1. Home
  2. ›
  3. Fallen Flags
  4. ›
  5. Virginian Railway
  6. ›
  7. Steam Roster

Virginian Railway Steam Roster (Post 1900)

Last revised: October 16, 2026

By: Adam Burns

Virginian steam was built for one hill and one commodity. Clark’s Gap, east out of Elmore, was thirteen miles of crooked 2 percent, with a maximum of 2.07 percent, and every eastbound load of coal had to climb it. The railroad answered with Mallets, a Triplex, the only successful 2-10-10-2s, and, late, eight 2-6-6-6s and five 2-8-4s. The class letters are the company’s own system. The first letter is the wheel arrangement: S for a switcher, C for a Consolidation, M for a Mikado, B for a Berkshire, A for an articulated, P for a Pacific, T for a Ten-Wheeler, E for an Eight-Wheeler. The second letter is the series. Class MA is M for Mikado and A for the first series. The table is E. W. King, Jr.’s grid, in George H. Drury’s Guide to North American Steam Locomotives, for locomotives built since 1900.

Virginian Railway 2-6-6-6 No. 902, class AG, with a train of empties over the Elizabeth River at Norfolk in December 1954

2-6-6-6 No. 902, class AG, with a train of empties over the Elizabeth River at Norfolk in December 1954. The train appears to be headed west. Author’s collection. Lima built Nos. 900–907 in 1945. They weighed 753,000 pounds.

On this page: The first engines · Clark’s Gap · The Triplex · 2-10-10-2s and the USRA engines · 1945 and 1946 · Passenger locomotives · The class grid

The first engines

Deepwater’s first locomotive, acquired in 1903, was an 0-6-0 built at the Pennsylvania Railroad’s Altoona shop in 1873. It is older than this table. Three light 2-8-0s, Deepwater Nos. 2–4, came from Richmond in 1904 and 1905 and became Virginian 300–302, class CA. Two 51-inch Mikados, Deepwater 30 and 31, came from Baldwin late in 1905 and became class MA, Nos. 400 and 401. The Tidewater’s two little Consolidations, Nos. 5 and 6, became class CB, Nos. 303 and 304, Baldwin, 1905. Four more light Mikados, similar to 30 and 31, arrived in 1907 as MA Nos. 402–405. Consolidations 306 and 307, class CD, came from nearby short lines. No. 305, class CC, was not delivered until 1909. Those Consolidations were 60-ton engines with 20-by-24-inch cylinders. All of them, and the six MA Mikados, were scrapped in 1933.

The first switchers were class SA. Richmond built Nos. 1–3 in 1909, and Baldwin built Nos. 4 and 5 in 1910. The last steam the railroad bought, in 1950, was another switcher class. Fifteen secondhand 0-8-0s came from the Chesapeake & Ohio at a bargain price, while that railroad was dieselizing. They were Lima products of 1942 and 1943, they kept their Chesapeake & Ohio numbers, 240–254, and they were classed SB. They replaced class MB Mikados in yard service and were scrapped in 1957–1959.

Clark’s Gap

The all-purpose engine was the class MB Mikado. Baldwin built 42 of them, Nos. 420–461, between May 1909 and August 1910, with 56-inch drivers. They switched, they hauled coal, they worked the work trains, and they ran passenger trains. They were built hand-fired and saturated. All of them later received stokers and superheaters. In 1912 the railroad added 18 heavier Mikados, class MC, Nos. 462–479, and the tractive effort went over 60,000 pounds.

The first big articulateds were for the Gap. Class AA, Nos. 500–503, came from Richmond in 1909, hand-fired and non-superheated. All but No. 503 were later superheated. The railroad stationed relief firemen along the hill to help them over the humps. In 1910 Baldwin delivered eight more 2-6-6-0s, class AC, Nos. 510–517. They had two firedoors, they were more powerful than many 2-6-6-2s, and they too required relief firemen until stokers and superheaters were applied. Both classes were scrapped in 1933.

The summer of 1912 brought the class AD 2-8-8-2s, Nos. 601–604 from Richmond that year and 605 and 606 in 1913. They had 56-inch drivers, 28-inch high-pressure cylinders, and 44-inch low-pressure cylinders. Simple tractive effort was 138,000 pounds, and compound was 114,000 pounds. King calls them 270-ton locomotives, and possibly the largest in the world at the time. A train of 58 loads could leave Elmore for Clark’s Gap at 7 miles an hour with an AC on the head end and two ADs pushing. The two pushers cut off at the top of the hill, and the AC took the train on into Princeton. From Princeton to Roanoke, one MC could move 80 loads with an MB pushing from Whitethorne over Merrimac Grade. From Roanoke to Norfolk, one MC handled 100 loads alone, a train King puts at 7,500 tons.

Virginian Railway 2-8-2 No. 462, class MC, switching the yard at Norfolk in December 1954

2-8-2 No. 462, class MC, switching the yard at Norfolk in December 1954. Photographer unknown. Author’s collection. Baldwin built Nos. 462–479 in 1912. Five of them were later rebuilt as class MCA.

Between 1938 and 1941 the Princeton shop rebuilt five of those MC engines, Nos. 472, 466, 470, 475, and 463, with disk drivers and lightweight rods. They became class MCA, Nos. 480–484. The major specifications were unchanged, and the chapter does not say which old number became which new one. They were still not fast enough for the time freights east of Roanoke. The railroad bought five virtual duplicates of the Chesapeake & Ohio’s K-4 Kanawhas from Lima in 1946, class BA, Nos. 505–509, with 69-inch drivers. The fastest run attributed to one of them is hedged in the chapter: No. 505 was said to have made 87 miles an hour with a 3,500-ton train on a detour over the Norfolk & Western.

The Triplex

Baldwin delivered one experimental Triplex in 1916, class XA, No. 700, a 2-8-8-8-4. It had six 34-by-32-inch cylinders and 56-inch drivers. Simple tractive effort was 199,560 pounds, and compound was 166,300 pounds. The type’s defect was the same one the Erie Triplexes had shown. Adhesive weight on the tender engine fell as coal and water were used, and the rear engine exhausted through its own stack, so only half the exhaust was available to draft the fire. No. 700 often ran out of steam. The boiler could not sustain the simple starting effort for more than a couple of revolutions, and 166,300 pounds compound was not a dependable figure. Baldwin had sent it out as an experiment, to be accepted if it worked. It was not accepted. In 1920 it went back to Baldwin.

The rebuild used new 28-inch high-pressure cylinders and 44-inch low-pressure cylinders, and a new frame. The boiler and the frames became a 2-8-8-0, class AF, No. 610, rated the same as the AD 2-8-8-2s. It was later given a trailing truck and worked as a 2-8-8-2, still numbered 610, and it lasted until 1953. The tender was given a pair of 22-inch cylinders and placed under a new boiler and tender. That locomotive was a 2-8-2, class MD, No. 410, rated the same as an MC, and it too lasted until 1953. The table lists 700, 610, and 410 as three rows. They are one locomotive and the two engines made from it. The low-pressure cylinders of the rebuild kept slide valves, which the Virginian also specified on its new 4-4-0s and 4-6-0s, and on some of its other Mallets, years after most railroads had gone to piston valves.

2-10-10-2s and the USRA engines

Alco’s Schenectady Works built ten 2-10-10-2s in 1918, class AE, Nos. 800–809. King calls their usable tractive effort the high-water mark: 176,600 pounds simple and 147,200 pounds compound, and unlike the Triplex they could produce it and sustain it. Their own page is the class AE article. After the electrification of 1925, the motors on the mountain ran at 14 miles an hour and doubled the speed the AEs had been making there. The 2-10-10-2s then worked easier grades into the early 1950s. The grid dates their scrapping to 1948–1958.

During the federal control of the First World War the railroad was assigned five standard 2-8-8-2s, already lettered 900–904. It refused them. They could not do the work of the AEs. They were sold to the Norfolk & Western, where they became class Y-3, Nos. 2000–2004, the first of fifty such engines. They are not rows in this table. The Norfolk & Western steam roster carries the Y-3. The numbers 900–907 were used again in 1945, for a different locomotive.

What the railroad did take from the United States Railroad Administration were twenty 2-8-8-2s, class USA, Nos. 701–720, built at Richmond in 1919, and fifteen duplicates, class USB, Nos. 721–735, built at Richmond in 1923. They lacked the AE’s punch on Clark’s Gap. They worked mine runs, heavy switching, and helper service over Merrimac Grade. In the mid-1930s Princeton rebuilt six of the USB engines, raising the boiler pressure to 250 pounds and adding Worthington BL feedwater heaters. Those six, Nos. 721, 723, 726, 728, 729, and 733, were reclassed USC. They kept their numbers, and they are not a separate row. In 1947 the railroad bought seven more USRA 2-8-8-2s from the Santa Fe, class USE, Nos. 736–742, built at Schenectady in 1919. They carried the highest boiler pressure on the railroad, 270 pounds. They had been Norfolk & Western Y-3s 2014, 2015, 2021, 2022, 2026, 2029, and 2035, and then Santa Fe 1794, 1792, 1790, 1791, 1793, 1795, and 1796. The chapter gives the three lists and does not pair them one to one. An eighth engine, Santa Fe 1797, which had been Norfolk & Western 2042, was scrapped by the Santa Fe and did not come. The USE engines were recognizable by their Norfolk & Western roll-top tenders and six-wheel Lewis trucks. They were scrapped in 1954 and 1955.

In 1947 and 1948 Princeton rebuilt five more engines with one-piece cast-steel low-pressure engine beds and a bridge-pipe exhaust, the arrangement used on the Norfolk & Western’s modern 2-8-8-2s, and added Worthington feedwater heaters. The five were USA Nos. 701, 702, 703, and 705, and USB No. 735. They were reclassed USD, they were not renumbered, and the major specifications were unchanged. That reclass is not a row either.

One earlier articulated belongs with this heavy power and not with the USRA engines. Class AB, No. 600, a Baldwin 2-8-8-2 of 1910, was built with a separable boiler. The idea did not work. Baldwin fitted a conventional boiler in 1922, and the engine lasted until 1937. The early articulateds, other than No. 610 and the 2-10-10-2s, were scrapped between 1933 and 1937.

1945 and 1946

The east end needed faster freight power during the Second World War. Lima built eight 2-6-6-6s in 1945, class AG, Nos. 900–907, duplicates of the Chesapeake & Ohio’s Alleghenies. The Virginian billed them as the heaviest of the type, at 753,000 pounds, until it was found that the Chesapeake & Ohio’s original 2-6-6-6s weighed 778,000 pounds. The AG engines were scrapped in 1960, as were the five BA 2-8-4s. Some of the MC Mikados and the Pacifics lasted to the same year. The Norfolk & Western had already absorbed the railroad, on December 1, 1959. The class has its own page, and No. 903 at the National Railway Historical Society convention in Roanoke in the summer of 1957 is the photograph there.

Passenger locomotives

The first passenger locomotives were six 4-4-0s, class EA, with 67-inch drivers. Baldwin built them in 1906 and 1907 as Tidewater Nos. 11–16. They became Virginian 100–105, and in 1925 they were renumbered 294–299 so the numbers would not collide with the new electric locomotives. The table lists the 100–105 numbers. The renumbering did not add engines. They were scrapped between 1934 and 1953.

Class TA, Nos. 200–203, four 4-6-0s from Richmond in 1907, had 63-inch drivers. They were slower than the Eight-Wheelers and much stronger on the grades west of Roanoke. Stephenson valve gear, as built, was replaced with Southern valve gear in 1919 and 1920. They were the only Virginian locomotives to use that gear. They were scrapped in 1947 and 1949.

The last and largest passenger locomotives were six Pacifics, class PA, Nos. 210–215, from Richmond in 1920. They had 69-inch drivers and 26-inch cylinders, Duplex stokers, and two cross-compound air pumps under the left running board, with the tender coal bunkers recessed to clear the pumps. They were built at 190 pounds pressure, with a tractive effort of 44,300 pounds. In the late 1930s the pressure was raised to 200 pounds and the tractive effort to 46,634 pounds. They did a considerable amount of freight work during the Second World War, and they were scrapped in 1957–1960.

Virginian Railway 4-6-2 No. 214, class PA, departing Norfolk with train No. 3 at Carolina Junction in October 1954

4-6-2 No. 214, class PA, with train No. 3 departing Norfolk at Carolina Junction, South Norfolk, on an October morning in 1954. The train is crossing the original Norfolk Southern. H. Reid photograph. American-Rails.com collection.

Virginian Railway 4-6-2 No. 212, class PA, on display at the NRHS convention in Roanoke in the summer of 1957

4-6-2 No. 212, class PA, on display at the National Railway Historical Society convention in Roanoke in the summer of 1957. Fred Byerly photograph. American-Rails.com collection. Richmond built Nos. 210–215 in 1920.

The class grid

Each row is a class as Drury prints it. Five of the MC Mikados are also the MCA engines, so those two rows are not ten extra locomotives. Nos. 700, 610, and 410 are the Triplex and its two rebuilds. The USC and USD reclasses are described above and are not given rows. The 1919 engines lettered 900–904 were refused and are not listed. Adding the quantity column counts some locomotives more than once.

TypeClassNumbersQtyBuilderBuiltScrappedNotes
0-8-0SA1–55Richmond, Baldwin1909, 19101934, 19551–3 Richmond, 1909. 4 and 5 Baldwin, 1910
0-8-0SB240–25415Lima1942, 19431957–1959Ex-Chesapeake & Ohio. Bought 1950. Kept those numbers
2-8-0CA300–3023Richmond1904, 19051933Ex-Deepwater 2–4
2-8-0CB303, 3042Baldwin19051933Ex-Tidewater 5 and 6
2-8-0CC3051Richmond19091933
2-8-0CD306, 3072Richmond19071933From nearby short lines
2-8-2MA400–4056Baldwin1905, 19071933400 and 401 ex-Deepwater 30 and 31, 51-inch drivers
2-8-2MD4101Baldwin19211953Rebuilt from 700
2-8-2MB420–46142Baldwin1909–19101938–195956-inch drivers. May 1909–August 1910
2-8-2MC462–47918Baldwin19121953–1960Tractive effort over 60,000 pounds
2-8-2MCA480–4845Baldwin19121955Rebuilt 1938–1941 from 463, 466, 470, 472, and 475
2-8-4BA505–5095Lima1946196069-inch drivers
2-6-6-0AA500–5034Richmond19091933
2-6-6-0AC510–5178Baldwin19101933Two firedoors
2-6-6-6AG900–9078Lima19451960Class page. 753,000 pounds
2-8-8-2AB6001Baldwin19101937Separable boiler. Conventional boiler fitted in 1922
2-8-8-2AD601–6066Richmond1912, 19131934601–604 in 1912. 605 and 606 in 1913
2-8-8-2USA701–72020Richmond19191953–1955
2-8-8-2USB721–73515Richmond19231954, 1955
2-8-8-2USE736–7427Schenectady19191954, 1955Ex-Santa Fe. Bought 1947. Boiler pressure 270 pounds
2-10-10-2AE800–80910Schenectady19181948–1958Class page. 176,600 pounds simple, 147,200 compound
2-8-8-0AF6101Baldwin19211953Rebuilt from 700. Later worked as a 2-8-8-2, still 610
2-8-8-8-4XA7001Baldwin19161920Returned to Baldwin. Rebuilt as 610 and 410
4-4-0EA100–1056Baldwin1906, 19071934–1953Ex-Tidewater 11–16. Renumbered 294–299 in 1925
4-6-0TA200–2034Richmond19071947, 194963-inch drivers. Southern valve gear, 1919–1920
4-6-2PA210–2156Richmond19201957–196069-inch drivers

Related Reading

Sources

  • E. W. King, Jr., “Virginian,” in George H. Drury, Guide to North American Steam Locomotives, revised edition, pp. 320–323. The class grid, the grade and the 58-load, 80-load, and 100-load assignments, the Triplex and its rebuild, the refused 900–904, the AE ratings, the USC and USD reclasses, the USE purchase, the SB purchase, and the passenger-locomotive specifications.
  • H. Reid, The Virginian Railway (Kalmbach, 1961). Published rosters named in the chapter: Railroad, April 1937, p. 71, and July 1951, p. 106; Trains, January 1950, p. 25. The Norfolk & Western Historical Society, nwhs.org, is the society named on p. 323.

Recent Articles

  1. Texas and Pacific Railway: Map, History, Timetables

    Nov 10, 26 10:33 PM

    1570098ujliu5009i1757093875.jpg
    The Texas & Pacific Railway, the federally chartered southern transcontinental that stopped at Sierra Blanca and became the Missouri Pacific's Texas and Louisiana main line. Merged October 15, 1976.

    Read More

  2. Texas and Pacific Steam Locomotives: Texas Types and Mountains

    Nov 10, 26 10:30 PM

    tp-2104-666.jpg
    Texas & Pacific steam: 70 Lima 2-10-4 Texas types, 600-669, classes I-1 through I-1d, and 10 Mountains, 900-909. No. 610 is at Palestine.

    Read More

  3. Texas and Pacific Diesel Roster (All-Time)

    Nov 10, 26 10:29 PM

    42767812_1995248017433792_890057054981455872_n.jpg
    All-time diesel roster of locomotives built for the Texas & Pacific. 246 units: E7s, E8s, 83 F7A and 35 F7B, NW2s, SW7s, SW8s, SW9s, GP7s, GP9s, GP18s, and GP35s. Serials and order numbers.

    Read More

  4. Santa Fe-Southern Pacific Railroad: Merger, History, Paint Scheme

    Nov 10, 26 10:07 PM

    2262007651g1bn12o60202793908.jpg
    The proposed Santa Fe-Southern Pacific merger, from the 1980 attempt and the 1983 holding company through the ICC denial, the Kodachrome paint, and the sale of the Southern Pacific.

    Read More

  5. CSX Santa Train Will Feature Locomotives 250 and 2026

    Nov 10, 26 01:51 PM

    csx-santa-train-250.jpg
    The CSX Santa Train will feature locomotives 250 and 2026 on November 21, 2026. The 84th running covers 110 miles from Shelbiana, Kentucky, to Kingsport, Tennessee.

    Read More

  6. Denton County Asks to Extend Stadler Car Relief

    Nov 10, 26 01:05 PM

    Denton County Transit Authority has asked the FRA to extend a waiver for its Stadler diesel multiple-unit cars. Comments run to January 11, 2027.

    Read More

  7. FreightCar America Reports Third-Quarter Results

    Nov 10, 26 01:02 PM

    freightcaramerica-ballastcar.jpg
    FreightCar America reported third-quarter revenue of $76.5 million and 662 railcar deliveries. Backlog stood at 2,660 cars valued at $284.5 million.

    Read More

  8. Amtrak Has Filed a Train Control Amendment

    Nov 10, 26 12:53 PM

    ethanallen-100-ny-dk.jpg
    Amtrak asked the FRA on October 26, 2026, to amend the safety plan for its Interoperable Electronic Train Management System. Comments are due November 30, 2026.

    Read More

  9. SunRail Signal Waiver Is Open for Comment

    Nov 10, 26 12:25 PM

    sunrail-107-sanford.jpg
    FRA has asked for comment on a petition to extend signal-testing relief on the Central Florida Rail Corridor. The notice names both the corridor and CSXT. Comments run to January 11, 2027.

    Read More

  10. Cars and Units Rose With BNSF Third-Quarter Earnings

    Nov 10, 26 12:18 PM

    bnsf-fullerton-2017-dk.jpg
    Berkshire Hathaway reports that after-tax BNSF earnings increased 19.3 percent in the third quarter of 2026, with car and unit volumes up 3.9 percent.

    Read More

  11. Amtrak Chicago Platforms Are Moving Toward Level Boarding

    Nov 10, 26 12:13 PM

    amtrak-cus-815.jpg
    Amtrak says construction is underway soon on the first level boarding platforms at Chicago Union Station, a 112 million dollar, 30-month project.

    Read More

  12. Maryland Has New Penn Line Times on November 16

    Nov 10, 26 12:07 PM

    marc-trn33-gaithersburgmd.jpg
    MARC Penn Line schedules change on November 16, 2026, after Amtrak trains return to regular schedules. Weekend southbound trains are unchanged.

    Read More

  13. Building Contract for Metrolink Sidings Goes to Granite

    Nov 10, 26 12:00 PM

    metro-850-sanclement.jpg
    Granite says Metrolink awarded a 51.5 million dollar SCORE contract for sidings near downtown Los Angeles and in Rancho Cucamonga.

    Read More

  14. EMD "F2" Locomotives: Specs, Roster, History

    Nov 10, 26 12:22 AM

    385273582375282934823583429866.jpg
    EMD F2, the 1,350-horsepower bridge between the FT and the F3. 104 locomotives, July through November 1946. Spotting features, specifications, and the production roster.

    Read More

  15. Southern Pacific Diesel Roster (All-Time)

    Nov 10, 26 12:08 AM

    sp-ml4000-9013.jpg
    Southern Pacific diesel roster with builder serials, order numbers, Texas and New Orleans numbers, and the 1965 renumbering. Alco, Baldwin, Fairbanks-Morse, Electro-Motive, General Electric, Krauss-Ma…

    Read More

  16. Southern Pacific Steam Roster: Post 1900

    Nov 09, 26 11:56 PM

    34692934982375275782689304973908.jpg
    Southern Pacific steam locomotives built since 1900. Pacific Lines, Texas and Louisiana Lines, cab-forwards, the GS 4-8-4s, and five narrow-gauge Ten-Wheelers. The quantity column counts the rows as p…

    Read More

  17. Canal Street Yard Assessment Stays Open Through December 7

    Nov 09, 26 01:07 PM

    The FRA signed the Canal Street Yard environmental assessment on November 6, 2026. Public inspection runs through December 7, and meeting dates are not confirmed.

    Read More

  18. NS Legacy Cab-Signal Comments Are Due November 9

    Nov 09, 26 01:05 PM

    ns-3395-sayre.jpg
    The FRA must receive comments by November 9, 2026, on a Norfolk Southern plan to drop legacy cab signals on 14 line segments and rely on positive train control.

    Read More

  19. Elimination Grant of $27.8 Million Reaches Scott Road in Allen County

    Nov 09, 26 12:53 PM

    Allen County received $27,878,116, also stated as $27.8 million, to design and build a grade separation where Scott Road crosses Norfolk Southern.

    Read More

  20. Vermont Receives $60.3 Million for the Western Corridor

    Nov 09, 26 12:45 PM

    vmt-431-dk.jpg
    Vermont will receive $60.3 million to rehabilitate about 60 miles of the Western Corridor. The delegation quote also calls the sum $60 million.

    Read More

  21. Burlingame Grade Separation Wins a Federal Grant

    Nov 09, 26 10:42 AM

    broadway-grade-burlingame.png
    Rep. Kevin Mullin said on November 5, 2026 that the FRA awarded $90.4 million for the Caltrain Broadway grade separation in Burlingame. Early work is expected in May 2027.

    Read More

  22. Orange County Rail Line Gets a Coastal Permit

    Nov 09, 26 10:18 AM

    The California Coastal Commission on November 5, 2026 approved a 10-year permit for the San Clemente rail line, including about 690,000 cubic yards of sand.

    Read More

  23. Railroad Quiet Zones Are Reinstated in St. Louis

    Nov 09, 26 10:14 AM

    trra-2004-2012.jpg
    St. Louis said on November 6, 2026 that the FRA reinstated the city quiet zones. Horns are to stop after railroad systems are updated.

    Read More

  24. Southern Pacific Railroad: Map, History, Logo

    Nov 08, 26 01:58 PM

    7902976511n10780918y1939078.jpg
    The Southern Pacific, from the December 2, 1865 charter and the Big Four to Sprint, the Rio Grande Industries purchase of 1988, and the Union Pacific merger of February 1, 1997.

    Read More

  25. California Awards Flexible Rail Aid to Nine Projects

    Nov 08, 26 01:15 PM

    metro-880-600.jpg
    CalSTA on November 5, 2026 awarded $66.58 million in flexible State Rail Assistance to nine California projects. Each amount in the summary is a cap, printed as up to.

    Read More

  26. CSX Leaves Three Days Out of the Weekly Reports

    Nov 08, 26 12:02 PM

    csx-berea-2022.jpg
    CSX told the Surface Transportation Board it cannot recover October 27-29 data for the EP 724 and EP 787 reports covering the week ending October 30, 2026.

    Read More

  27. NJ Transit Advances Three Station Housing Projects

    Nov 08, 26 11:56 AM

    njt-4016.jpg
    NJ Transit on November 5, 2026 advanced station projects in Jersey City, Bound Brook, and Morristown. The three are projected to add more than 1,000 homes.

    Read More

  28. River Fox Train Wraps a Locomotive for America 250

    Nov 08, 26 11:06 AM

    riverfox-2658.jpg
    The River Fox Train in West Sacramento wrapped a locomotive with America 250 markings, the American flag, and the Sacramento skyline. The wrap is expected to stay through 2027.

    Read More

  29. California Keeps Metrolink Service in the 2027 Budget

    Nov 07, 26 11:35 PM

    metro-886-wm.png
    Metrolink says a California State Transportation Agency grant lets the proposed fiscal year 2027 budget keep service at current levels. The board hearing is November 13, 2026.

    Read More

  30. WM's 4-6-6-4 Locomotives (M-2): Specs, Roster, History

    Nov 07, 26 04:37 PM

    wm-4664-blw-1203.png
    Western Maryland class M-2, twelve Baldwin 4-6-6-4s numbered 1201-1212, built in 1940 and 1941 for Hagerstown-Connellsville fast freight. Roster, specifications, and retirement in 1952-1953.

    Read More

  31. Missouri Pacific Diesel Roster (All-Time)

    Nov 07, 26 04:26 PM

    80012871623622j2h6820937098.jpg
    Missouri Pacific diesel roster with builder serials, order numbers, subsidiary lettering, and renumberings. Alco, Baldwin, Electro-Motive, and General Electric. Texas and Pacific locomotives are on th…

    Read More

  32. Missouri Pacific Steam Roster (Built Since 1900)

    Nov 07, 26 04:21 PM

    mp-484-2113.jpg
    Missouri Pacific steam locomotives built since 1900. Drury quantity column 1,439. Sedalia rebuilds counted once, 1,407 frames. Last steam was 0-6-0 9301 in November 1955.

    Read More

  33. Missouri Pacific Railroad: Map, Locomotives, Logo, History

    Nov 07, 26 04:19 PM

    86920419917263722672869080270909.jpg
    The Missouri Pacific was a large Midwestern that carried a long history of financial difficulty until later years.

    Read More

  34. LIRR Service Changes Start on November 9

    Nov 07, 26 03:15 PM

    New Long Island Rail Road schedules start on every branch on Monday, November 9, 2026. Midday and weekend times change. Rush hour does not. Babylon service returns in stages.

    Read More

  35. Draft EA Reviews Norfolk Southern Track in London, Ohio

    Nov 07, 26 11:35 AM

    ns-easliverpool-2025.jpg
    The Surface Transportation Board environmental office issued a draft assessment on November 6, 2026, for about 0.96 miles of Norfolk Southern track in London, Ohio. Comments are due November 20.

    Read More

  36. Metrolink Lines Will Not Run on Three Routes November 7

    Nov 07, 26 10:53 AM

    metro-865-2011.jpg
    Metrolink will not run the Ventura County, Orange County, or Inland Empire-Orange County lines on November 7 and 8, 2026. The advisory says no substitute transportation will be provided.

    Read More

  37. Hartford Line Adds a Weekday Round Trip on November 16

    Nov 07, 26 10:48 AM

    ctdot-danbury-03.jpg
    Connecticut said the Hartford Line adds a weekday New Haven-Hartford round trip on November 16, starts a morning train in Springfield, and extends weekend stops to Windsor and Windsor Locks.

    Read More

  38. Board Issues a Policy Statement on Rail Preemption

    Nov 07, 26 10:44 AM

    nec-220-2025.jpg
    The Surface Transportation Board placed a policy statement on public inspection for the November 9 Federal Register. It reviews existing preemption precedent and says it makes no binding determination…

    Read More

  39. NJ Transit Restores Lines After the Newark Drawbridge Stop

    Nov 07, 26 10:37 AM

    njt-4019-23.jpg
    NJ Transit said Morris and Essex service between Hackettstown and Dover, and Montclair-Boonton service between Hackettstown and Montclair State University, resumed after the Newark Drawbridge stop.

    Read More

  40. EMD "SD35" Locomotives: Data Sheet, Specs, Roster

    Nov 06, 26 10:35 PM

    720774650013819109490158.jpg
    EMD SD35, 2,500 horsepower, 16-cylinder 567D3A, built June 1964 through January 1966. 360 locomotives. Specifications and the production roster by owner, serial, and order.

    Read More

  41. EMD "SDP35" Locomotives: Data Sheet, Specs, Roster

    Nov 06, 26 10:32 PM

    sal-sdp35-1115.jpg
    EMD SDP35, the steam-generator SD35. 35 locomotives, July 1964 through September 1965. Seaboard Air Line 1100-1119, Atlantic Coast Line 550, Louisville and Nashville 1700-1703, Union Pacific 1400-1409…

    Read More

  42. RJ Corman Will Be Replaced on Part of the Luzerne Lines

    Nov 06, 26 01:34 PM

    rn-tunkhannock-dk.jpg
    A November 6, 2026 notice says Wilkes-Barre Terminal Railway would acquire about 59.65 miles in Luzerne County and replace R.J. Corman as operator on part of the line. The earliest date is November 22…

    Read More

  43. NS Names a Student Hub at the University of Georgia

    Nov 06, 26 12:03 PM

    ns-3631-wc.jpg
    Norfolk Southern said a 100,000 dollar gift named a student-organization hub in Driftmier Engineering Center. The University of Georgia marked the naming on October 26. The space is for 23 clubs.

    Read More

  44. Union Pacific Filed Its Vena Recording Certification

    Nov 06, 26 11:56 AM

    up-9523-np.jpg
    Union Pacific filed a November 5, 2026 verified statement that the confidential label is off the March 17 Vena recording and that parties of record received a copy at 3:30 p.m. Eastern.

    Read More

  45. OmniTRAX Adds Tenants at Its Blue Island Hub

    Nov 06, 26 10:26 AM

    omnitrax-blueisland.jpg
    OmniTRAX has signed new construction-company leases at its 90-acre Blue Island, Illinois, hub and is planning a second phase.

    Read More

  46. Veterans and Active-Duty Members Exceed 16 Percent of Norfolk Southern

    Nov 06, 26 10:14 AM

    ns-9232-dk.jpg
    Norfolk Southern said on November 5, 2026, that more than 3,000 veterans and active-duty service members are more than 16 percent of its workforce. This year grants are $100,000 and $50,000.

    Read More

  47. BNSF: Merger Would Put Half of U.S. Rail Shipments Under One Railroad

    Nov 06, 26 10:00 AM

    bnsf-crawford-2009.jpg
    BNSF chief marketing officer Tom G. Williams told customers on November 3, 2026, that a Union Pacific-Norfolk Southern merger would put about half of U.S. rail shipments under one railroad. Nothing is…

    Read More

  48. Amtrak Opens a Winter Fare Sale

    Nov 06, 26 09:28 AM

    amtrk-pennsylvanian-2021.jpg
    Amtrak opened a Winter Wanderlust sale on November 5, 2026. Book by November 12 for travel from December 1, 2026, through March 14, 2027. Blackout dates apply. Coach and Acela Business only.

    Read More

  49. CN and CPKC Report October Grain Records

    Nov 06, 26 08:50 AM

    cpkc-9375-pimage.png
    CPKC reported October 2026 grain records in Canada and the United States. CN reported 3.54 million metric tonnes across Canada. The releases do not print a combined total.

    Read More

  50. New Brunswick Transload Gets CN Rail Service

    Nov 06, 26 08:49 AM

    cn-newbrunswick-transload.png
    CN said on November 4, 2026, that it has started serving AD Gagnon Transload Services near Grand Falls, New Brunswick. The site is three kilometres from the Trans-Canada Highway and lists room for 106…

    Read More