmond, and the Seaboard’s own shops. Drury’s prose gives a total of 117 and describes No. 451, built in 1931 from the remains of No. 441 after a boiler explosion. Eight more Mikados, class Q-4, numbers 480–487, came from the Wabash. They had been built in 1912.

Seaboard Air Line 2-8-2 No. 392, class Q-3, in the 1950s

2-8-2 No. 392, class Q-3, in the 1950s. The location was not recorded. Ed Olsen photograph. American-Rails.com collection. No. 392 is one of 334–451.

The USRA allocated the railroad twenty Russian Decapods, and the engines suited the logging and phosphate branches in Florida, where the rail was light. Fourteen more followed. In the table the Russian engines are classes D, D-1, D-4, and D-5, built in 1918 by Richmond, Baldwin, and Brooks. Classes D-2 and D-3 are catalog Baldwin Decapods. The Georgia, Florida & Alabama bought six, which became 523–528 when the Seaboard bought that railroad in 1928, and the Seaboard ordered eight more, 529–536, in 1930. D-2 and D-3 worked principally between Montgomery and Savannah and between Montgomery and Bainbridge.

Two classes of 2-10-2s stayed east of the articulated experiment. Class B, Baldwin 1918, numbers 2400–2409, had been 400–409 until a renumbering in 1925. They had 63-inch drivers, 29×32-inch cylinders, and weighed 336,000 pounds, and they worked out of Hamlet, principally west to Charlotte and Rutherfordton. Class B-1, Baldwin 1919, numbers 2485–2499, had been 485–499. They were USRA light 2-10-2s, with 57-inch drivers and a weight of 352,000 pounds, and they were assigned to Atlanta–Birmingham. Both classes were recounterbalanced with disk main drivers. The USRA engines outlasted class B. The B-1 retirement cell runs to 1953. Class B’s runs to 1950.

Articulateds

Class A was sixteen compound 2-8-8-2s, Richmond 1917 and 1918, numbers 500–515, with 63-inch drivers, bought for the Hamlet–Richmond freight. They were too large for that railroad. In 1920 they were sold to the Baltimore & Ohio and converted there to simple 2-8-8-0s.

The engines the Seaboard kept were the single-expansion 2-6-6-4s. Class R-1, Baldwin 1935, numbers 2500–2504, had 69-inch drivers, four 22×30-inch cylinders, 230 pounds of pressure, an engine weight of 480,000 pounds, and 82,300 pounds of tractive effort, with Baker valve gear, an Elesco feedwater heater, and alligator crosshead guides. Class R-2, Baldwin 1937, numbers 2505–2509, used Walschaerts valve gear, a Worthington feedwater heater, and a single crosshead guide. Their territory was beyond Hamlet, to Atlanta and Birmingham, and north from Norlina to Portsmouth. Both classes were sold to the Baltimore & Ohio in 1947. No. 2503, at the top of this page, is an R-1.

Passenger engines

The first Pacifics were light engines, 214,400 pounds, delivered as 1–20 and renumbered 851–870, class P. Baldwin built the first of them in 1911 and five more in 1912. Richmond built seven in 1913, including replacements for two lost in a head-on collision. In 1940 the railroad streamlined Nos. 865 and 868 for the Silver Meteor section between Wildwood, Tampa, and St. Petersburg. The freight Pacifics were class P-1, numbers 800–849, quantity 50, built by Baldwin and Richmond in 1912 and 1913, with 63-inch drivers, 22×28-inch cylinders, an engine weight of 220,000 pounds, and 33,826 pounds of tractive effort. After the Mikados arrived, the Seaboard rebuilt 41 of the P-1s and reclassed those rebuilds P-2 and P-3. Drury’s grid keeps them on the P-1 row. Class P-4, numbers 871–880, was bought from the Western Maryland during the Second World War. Baldwin had built them in 1909 and 1911. They had 69-inch drivers and weighed 201,700 pounds.

The Mountains began with class M, numbers 200–214. Richmond built 200–209 in 1914 and Schenectady built 210–214 in 1917: 69-inch drivers, 27×28-inch cylinders, 316,000 pounds. Class M-1, numbers 215–224, Schenectady 1922, was ten engines almost identical to class M. Class M-2, numbers 235–270, thirty-six Baldwins of 1924–1926, had 72-inch drivers, no boosters, cast trailing trucks, and small Vanderbilt tenders. They were hand-fired. Some later received stokers or burned oil, and some later carried 12-wheel tenders or enlarged tanks. They began on Richmond–Hamlet–Savannah and later reached Atlanta, Tampa, and Miami.

The Twelve-Wheelers are classes L-2, L-2-S, and L-4-S, all typed 4-8-0. Class L-2, numbers 600–649, quantity 49, was built by Richmond and Baldwin in 1910. Class L-4-S, ten Baldwins of 1910, was rebuilt from class K in 1933. The single engine still classed K in the grid is No. 658, a Baldwin of 1915 from the Carolina, Atlantic & Western. Road diesels took the Florida passenger trains in 1938. The railroad reported steam road service finished in 1953. The Columbus tank engine ran until 1959.

Roster

Columns follow Drury’s grid: type, class, road numbers, quantity, builder, year built, year retired, and notes. A blank class cell means the grid left the class blank. “Odd” is the class Drury prints on the four-wheel switchers. Predecessor initials in the notes are Carolina, Atlantic & Western (CA&W), Charlotte Harbor & Northern (CH&N), Georgia, Florida & Alabama (GF&A), Tampa & Gulf Coast (T&GC), and Tampa Northern (TN).

TypeClassNumbersQtyBuilderBuiltRetiredNotes
0-4-0Odd4681Baldwin19011917Ex-Georgetown & Western
0-4-0TOdd10021Baldwin19121936
0-4-0TOdd10031Baldwin19131949
0-4-0TOdd10011Baldwin19361959Columbus, Georgia, street trackage
0-4-2T—10001Porter19001914Ex-Columbia Belt Line
0-6-0—1231Richmond1900Sold 1917Ex-Georgetown & Western
0-6-0—1251Pennsylvania19031930Ex-Jefferson Construction Co.
0-6-0—1000, 10012Baldwin19071930Ex-GF&A, ex-TN
0-6-0—10261Baldwin19151937Ex-CA&W
0-6-0F-21016–10205Rhode Island1900–1935
0-6-0F-31006–10094Pittsburgh1900–1930
0-6-0F-41010–10156Pittsburgh1901–1930
0-6-0F-51090–109910Cooke1918–1952USRA
0-6-0F-71101–115050Baldwin1927–1928–1953
0-6-0L-51030–105930Baldwin1907–1913–1952
0-8-0F-91175–11795Pittsburgh1904–1905–1949Ex-Elgin, Joliet & Eastern, built as 2-8-0
2-8-0—920–9245Baldwin1906–19131946, 1949Ex-GF&A 200–204
2-8-0—925, 9262Baldwin1910, 19111933, 1936Ex-CH&N 17, 18
2-8-0—927, 9282Richmond19131949, 1941Ex-CH&N 50, 51
2-8-0—929–9324Baldwin19201950–1951Ex-CH&N 71–74
2-8-0—954, 9552Baldwin19001916Ex-Georgetown & Western
2-8-0H990–99910Baldwin1904–1938
2-8-0H-1900–91920Baldwin1911–1950
2-8-0H-2933–9375Schenectady1910–19121948–1949Ex-Chicago & North Western
2-8-0L-3970–98920Richmond1902–1903–1935
2-8-2Q300–31819Richmond1914–1952
2-8-2Q-1490–49910Schenectady19181950USRA
2-8-2Q-2319–33315Schenectady1922–1952
2-8-2Q-3334–451118Schenectady, Baldwin, Richmond, Seaboard1923–1931–1955451 built in 1931 from the remains of 441
2-8-2Q-4480–4878Richmond, Baldwin19121946–1950Ex-Wabash
2-10-0D500–52021Richmond1918–1951Russian Decapod
2-10-0D-1521, 5222Baldwin19181949, 1950Russian
2-10-0D-2523–5286Baldwin1924, 19261951–1953Ex-GF&A. Catalog Baldwin engines
2-10-0D-3529–5368Baldwin19301952–1953
2-10-0D-4540–5467Brooks19181949–1950Russian
2-10-0D-5547–5504Baldwin, Richmond, Brooks19181949–1951Russian
2-10-2B2400–240910Baldwin19181948–1950Originally 400–409, renumbered 1925
2-10-2B-12485–249915Baldwin19191950–1953Originally 485–499. USRA light 2-10-2
2-6-6-4R-12500–25045Baldwin1935Sold 1947Sold to the Baltimore & Ohio. 2503 is the photograph above
2-6-6-4R-22505–25095Baldwin1937Sold 1947Sold to the Baltimore & Ohio
2-8-8-2A500–51516Richmond1917–1918Sold 1920Sold to the Baltimore & Ohio and converted to simple 2-8-8-0s
4-4-0—1011Baldwin19051936Ex-GF&A
4-4-0—1031Baldwin19131933Ex-CH&N
4-4-0—1221Baldwin19131933Ex-CH&N
4-4-0—1661Baldwin19011924Ex-Georgetown & Western
4-4-0G-1180–1845Rhode Island19141936Ex-CA&W
4-4-0G-2185–19915Baldwin19001903
4-6-0—684–6885Baldwin1901–19061930, 1936Ex-GF&A
4-6-0—6891Baldwin19101934Ex-CH&N
4-6-0—690, 6922Baldwin19071930
4-6-0—693–6953Baldwin1914–1936Ex-Tampa Northern
4-6-0I-55811Richmond——Ex-T&GC
4-6-0I-51575–159924Richmond19001916
4-6-0I-12671–68010Baldwin1900–19011928–1933
4-6-0I-13681–6833Baldwin1909–19131936–1948
4-6-0K6581Baldwin1915–1946Ex-CA&W
4-8-0L-2600–64949Richmond, Baldwin19101940
4-8-0L-2-S652–654, 6594Baldwin1902–19071936–1950
4-8-0L-4-S650, 651, 655–657, 660–66410Baldwin1910–1950Rebuilt from K, 1933
4-6-2P851–87020Richmond, Baldwin1911–1913–1952
4-6-2P-1800–84950Baldwin, Richmond1912–1913–1951
4-6-2P-4871–88010Baldwin1909, 1911–1952Bought from the Western Maryland in the Second World War. Those are the Western Maryland build years
4-8-2M200–21415Richmond, Schenectady1914, 1917—
4-8-2M-1215–22410Schenectady1922–1950
4-8-2M-2235–27036Baldwin1924–1926–1954

Related reading on American-Rails.com

Sources

  • George H. Drury, Guide to North American Steam Locomotives, revised edition, pp. 290–293. Chapter by Albert M. Langley, Jr., and W. Forrest Beckum, Jr. The class grid above, including builders, dates, quantities, and notes. Prose dimensions for the L-3, H, H-1, Q, Q-1, Q-3, F-7, Russian Decapods, D-2, D-3, classes B and B-1, classes A, R-1, and R-2, and the Pacifics and Mountains. No. 451 built in 1931 from the remains of No. 441. Pacifics delivered as 1–20. Nos. 865 and 868 streamlined in 1940. Forty-one P-1s rebuilt and reclassed P-2 and P-3. Class A sold in 1920 and converted to simple 2-8-8-0s. Classes R-1 and R-2 sold in 1947. E4s on the Florida trains in 1938. USRA assignment of ten 0-6-0s and ten light Mikados, and an allocation of twenty Russian Decapods with fourteen more acquired. Georgia, Florida & Alabama bought in 1928. Drury recommends the ACL & SAL Historical Society, www.aclsal.org, and Richard E. Prince, Seaboard Air Line Railway: Steam Boats, Locomotives, and History (1969). He also cites Albert E. Langley Jr., W. Forrest Beckum Jr., and C. Ronnie Tidwell, Seaboard Air Line Railway Album (Union Station Publishing, 1988). Published rosters: Railroad magazine, May 1935, p. 88, and September 1948, p. 114.
  • Predecessor abbreviations on p. 293: CA&W, Carolina, Atlantic & Western; CH&N, Charlotte Harbor & Northern; GF&A, Georgia, Florida & Alabama; T&GC, Tampa & Gulf Coast. Tampa Northern and the Elgin, Joliet & Eastern appear in the same notes.
  • Road dieselization reported complete in 1953, with 0-4-0T 1001 at Columbus, Georgia, until 1959, as carried with the class grid. The company page holds the corporate history and the merger date of July 1, 1967.

Recent Articles

  1. Colfax Moves a Wood Caboose Beside the 1905 Depot

    Nov 29, 26 02:11 PM

    The Colfax caboose, built in 1924 as Northwestern Pacific 28, was moved on November 12, 2026, to a track beside the 1905 depot.

    Read More

  2. Fort Caspar Unloads Standard Oil No. 1

    Nov 29, 26 02:07 PM

    Oil City News says Standard Oil No. 1 was unloaded at Fort Caspar Museum on October 21, 2026. Repairs are planned over the next few years.

    Read More

  3. Greenville Junction Friends Finish an Eighteen-Year Depot Restoration

    Nov 29, 26 02:05 PM

    WABI says volunteers finished an 18-year, $1.3 million restoration of the Greenville Junction depot. The Friends about page still describes waiting-room work in 2026.

    Read More

  4. Indiana and Ohio Railway Asks To Drop Cincinnati Signals

    Nov 29, 26 01:46 PM

    iory-gp7-53-rb.jpg
    The Indiana and Ohio Railway asked the Federal Railroad Administration to discontinue centralized traffic control in Cincinnati. Comments are due December 21, 2026.

    Read More

  5. Fort Madison Bridge Derails Draw a Comment Request

    Nov 29, 26 01:41 PM

    BNSF asked the Federal Railroad Administration for approval to remove fixed derails at the Fort Madison movable bridge. Comments are due December 21, 2026.

    Read More

  6. MARC Asks To Keep an Eight-Year Brake Interval

    Nov 29, 26 01:32 PM

    marc-barnesville-md-dk.jpg
    MARC Train Service asked the Federal Railroad Administration to keep an eight-year brake maintenance interval on its HHP-8 locomotives. Comments are due December 21, 2026.

    Read More

  7. New Jersey Transit Asks To Retire Bergen County Signals

    Nov 29, 26 01:26 PM

    njt-hoboken-trainsets.jpg
    NJ Transit asked the Federal Railroad Administration to retire fixed automatic block signals on the Bergen County Line in Rutherford. Comments are due December 21, 2026.

    Read More

  8. Emergency Escape Breathing Apparatus Hours Drop to 1,232

    Nov 29, 26 12:48 PM

    FRA estimates 1,232 hours a year for emergency escape breathing apparatus records, down from 1,670. Comments are due January 25, 2027.

    Read More

  9. Crashworthiness Paperwork for Locomotives Stays at 407 Hours

    Nov 29, 26 12:44 PM

    ns-island-ave-yard-dk.jpg
    FRA is extending the locomotive crashworthiness information collection at 407 hours and 554 responses. Comments are due January 25, 2027.

    Read More

  10. Positive Train Control Reporting Hours Rise to 53,174

    Nov 29, 26 12:37 PM

    csx-willard-2023-dk.jpg
    FRA estimates 53,174 hours a year for positive train control and signal-system reporting, up from 51,931. Comments are due January 25, 2027.

    Read More

  11. Railroad Safety Appliance Checklists Stay at 142 Hours

    Nov 29, 26 12:18 PM

    necr-3015-veterans.jpg
    FRA is extending 18 safety-appliance checklist forms at 142 hours and 142 responses. Comments are due January 25, 2027.

    Read More

  12. Wisconsin Castle Christmas Trains Leave East Troy Depot

    Nov 29, 26 11:40 AM

    east-troy-electric-christmas.jpg
    East Troy Railroad Museum is sending its 2026 Christmas trains to a new workshop at the Castle. Daytime and evening trips leave the East Troy Depot.

    Read More

  13. Hocking Valley Scenic Santa Trains Through December 20

    Nov 29, 26 11:23 AM

    hvsr-santa-trains.jpg
    Hocking Valley Scenic Railway lists Santa trains from November 28 through December 20, 2026. The adult fare is $26 for a trip of about two hours.

    Read More

  14. Cajon Pass (Railroad Grade): Map, History, Accident

    Nov 28, 26 11:47 PM

    206029348237162461u51i6892907890.jpg
    Cajon Pass, the Santa Fe grade between the San Bernardino and San Gabriel mountains. The 1885 line, the 1913 track, the Palmdale Cutoff, and the San Bernardino wreck of 1989.

    Read More

  15. Richmond's Triple Crossing (Virginia)

    Nov 28, 26 11:43 PM

    861514685892509268718268939807.jpg
    Richmond's Triple Crossing, three railroad levels at Sixteenth and Dock. The West Point line, the Seaboard viaduct of 1900, and the Chesapeake & Ohio elevated line.

    Read More

  16. Sand Patch Grade (Pennsylvania): Map, Route, History

    Nov 28, 26 07:04 PM

    1827412389592835723792869826246.jpg
    Sand Patch Grade, the Baltimore & Ohio summit in Somerset County, Pennsylvania. The 1871 tunnel, the double-track bore finished in 1912, and the grades in the 1913 account.

    Read More

  17. Southern's "Rathole Division": Map, History, Photos

    Nov 28, 26 06:49 PM

    90341235790078544579888.jpg
    The Rathole, the tunnel section of the Cincinnati Southern between Wilmore, Kentucky, and Emory Gap, Tennessee. Twenty-seven bores, the Cincinnati, New Orleans and Texas Pacific lease, and the clearan…

    Read More

  18. Northeast Corridor: History, High-Speed Rail, Services

    Nov 28, 26 11:41 AM

    2731482198472585010280600789.jpg
    The Northeast Corridor from Boston to Washington. Separate railroads, then one electrified route. Amtrak owns 363 of the 457 miles. Acela, the Northeast Regional, and the commuter railroads share the…

    Read More

  19. Helmstetter's Curve (Western Maryland): Map, History, Photos

    Nov 28, 26 11:37 AM

    30otp305-50i2820598433dfj5893.jpg
    Helmstetter's Curve, the Western Maryland horseshoe in Cash Valley, outside Corriganville, Maryland. Trestle, then fill. The Connellsville Extension opened August 1, 1912. Scenic trains still run…

    Read More

  20. Santa Cruz Freight Discontinuance Is Set for December 30

    Nov 28, 26 11:28 AM

    St. Paul & Pacific Railroad filed to discontinue service over approximately 28.39 miles in Santa Cruz County. The exemption is effective December 30, 2026, unless stayed.

    Read More

  21. Board Lets Justice and Transportation Supplement Merger Comments

    Nov 28, 26 11:26 AM

    The Surface Transportation Board let the Justice Department and the Transportation Department file merger supplements on or before January 15, 2027. Initial comments are still expected on December 3.

    Read More

  22. Federal Warning on Battery Fires in Passenger Railcars

    Nov 28, 26 11:23 AM

    The Federal Railroad Administration warned that lithium-ion batteries in e-bikes and scooters can create life-threatening heat in a passenger railcar within 20 to 60 seconds.

    Read More

  23. Northern Indiana Asks to Run Three Trains Without PTC

    Nov 28, 26 11:20 AM

    sshore-train-micindi-dk.jpg
    The Northern Indiana Commuter Transportation District asked to run trains 35, 432, and 601 without positive train control for about three hours on one night. Comments are due December 7, 2026.

    Read More

  24. Alameda Belt Line Exemption Is Now Effective at the Ports

    Nov 28, 26 10:46 AM

    The Surface Transportation Board made an Alameda Belt Line operating exemption effective on November 12, 2026. Pacific Harbor Line keeps operating authority.

    Read More

  25. Acela Adds More Than 40 Weekday NextGen Trips

    Nov 28, 26 10:41 AM

    amtrak-new-acelaset.jpg
    Amtrak said on November 17 that the NextGen Acela schedule listed more than 40 weekday trips, 25 Saturday trips, and 32 Sunday trips.

    Read More

  26. Amtrak Expands Its Airo Fleet With Eight 10-Car Trains

    Nov 28, 26 10:19 AM

    amtrak-new-airo-set.jpg
    Amtrak plans eight 10-car Airo trainsets for the Northeast Regional, expected to begin entering service in 2031. Each set is to seat more than 640 customers.

    Read More

  27. CSX Asks to Run Five Trains Past the 1,000-Mile Brake Test

    Nov 28, 26 10:14 AM

    csx-lagrangeky2010-dk.jpg
    CSX Transportation asked the Federal Railroad Administration to let five trains pass the 1,000-mile brake test and run as far as 1,500 miles. Comments are due January 25, 2027.

    Read More

  28. Illinois Central Line Draws a Bogalusa Central Notice

    Nov 28, 26 09:34 AM

    Bogalusa Central Railroad filed to acquire approximately 95.5 miles from the Illinois Central. Patriot Rail filed to continue in control. Consummation may follow December 5, 2026.

    Read More

  29. Short Lines Ask to Extend an Hours of Service Waiver

    Nov 28, 26 09:32 AM

    housatonic_1511_gp151.jpg
    The American Short Line and Regional Railroad Association asked the Federal Railroad Administration to extend an hours of service waiver. Comments are due January 25, 2027.

    Read More

  30. Federal Audit Finalizes the Ohio Rail Environmental Review

    Nov 28, 26 09:27 AM

    The Federal Railroad Administration finalized the first-year audit of Ohio rail environmental reviews. Two public comments did not change the draft report.

    Read More

  31. Northern Indiana Commuter District Plans an Operating Ask

    Nov 28, 26 09:24 AM

    ssl-2013-michigancity.jpg
    The South Shore Line plans to ask the state for another $35 million a year in operating help. A November 23 letter says a South Bend airport project was not selected in this grant round.

    Read More

  32. Snoqualmie Pass (Railroad): Tunnel, Map, History

    Nov 27, 26 11:48 PM

    02935273572838752890296893983079.jpg
    Snoqualmie Pass and Tunnel 50 on the Milwaukee Road. The Cascade bore in Washington, the grades in the 1912 and 1917 accounts, and the trains that used the line.

    Read More

  33. Eagle Nest Tunnel and Bridge (Milwaukee Road)

    Nov 27, 26 11:25 PM

    90582j57j284030370.jpg
    Eagle Nest Tunnel, Milwaukee Road tunnel No. 4, and trestle CC188 in the Belt Mountains of Montana. The Olympian, the Olympian Hiawatha, and the 1961 trolley raise.

    Read More

  34. Tunkhannock Viaduct (PA): The Nicholson Bridge

    Nov 27, 26 11:05 PM

    5182399671523r1g1i09967980.jpg
    Tunkhannock Viaduct at Nicholson, Pennsylvania, the Lackawanna concrete bridge of November 6, 1915. 2,375 feet long and 240 feet above Tunkhannock Creek. Norfolk Southern still crosses.

    Read More

  35. The "GM6C": A Modern Freight Electric

    Nov 27, 26 09:56 PM

    gm6c-1975-rj.jpg
    Electro-Motive GM6C, one 6,000-horsepower electric freight demonstrator. Tested from 1975 on the Penn Central and Conrail. Order 75606, serial 75606-1. Returned to La Grange and scrapped.

    Read More

  36. BNSF Asks to Keep Extended Haul Trains at 1,702 Miles

    Nov 27, 26 11:59 AM

    bnsf-ardmore.jpg
    BNSF asked the Federal Railroad Administration to extend relief so certain extended haul trains may run up to 1,702 miles. Comments are due January 25, 2027.

    Read More

  37. Lake Providence Feeder Case Draws a Filing Schedule

    Nov 27, 26 11:51 AM

    The Surface Transportation Board on November 27, 2026, published notice of the Lake Providence Port Commission amended feeder-line application and set filings through March 29, 2027.

    Read More

  38. Solon Seeks Residual Rights on a Banked Norfolk Southern Line

    Nov 27, 26 11:50 AM

    The City of Solon, Ohio, filed to acquire Norfolk Southern residual common carrier rights on approximately 6.5 miles of rail-banked line, from milepost RH 15.0 to RH 21.5.

    Read More

  39. Brookfield Keeps 103 Carriers Under a Three-Group Plan

    Nov 27, 26 11:47 AM

    The Surface Transportation Board on November 27, 2026, published Brookfield Corporation notice FD 36960, regrouping 103 U.S. rail carriers into three companies that Brookfield would still control.

    Read More

  40. Freight Railroads Welcome a Senate Permitting Bill

    Nov 27, 26 11:41 AM

    iais-518-dk.jpg
    The Association of American Railroads on November 19, 2026, welcomed Senate passage of the Bipartisan American Affordability and Jobs Act of 2026 and urged the House to advance the bill.

    Read More

  41. Shortline Select Adds Modesto and Temple

    Nov 27, 26 11:31 AM

    met-rp20bd-dk.jpg
    BNSF added the Modesto and Empire Traction Company and the Temple and Central Texas Railway to Shortline Select. The railroad said the program now includes 12 short lines.

    Read More

  42. Pittsburgh Marks the Inaugural Second Pennsylvanian

    Nov 27, 26 11:24 AM

    pennsylvanian-eastpittsburgh-2024-dk.jpg
    The second daily Pennsylvanian made its inaugural run on November 18, 2026. PennDOT said it will allocate $318.7 million in state and federal funding toward the expansion.

    Read More

  43. RailTrends Speakers Recap a Year of Listening

    Nov 27, 26 11:08 AM

    ns-9473-c409w.jpg
    Jim Vena and Mark George told RailTrends 2026 that a year of talks supports a simpler network, with about 88,000 new single-line lanes and about $3.5 billion in annual shipper savings.

    Read More

  44. CSX Will Serve the Niron Magnetics Plant in Dothan

    Nov 27, 26 10:46 AM

    CSX on November 23, 2026, joined Niron Magnetics in announcing a $1.8 billion magnet campus on the rail-served Westgate Super Site in Dothan, Alabama.

    Read More

  45. Board Proposes Changes to Trail Use and Railbanking

    Nov 27, 26 10:44 AM

    nbrt-davisville-wv-2002.jpg
    The Surface Transportation Board on November 24, 2026, proposed to take interim trail-use negotiations outside its process. Comments are due January 8, 2027.

    Read More

  46. Farm Bureau Asks the Board to Reject the UP-NS Merger

    Nov 27, 26 10:43 AM

    The American Farm Bureau Federation on November 24, 2026, asked the Surface Transportation Board to reject the Union Pacific application to acquire Norfolk Southern.

    Read More

  47. U.S. Rail Traffic Rose 4.7 Percent in the Week Ending November 21

    Nov 27, 26 10:33 AM

    fcen-dk-frt-fl.jpg
    U.S. railroads moved 540,111 carloads and intermodal units in the week ending November 21, 2026, up 4.7 percent, the Association of American Railroads reported.

    Read More

  48. Tulip Viaduct Bridge (Indiana): Trains, Map, History

    Nov 26, 26 12:03 AM

    8825220426824i26724824920096828429.jpg
    Tulip Viaduct, the railroad bridge over Richland Creek in Greene County, Indiana. Opened accounts give 2,215 feet, 2,295 feet, and 2,000 feet. The Indiana Rail Road still crosses.

    Read More

  49. "Super Chief" (Train): Schedule, Interior, Route

    Nov 25, 26 11:40 PM

    40380022_1981524322139495_3380777098955194368_n.jpg
    The Santa Fe Super Chief, Chicago to Los Angeles, May 12, 1936 to May 18, 1974. The 39-hour-and-45-minute card, the Budd rooms, Fred Harvey, and the Turquoise Room.

    Read More

  50. Salisbury Viaduct: From Trains To Recreational Use

    Nov 25, 26 03:05 PM

    salisbury-viaduct-distant.jpg
    Salisbury Viaduct, the Western Maryland bridge west of Meyersdale, Pennsylvania. 1,908 feet, and 101 feet above the Casselman River. The Great Allegheny Passage uses the deck.

    Read More