1. Home
  2.  ›
  3. Fallen Flags
  4.  ›
  5. Duluth, Missabe & Iron Range
  6.  ›
  7. 2-8-8-4 (Class M-3/M-4)

The Mighty 2-8-8-4 "Yellowstones" of the Duluth, Missabe & Iron Range Railway

Published: June 15, 2026

By: Adam Burns

The Duluth, Missabe and Iron Range Railway (DM&IR) operated some of the most powerful steam locomotives ever built in the United States. Its fleet of 18 massive 2-8-8-4 “Yellowstone” articulated steam engines, built by the Baldwin Locomotive Works in 1941 and 1943, represented the pinnacle of steam technology for heavy freight service on the iron ranges of northern Minnesota. These giants hauled enormous trains of iron ore from the mines to the ore docks on Lake Superior, playing a vital role in America’s industrial might—especially during World War II.

The DM&IR’s Yellowstones were not the first of their type—the wheel arrangement originated with the Northern Pacific Railway in the late 1920s—but they were the most powerful and among the heaviest examples ever constructed. They stood alongside Union Pacific’s famous 4-8-8-4 Big Boys as icons of late-era American steam power, yet they excelled in their specific niche: moving dense, heavy ore over relatively short but demanding routes in harsh northern climates.

01882378723523788380790879088.jpgDuluth, Missabe & Iron Range 2-8-8-4 #220 was late in its career when photographed here at the yard in Proctor, Minnesota, on June 19, 1959. Stan Kistler photo.

The DM&IR and the Need for Giants

Subscribe To American Rails!

* indicates required

View previous campaigns

The DM&IR served the Mesabi and Vermilion iron ranges. Its primary mission was transporting millions of tons of iron ore annually from open-pit mines to the massive ore docks at Duluth and Two Harbors, Minnesota. Iron ore is extremely dense, so trains required locomotives with exceptional tractive effort and adhesion rather than high speed.

By the late 1930s, the DM&IR needed more powerful motive power to handle longer, heavier trains efficiently. Earlier locomotives, including Mallet articulated types, were reaching their limits. The railroad turned to Baldwin Locomotive Works for a new design optimized for its traffic.

Baldwin based the new engines on ten 2-8-8-2 articulated locomotives it had built for the Western Pacific Railroad in the 1930s. However, the DM&IR required a larger coal-burning firebox to support sustained high power output and an all-weather cab suitable for Minnesota’s brutal winters. These needs led to the addition of a four-wheel trailing truck, creating the 2-8-8-4 wheel arrangement known as the Yellowstone type.

The resulting locomotives featured a high-capacity “centipede” or pedestal tender and roller bearings on all axles—advanced features for the era. Some carried an Elesco feedwater heater (cylindrical unit ahead of the stack), while others had a Worthington unit with its characteristic rectangular box.

Construction and Classes

Baldwin delivered the first eight locomotives (Class M-3, road numbers 220–227) in 1941. They performed so well that the DM&IR ordered ten more (Class M-4, road numbers 228–237) for delivery in 1943. The War Production Board approved the second order despite wartime restrictions on new steam locomotive construction.

The two classes were very similar, with minor variations in feedwater heater equipment and possibly other details. All 18 shared the same core dimensions and performance characteristics. They were among the largest steam locomotives built, rivaling the Big Boys in size and power.

Detailed Technical Specifications

Here are the key specifications for the DM&IR Class M-3 and M-4 2-8-8-4 Yellowstones:

Specification Value
Wheel Arrangement (Whyte)2-8-8-4
UIC Classification(1′D)D2′
Gauge4 ft 8½ in (1,435 mm) standard gauge
Driver Diameter63 in (1,600 mm)
Wheelbase (locomotive)113 ft 6.7 in (34.76 m)
Axle Load70,032 lb (31,766 kg)
Adhesive Weight560,257 lb (254,128 kg)
Locomotive Weight (empty of tender)695,040 lb (315,260 kg)
Tender Weight438,000 lb (199,000 kg)
Total Weight (loco + tender)1,133,040 lb (513,940 kg)
Fuel TypeCoal
Fuel Capacity26 short tons (24 t)
Water Capacity25,000 US gal (95 m³)
Grate Area125 sq ft (11.6 m²)
Boiler Diameter108 in (2,743 mm)
Boiler Pressure240 psi (1.7 MPa)
CylindersFour, 26 in × 32 in (660 mm × 813 mm)
Tractive Effort140,093 lbf (623.16 kN)
Factor of Adhesion4.00
Maximum Speed (with ore trains)45 mph (72 km/h)
Power OutputApprox. 6,250 hp (4,660 kW) at ~40 mph
BuilderBaldwin Locomotive Works
Build Years1941 (M-3: 8 units); 1943 (M-4: 10 units)
Road Numbers220–237

These figures made the Missabe's Yellowstones exceptionally strong pullers. Their high adhesive weight and factor of adhesion of 4.00 meant they were less prone to wheel slip than many contemporaries when starting heavy trains. Their tractive effort exceeded that of the Union Pacific Big Boys (approximately 135,375 lbf), though the Big Boys were slightly heavier overall and had a different wheel arrangement optimized for different service.

Performance and Operational Service

In service, the Yellowstones hauled long strings of ore cars—often 100+ cars loaded or empty—between the iron ranges and the Lake Superior docks. The route included challenging grades; pulling empty cars back up the steep inclines from Duluth (reportedly among the steepest regularly used mainline grades in the U.S. at the time) tested their power to the limit. Their ability to handle heavy loads reliably was crucial.

During World War II, several M-4 locomotives were leased to the Denver & Rio Grande Western Railroad (D&RGW) for helper service over Tennessee Pass and other freight duties. The D&RGW reportedly praised them highly as “the finest engines ever to operate there,” though one unit (No. 224) suffered a wreck due to air-brake issues and was returned.

The locomotives featured large cabs for crew comfort in cold weather and high-capacity tenders that reduced the need for frequent refueling and watering on ore runs.

Retirement and the End of an Era

Dieselization came relatively late to the DM&IR compared to many railroads. Most Yellowstones remained in service into the late 1950s and early 1960s. Only one locomotive (No. 237) was retired early after a wreck; it was sold for scrap. The remainder were retired between 1958 and 1963 as diesel locomotives took over all mainline duties. The last operating Yellowstone reportedly pulled its final ore train in 1960.

Additional Reading

The following comes from Robert Le Massena regarding these big engines:

"The Duluth, Missabe & Iron Range Railway is a most unusual carrier in several ways, one of them being that the only new steam motive power it ever purchased was a fleet of enormous 2-8-8-4’s. Only three other railroads (Baltimore & Ohio, Northern Pacific, Southern Pacific) owned locomotives of that wheel arrangement, and only those of the NP were larger and heavier.

There were 18 of them on the DM&IR, numbered 220-237. One of the DM&IR’s claims to fame; it was one of the last Class I railroads in the country to use steam power for regular freight operations. One movement was not completely dieselized until 1961, and a couple of the 2-8-8-4’s stayed alive in excursion service thru 1962.

The DM&IR Railway was formed in 1938 when the Duluth, Missabe & Northern and the Duluth & Iron Range Railroads combined their corporate entities into a single organization. The new company inherited the locomotives of its two components, none of which were of recent design. The D&IR Railroad’s latest engines were three Baldwin 2-8-2’s built in 1923, and nothing on the DM&IR Railroad’s roster was newer than ten ALCO 2-10-2’s built in 1919, except four 0-10-0 Baldwin switchers erected in 1928.

Four of the DM&IR’s twelve big 2-8-8-4’s, built by Baldwin between 1910 and 1917, had been converted from compound to single-expansion between 1929 and 1931, and the 2-10-2’s had been improved by rebuilding, but neither could be considered as modern motive power. Nevertheless, the two railroads had managed to handle immense tonnages of iron ore, hauling it from mines in the Vermilion and Mesabi Ranges to the Lake Superior ports of Two Harbors and Duluth, Minnesota, over distances ranging from 75 to 125 miles.

World War II was already well under way when the DM&IR was formed, and it soon became evident that its motive power, no matter how improved or maintained, was incapable of handling the additional traffic soon to be required by the nation’s steel mills, particularly those of the U.S. Steel Company which owned the DM&IR. The railroad was a crucial link in the transport of iron ore, which moved by ships on Lakes Superior, Michigan, Huron and Erie directly to lake-side blast furnaces near Chicago, Illinois, or to reload facilities of the Bessemer & Lake Erie Railroad (also owned by U.S. Steel) for forwarding to the mills in the Pittsburgh, Pennsylvania, region.

What the DM&IR needed was a locomotive which could effectively double the tonnage of iron ore moving over the line from mine to dock. By collaborating closely with the railroad’s operating people, Baldwin’s designers produced a remarkably satisfactory locomotive. A great many items were considered, among them one-piece machinery bed (also known as an engine and tender bed), forced-feed lubrication and even the tender capacity.

Since steam generating ability was a basic factor, the boiler was provided with a firebox having a grate area of 125 square feet, and the steam pressure was set at 240 psi. Four 26 × 32-inch cylinders and 63-inch diameter driving wheels produced a tractive effort of 140,000 pounds. (The machinery dimensions were identical with those of the NP railroad’s 2-8-8-4’s, but the latter had 250-psi boiler pressure.) The engine alone weighed 695,000 pounds, just 18,000 pounds less than the NP monster.

The tender rode on a 4-10 bed and weighed 515,000 pounds fully loaded. Its water capacity of 25,000 gallons was adequate for a trip of about 200 miles with 10,000 tons of iron ore.The first eight locomotives (class M3, Nos. 220-227) were delivered in early 1941, and they bore construction numbers 62526-62533. They were amazingly successful, and were placed in pooled service after only three trips with supervised operation.

They steamed well and exceeded the estimates for fuel consumption. In the fall of that year, when DM&IR began to curtail operations because the lakes were starting to freeze over, most of the 2-8-8-4’s were leased to the Denver & Rio Grande Western Railroad, whose surge of war-generated traffic had created an acute shortage of heavy motive power. After the lakes had begun to thaw the following spring, the locomotives were returned to the DM&IR for their customary service, hauling 10,000-ton trains of iron ore. On occasion they were able to handle even heavier loads. In 1943 the other ten 2-8-8-4’s (class M4, Nos. 228-237) were added to help with the still mounting tonnages."

Surviving Examples

Of the 18 locomotives built, three survive today—all preserved in Minnesota, close to where they worked. They represent a remarkable legacy of these engineering marvels.

Here is a summary of the surviving DM&IR 2-8-8-4s:

Road Number Class Build Year Location Status Notes
225 M-3 1941 Proctor, Minnesota (Charles E. Carlson Park / DM&IR yard area) Static display (outdoors) Has lost some boiler sheathing; exposed to elements
227 M-3 1941 Duluth, Minnesota (Lake Superior Railroad Museum) Static display (indoor) Well-preserved; excellent condition for public viewing
229 M-4 1943 Two Harbors, Minnesota (Waterfront Park / under cover) Static display (under shelter) Recently cosmetically restored; good condition

These three survivors allow railfans and historians to appreciate the sheer scale and complexity of these articulated giants. No. 227, in particular, benefits from indoor protection at the museum.

dmir-224-2884.jpgNearing retirement, Duluth, Missabe & Iron Range 2-8-8-4 #224 (Class M-3) leads an excursion at Biwabik, Minnesota on July 2, 1961. Photographer unknown.

Legacy

The Missabe's Yellowstones were the last major class of large steam locomotives built for heavy ore service in the Upper Midwest. They combined raw power, innovative features for their time (roller bearings, large tenders, all-weather cabs), and proven reliability in demanding conditions. While only three remain, they stand as tangible reminders of an era when steam ruled the rails and iron from Minnesota helped win a world war.  Today, visitors to northern Minnesota can still stand beside these behemoths and imagine the thunder of 140,000 pounds of tractive effort moving mile-long ore trains through the Iron Range. They remain among the most impressive steam locomotives ever to turn a wheel in North America.

Recent Articles

  1. Southern Pacific Railroad: Map, History, Logo

    Nov 08, 26 01:58 PM

    7902976511n10780918y1939078.jpg
    The Southern Pacific, from the December 2, 1865 charter and the Big Four to Sprint, the Rio Grande Industries purchase of 1988, and the Union Pacific merger of February 1, 1997.

    Read More

  2. California Awards Flexible Rail Aid to Nine Projects

    Nov 08, 26 01:15 PM

    metro-880-600.jpg
    CalSTA on November 5, 2026 awarded $66.58 million in flexible State Rail Assistance to nine California projects. Each amount in the summary is a cap, printed as up to.

    Read More

  3. CSX Leaves Three Days Out of the Weekly Reports

    Nov 08, 26 12:02 PM

    csx-berea-2022.jpg
    CSX told the Surface Transportation Board it cannot recover October 27-29 data for the EP 724 and EP 787 reports covering the week ending October 30, 2026.

    Read More

  4. NJ Transit Advances Three Station Housing Projects

    Nov 08, 26 11:56 AM

    njt-4016.jpg
    NJ Transit on November 5, 2026 advanced station projects in Jersey City, Bound Brook, and Morristown. The three are projected to add more than 1,000 homes.

    Read More

  5. River Fox Train Wraps a Locomotive for America 250

    Nov 08, 26 11:06 AM

    riverfox-2658.jpg
    The River Fox Train in West Sacramento wrapped a locomotive with America 250 markings, the American flag, and the Sacramento skyline. The wrap is expected to stay through 2027.

    Read More

  6. California Keeps Metrolink Service in the 2027 Budget

    Nov 07, 26 11:35 PM

    metro-886-wm.png
    Metrolink says a California State Transportation Agency grant lets the proposed fiscal year 2027 budget keep service at current levels. The board hearing is November 13, 2026.

    Read More

  7. WM's 4-6-6-4 Locomotives (M-2): Specs, Roster, History

    Nov 07, 26 04:37 PM

    wm-4664-blw-1203.png
    Western Maryland class M-2, twelve Baldwin 4-6-6-4s numbered 1201-1212, built in 1940 and 1941 for Hagerstown-Connellsville fast freight. Roster, specifications, and retirement in 1952-1953.

    Read More

  8. Missouri Pacific Diesel Roster (All-Time)

    Nov 07, 26 04:26 PM

    80012871623622j2h6820937098.jpg
    Missouri Pacific diesel roster with builder serials, order numbers, subsidiary lettering, and renumberings. Alco, Baldwin, Electro-Motive, and General Electric. Texas and Pacific locomotives are on th…

    Read More

  9. Missouri Pacific Steam Roster (Built Since 1900)

    Nov 07, 26 04:21 PM

    mp-484-2113.jpg
    Missouri Pacific steam locomotives built since 1900. Drury quantity column 1,439. Sedalia rebuilds counted once, 1,407 frames. Last steam was 0-6-0 9301 in November 1955.

    Read More

  10. Missouri Pacific Railroad: Map, Locomotives, Logo, History

    Nov 07, 26 04:19 PM

    86920419917263722672869080270909.jpg
    The Missouri Pacific was a large Midwestern that carried a long history of financial difficulty until later years.

    Read More

  11. LIRR Service Changes Start on November 9

    Nov 07, 26 03:15 PM

    New Long Island Rail Road schedules start on every branch on Monday, November 9, 2026. Midday and weekend times change. Rush hour does not. Babylon service returns in stages.

    Read More

  12. Draft EA Reviews Norfolk Southern Track in London, Ohio

    Nov 07, 26 11:35 AM

    ns-easliverpool-2025.jpg
    The Surface Transportation Board environmental office issued a draft assessment on November 6, 2026, for about 0.96 miles of Norfolk Southern track in London, Ohio. Comments are due November 20.

    Read More

  13. Metrolink Lines Will Not Run on Three Routes November 7

    Nov 07, 26 10:53 AM

    metro-865-2011.jpg
    Metrolink will not run the Ventura County, Orange County, or Inland Empire-Orange County lines on November 7 and 8, 2026. The advisory says no substitute transportation will be provided.

    Read More

  14. Hartford Line Adds a Weekday Round Trip on November 16

    Nov 07, 26 10:48 AM

    ctdot-danbury-03.jpg
    Connecticut said the Hartford Line adds a weekday New Haven-Hartford round trip on November 16, starts a morning train in Springfield, and extends weekend stops to Windsor and Windsor Locks.

    Read More

  15. Board Issues a Policy Statement on Rail Preemption

    Nov 07, 26 10:44 AM

    nec-220-2025.jpg
    The Surface Transportation Board placed a policy statement on public inspection for the November 9 Federal Register. It reviews existing preemption precedent and says it makes no binding determination…

    Read More

  16. NJ Transit Restores Lines After the Newark Drawbridge Stop

    Nov 07, 26 10:37 AM

    njt-4019-23.jpg
    NJ Transit said Morris and Essex service between Hackettstown and Dover, and Montclair-Boonton service between Hackettstown and Montclair State University, resumed after the Newark Drawbridge stop.

    Read More

  17. EMD "SD35" Locomotives: Data Sheet, Specs, Roster

    Nov 06, 26 10:35 PM

    720774650013819109490158.jpg
    EMD SD35, 2,500 horsepower, 16-cylinder 567D3A, built June 1964 through January 1966. 360 locomotives. Specifications and the production roster by owner, serial, and order.

    Read More

  18. EMD "SDP35" Locomotives: Data Sheet, Specs, Roster

    Nov 06, 26 10:32 PM

    sal-sdp35-1115.jpg
    EMD SDP35, the steam-generator SD35. 35 locomotives, July 1964 through September 1965. Seaboard Air Line 1100-1119, Atlantic Coast Line 550, Louisville and Nashville 1700-1703, Union Pacific 1400-1409…

    Read More

  19. RJ Corman Will Be Replaced on Part of the Luzerne Lines

    Nov 06, 26 01:34 PM

    rn-tunkhannock-dk.jpg
    A November 6, 2026 notice says Wilkes-Barre Terminal Railway would acquire about 59.65 miles in Luzerne County and replace R.J. Corman as operator on part of the line. The earliest date is November 22…

    Read More

  20. NS Names a Student Hub at the University of Georgia

    Nov 06, 26 12:03 PM

    ns-3631-wc.jpg
    Norfolk Southern said a 100,000 dollar gift named a student-organization hub in Driftmier Engineering Center. The University of Georgia marked the naming on October 26. The space is for 23 clubs.

    Read More

  21. Union Pacific Filed Its Vena Recording Certification

    Nov 06, 26 11:56 AM

    up-9523-np.jpg
    Union Pacific filed a November 5, 2026 verified statement that the confidential label is off the March 17 Vena recording and that parties of record received a copy at 3:30 p.m. Eastern.

    Read More

  22. OmniTRAX Adds Tenants at Its Blue Island Hub

    Nov 06, 26 10:26 AM

    omnitrax-blueisland.jpg
    OmniTRAX has signed new construction-company leases at its 90-acre Blue Island, Illinois, hub and is planning a second phase.

    Read More

  23. Veterans and Active-Duty Members Exceed 16 Percent of Norfolk Southern

    Nov 06, 26 10:14 AM

    ns-9232-dk.jpg
    Norfolk Southern said on November 5, 2026, that more than 3,000 veterans and active-duty service members are more than 16 percent of its workforce. This year grants are $100,000 and $50,000.

    Read More

  24. BNSF: Merger Would Put Half of U.S. Rail Shipments Under One Railroad

    Nov 06, 26 10:00 AM

    bnsf-crawford-2009.jpg
    BNSF chief marketing officer Tom G. Williams told customers on November 3, 2026, that a Union Pacific-Norfolk Southern merger would put about half of U.S. rail shipments under one railroad. Nothing is…

    Read More

  25. Amtrak Opens a Winter Fare Sale

    Nov 06, 26 09:28 AM

    amtrk-pennsylvanian-2021.jpg
    Amtrak opened a Winter Wanderlust sale on November 5, 2026. Book by November 12 for travel from December 1, 2026, through March 14, 2027. Blackout dates apply. Coach and Acela Business only.

    Read More

  26. CN and CPKC Report October Grain Records

    Nov 06, 26 08:50 AM

    cpkc-9375-pimage.png
    CPKC reported October 2026 grain records in Canada and the United States. CN reported 3.54 million metric tonnes across Canada. The releases do not print a combined total.

    Read More

  27. New Brunswick Transload Gets CN Rail Service

    Nov 06, 26 08:49 AM

    cn-newbrunswick-transload.png
    CN said on November 4, 2026, that it has started serving AD Gagnon Transload Services near Grand Falls, New Brunswick. The site is three kilometres from the Trans-Canada Highway and lists room for 106…

    Read More

  28. Together, Freight and Passenger Rail Can Grow, Union Pacific Says

    Nov 06, 26 08:47 AM

    up-joyce-1996.jpg
    Union Pacific said on November 5, 2026, that passenger obligations would remain if it combines with Norfolk Southern. The capacity claim is a Union Pacific analysis, not a Surface Transportation Board…

    Read More

  29. FM "C-Liner" Locomotives: Specs, Roster, Photos

    Nov 05, 26 11:19 PM

    milw-28c-cfa164-rb.jpg
    Fairbanks-Morse Consolidation Line cab units, the C-Liners. 165 locomotives, Beloit and Kingston, March 1950 through February 1955. Models, specs, and production rosters.

    Read More

  30. Atlanta, Birmingham & Coast Railroad: Map, History, Roster

    Nov 05, 26 12:03 PM

    abc-282-213.jpg
    Atlanta, Birmingham & Coast, from Brunswick and Waycross to Atlanta and Birmingham. Atlantic Coast Line control at the close of 1926. Merged in January 1946 as the Western Division. Steam roster of th…

    Read More

  31. El Paso & Southwestern Railroad: Map, History, Logo

    Nov 05, 26 12:00 PM

    2777916859030886.jpg
    The El Paso & Southwestern, the Phelps Dodge copper railroad from Tucson to the Rock Island at Tucumcari. Southern Pacific control on October 31, 1924.

    Read More

  32. Brightline Says Orlando Service Has Resumed

    Nov 05, 26 11:55 AM

    brightline-wpb-publicity.jpg
    Brightline said on November 5, 2026, that trains to and from Orlando have resumed after weather suspensions in Brevard County. Later that morning the departures page still showed the Orlando segment s…

    Read More

  33. Metra Customers Must Sign Up Again

    Nov 05, 26 11:43 AM

    metra-406-dk.jpg
    Metra says customers who want service alerts must sign up again at metratracker.com. The November 2 story says the new system has launched and the old email list is shut down. A notice on the same pag…

    Read More

  34. Norfolk Southern Packs Six Projects Into One Window

    Nov 05, 26 11:38 AM

    english-tunnel-ns-project.jpg
    Norfolk Southern used one 26-hour window on the W Line for six projects in Indiana and Kentucky, including three bridge replacements. The October 27 account does not give the calendar day of the work.

    Read More

  35. CSX: More Time to Comment on an Inspection Waiver

    Nov 05, 26 11:29 AM

    csx-alvada-2012.jpg
    The Federal Railroad Administration extended comments on a CSX petition for relief from some qualified mechanical inspector rules until December 2, 2026. The November 2 notice does not grant the waive…

    Read More

  36. Brightline Expects Orlando Service on Thursday

    Nov 05, 26 09:21 AM

    bright-deerf-dk.jpg
    Brightline said on November 4, 2026, that it expects trains to and from Orlando to resume on Thursday, November 5. South Florida stations kept running. The departures page still showed the Orlando seg…

    Read More

  37. Union Pacific: More Time to Comment on an Inspection Waiver

    Nov 05, 26 09:15 AM

    up-5295-gila-dk.jpg
    The Federal Railroad Administration extended comments on a Union Pacific petition for relief from some qualified mechanical inspector rules until December 2, 2026. The November 2 notice does not grant…

    Read More

  38. Wisconsin Opens Comments on the 2027 Freight Plan

    Nov 05, 26 09:03 AM

    wisc-lima-2010.jpg
    WisDOT opened the draft 2027 State Freight Plan for comment through December 1, 2026. The plan covers freight rail with highways, harbors, aviation, and intermodal links. Completion is expected in sum…

    Read More

  39. U.S. Rail Traffic Rose 3.5 Percent in the Week Ending October 31

    Nov 05, 26 08:52 AM

    housatonic-155-2026-dk.jpg
    U.S. railroads moved 514,080 carloads and intermodal units in the week ending October 31, 2026, up 3.5 percent from a year earlier, the Association of American Railroads said on November 4.

    Read More

  40. Muni and Bay Area Transit Measures Pass

    Nov 05, 26 08:49 AM

    muni-1006-dj.jpg
    San Francisco Municipal Transportation Agency said on November 4, 2026 that Proposition H and a regional transit measure passed. Proposition H is about 160 million dollars a year for Muni. The regiona…

    Read More

  41. Ground Rules Set for Responsive Applications

    Nov 05, 26 08:47 AM

    ns-8383-altoona-04.jpg
    Decision No. 46, served November 4, 2026, denies a request to add Walsenburg to the Union Pacific interchange list and sets what CPKC and CN must include in responsive applications. Four CPKC proposal…

    Read More

  42. Video of the Vena Address Must Be Released

    Nov 05, 26 08:42 AM

    up-5316.jpg
    The Surface Transportation Board on November 4, 2026 denied the Union Pacific appeal and ordered the March 17 shipper-conference recording released to the parties by 5:00 p.m. Eastern on November 5. C…

    Read More

  43. Chicago & North Western Iron Ore C628s

    Nov 04, 26 11:47 PM

    cnw-c628-gooselake-charliehill.jpg
    Chicago and North Western C628s 6701-6730, the ex-Norfolk and Western high-hoods, in Upper Peninsula iron-ore service from the mid-1970s until December 21, 1986, and what happened to each unit.

    Read More

  44. Warrenton Railroad: Serving Warrenton, NC (1884-1985)

    Nov 04, 26 10:33 PM

    warrenton-nc-1985.jpg
    The three-mile Warrenton Railroad, from Warren Plains to the North Carolina county seat. Chartered January 28, 1871. First train November 8, 1884. Closed in 1985.

    Read More

  45. Rio Grande Steam Locomotives (Since 1900)

    Nov 04, 26 11:40 AM

    2692039486562561732j2h07978.jpg
    Denver & Rio Grande Western steam locomotives built since 1900. Standard gauge quantity 435 and narrow gauge 48. Challengers, 2-8-8-2s, Mountains, Northerns, and the K-27, K-28, K-36, and K-37.

    Read More

  46. Rio Grande Diesel Locomotives (All-Time)

    Nov 04, 26 11:39 AM

    590019237125351261y6179286007.jpg
    Denver & Rio Grande Western diesel locomotives, each frame once. 554 units, from the 1941 NW2 through the 1990 GP60s. FT, F3, F7, and F9 sets are not counted again under their 1950 numbers.

    Read More

  47. Rio Grande Railroad: Map, Logo, History, Rosters

    Nov 04, 26 11:34 AM

    drgw-f3s-soldiersummit.jpg
    Denver & Rio Grande Western history, from William Jackson Palmer and the October 27, 1870 charter through the Royal Gorge, the Moffat route, the California Zephyr, and Union Pacific common control…

    Read More

  48. Lindblom Gift Expands the Fort Wayne Restoration Shop

    Nov 04, 26 11:14 AM

    nkp-765-fort-wayne-shops.jpg
    Art Lindblom gave the Fort Wayne Railroad Historical Society more than $1.4 million, its largest single gift, to expand the New Haven shop. The addition is planned for late 2026 and early 2027. A sepa…

    Read More

  49. Design Contract Awarded for the Forest Park Branch

    Nov 04, 26 11:09 AM

    forest-park-rebuild.jpg
    The Chicago Transit Board approved a design contract for about 13 miles of Blue Line track from the Illinois Medical District to the I-290 Bridge. The release summary calls it a $17 million contract…

    Read More

  50. Kanawha River Railroad: The Norfolk Southern Lease Is Renewed

    Nov 04, 26 10:51 AM

    knwa-4213.jpg
    Kanawha River Railroad filed to keep leasing 309.45 miles from Norfolk Southern in West Virginia and Ohio. The second amendment is dated August 17, 2026. The Board has not set the date the exemption t…

    Read More