1. Home
  2. ›
  3. Fallen Flags
  4. ›
  5. Norfolk Southern (Original)
  6. ›
  7. Diesel Roster

Original Norfolk Southern Diesel Roster (All-Time)

Published: October 14, 2026

By: Adam Burns

The original Norfolk Southern bought 59 diesel locomotives, all of them new. Baldwin built the first 32: three DS-4-4-660s, two DS-4-4-1000s, ten DRS-6-4-1500s, and seventeen AS-416s. General Electric added three 70-tonners. Electro-Motive closed the roster with seventeen GP18s and seven GP38s. The company story, from the Elizabeth City & Norfolk of 1870 to the Southern Railway merger of January 1, 1974, is the original Norfolk Southern page.

At the end of 1948 the railroad counted 18 diesels and 31 steam locomotives. In 1951 the diesels were ahead, 23 to 21. On January 29, 1954, after AS-416s 1611–1613 arrived, the steam roster was cleared and the diesel count stood at 31. The four later AS-416s, the GP18s, and the GP38s are the locomotives that raised the all-time total to 59.

Roster view of original Norfolk Southern AS-416 No. 1617 at Raleigh about 1965

AS-416 No. 1617 at Raleigh, North Carolina, about 1965. Warren Calloway photograph. Baldwin construction number 76114, completed December 6, 1955.

On this page: At a glance · Switchers · DRS-6-4-1500s · AS-416s · GP18s and GP38s

At a glance

ItemDetail
RailroadOriginal Norfolk Southern. Mark NS. Company original Norfolk Southern
Fleet in these tables59 locomotives, every one bought new
Baldwin switchers3 DS-4-4-660s and 2 DS-4-4-1000s, 1947
GE3 seventy-tonners, June 1948
Baldwin road switchers10 DRS-6-4-1500s, 1947–1948. 17 AS-416s, 1951–1955
Electro-Motive17 GP18s, 1963. 7 GP38s, 1966–1967
To the SouthernGP18s became 180–196. GP38s became 2880–2886. Both groups received high short hoods

Switchers

The first diesels were Baldwin yard switchers. DS-4-4-660s 661 and 662 were completed in January 1947, and 663 on May 5, 1947. Construction numbers 73363 and 73364, between 662 and 663, were Wabash locomotives. The two DS-4-4-1000s followed on January 21 and 22, 1947. The DS-4-4-660 is a 660-horsepower B-B switcher, 48 feet between coupler pulling faces. The DS-4-4-1000 is the 1,000-horsepower companion. Three GE 70-tonners, 701–703, builder numbers 30013–30015, were completed in June 1948. Those five Baldwin switchers, the three 70-tonners, and the ten DRS-6-4-1500s are the 18 diesels counted at the end of 1948.

No. 702 was sold to the Montpelier & Barre in June 1967 and became No. 30. Nos. 701 and 703 passed to the Southern with the 1974 merger. No. 701 was renumbered Southern 70, sold to Naporano Iron & Metal in May 1978, and became LRS 110 in June 1979. No. 703 kept its number on the Southern, moved the same month to Naporano and then to Lake Ontario Steel, and later ran on the South Simcoe Railway in Ontario. The Baldwin switchers were retired in the 1960s.

ModelNumbersQtySerialOrderBuiltNotes
DS-4-4-660661173361—January 3, 1947Retired in the 1960s
DS-4-4-660662173362—January 30, 1947Retired in the 1960s
DS-4-4-660663173365—May 5, 1947Retired in the 1960s. Construction numbers 73363–73364 were Wabash locomotives
DS-4-4-10001001172832—January 21, 1947Retired in the 1960s
DS-4-4-10001002172833—January 22, 1947Retired in the 1960s
70-ton701130013—June 1948To the Southern as 70. Naporano Iron & Metal, May 1978. LRS 110, June 1979
70-ton702130014—June 1948Sold June 1967 to the Montpelier & Barre as 30
70-ton703130015—June 1948To the Southern as 703. Naporano and Lake Ontario Steel, May 1978. Later South Simcoe

DRS-6-4-1500s

The DRS-6-4-1500 is a 1,500-horsepower road switcher on A1A-A1A trucks, with Baldwin’s 608SC engine. Norfolk Southern 1501–1510 were completed between October 7, 1947, and March 31, 1948. They were retired in the 1960s. No. 1504 later ran as Durham & Southern 363.

ModelNumbersQtySerialOrderBuiltNotes
DRS-6-4-15001501173487—October 7, 1947Retired in the 1960s
DRS-6-4-15001502173488—February 7, 1948Retired in the 1960s
DRS-6-4-15001503–1504273489–73490—February 20, 19481504 later Durham & Southern 363
DRS-6-4-15001505–1506273491–73492—February 28, 1948Retired in the 1960s
DRS-6-4-15001507–1508273493–73494—March 13, 1948Retired in the 1960s
DRS-6-4-15001509–1510273495–73496—March 31, 1948Retired in the 1960s

AS-416s

The AS-416 replaced the DRS-6-4-1500 in Baldwin’s catalog. Norfolk Southern owned 17 of the 25 built. They are Baldwin class DRS-6-4-1600/1 SC: 1,600 horsepower, A1A-A1A, 58 feet between coupler pulling faces, with a De La Vergne 608A engine and Westinghouse electrical equipment. Nos. 1601–1605, completed in May, June, and July 1951, brought the diesel roster to 23. Nos. 1611–1613, completed in January 1954, were the three locomotives on hand when the steam roster was retired on January 29. No. 1604 was finished on July 14, 1951, and No. 1603 on July 19.

Nos. 1601–1605 were retired in the mid-1960s. Nos. 1606–1617 stayed in service through the Southern merger. No. 1616, construction number 76112, was sold after the merger. It was on Precision National’s roster by May 21, 1974, then went to Peabody Coal, still numbered 1616, and it is now at the North Carolina Transportation Museum in Spencer. Construction number 76113 sits between 76112 and 76114. Both 1616 and 1617 were completed on December 6, 1955.

ModelNumbersQtySerialOrderBuiltNotes
AS-4161601175237—May 29, 1951Retired in the mid-1960s
AS-4161602175238—June 14, 1951Retired in the mid-1960s
AS-4161603175239—July 19, 1951Retired in the mid-1960s. Completed after 1604
AS-4161604175240—July 14, 1951Retired in the mid-1960s
AS-4161605175241—July 20, 1951Retired in the mid-1960s
AS-4161606175699—September 27, 1952Retired with the 1974 merger. The Raleigh terminal photograph
AS-4161607–1608275721–75722—September 30, 1952Retired with the 1974 merger. 1607 is the Glenwood Yard photograph of January 1968
AS-4161609175723—October 9, 1952Retired with the 1974 merger. At the Norfolk roundhouse, November 24, 1968
AS-4161610175724—October 10, 1952Retired with the 1974 merger
AS-4161611175938—January 20, 1954Retired with the 1974 merger. Left Carolina Yard on February 5, 1954, with six retired steam locomotives
AS-4161612175939—January 22, 1954Retired with the 1974 merger
AS-4161613175940—January 26, 1954Retired with the 1974 merger. With 1611 and 1612, the three locomotives received before the steam roster was cleared on January 29, 1954
AS-4161614–1615276037–76038—March 28, 1955Retired with the 1974 merger
AS-4161616176112—December 6, 1955Sold after the merger. Precision National by May 21, 1974, then Peabody Coal 1616. Preserved at the North Carolina Transportation Museum, Spencer
AS-4161617176114—December 6, 1955Retired with the 1974 merger. The roster photograph. Construction number 76113 sits between 76112 and 76114

GP18s and GP38s

The seventeen GP18s are one Electro-Motive order, 5655. Nos. 1–16 are serials 27772–27787, completed in September and October 1963. No. 17 is serial 28353, completed in October 1963. They are 1,800-horsepower B-B road switchers, and they left La Grange with low short hoods. On the Southern they became 180–196, in order, and were rebuilt with high short hoods for long-hood-forward operation. No. 1 became 180 and No. 17 became 196. Southern 181, serial 27773, is the second locomotive of the series.

The seven GP38s were the last locomotives the railroad bought. They are 2,000-horsepower B-B road switchers, also delivered with low short hoods. The Southern rebuilt them the same way and numbered them 2880–2886. Southern 2880 is serial 31782, built in June 1966 as Norfolk Southern 2001.

ModelNumbersQtySerialOrderBuiltNotes
GP181–161627772–277875655September–October 1963Low short hood as built. Southern 180–195, high short hood, long hood forward. No. 4 and No. 5 are the Plymouth and Pinehurst photographs
GP18171283535655October 1963Low short hood as built. Southern 196, high short hood, long hood forward
GP382001–2002231782–317837895June 1966Low short hood as built. Southern 2880–2881, high short hood, long hood forward
GP382003–2004232308–323097925October 1966Low short hood as built. Southern 2882–2883, high short hood, long hood forward
GP382005–2007332491–324937937June–July 1967Low short hood as built. Southern 2884–2886, high short hood, long hood forward

The quantity column totals 59: eight switchers in the first table, ten DRS-6-4-1500s, seventeen AS-416s, and twenty-four Electro-Motive units.

Related reading on American-Rails.com

Sources

  • Baldwin production rosters on this site. DS-4-4-660: Norfolk Southern 661, construction number 73361, January 3, 1947; 662, 73362, January 30, 1947; 663, 73365, May 5, 1947. DS-4-4-1000: 1001, 72832, January 21, 1947; 1002, 72833, January 22, 1947. DRS-6-4-1500: 1501, 73487, October 7, 1947; 1502, 73488, February 7, 1948; 1503–1504, 73489–73490, February 20, 1948; 1505–1506, 73491–73492, February 28, 1948; 1507–1508, 73493–73494, March 13, 1948; 1509–1510, 73495–73496, March 31, 1948. AS-416: the seventeen completion dates in the table above, construction numbers 75237–75241, 75699, 75721–75724, 75938–75940, 76037–76038, 76112, and 76114. Baldwin class for the AS-416 is DRS-6-4-1600/1 SC. Horsepower, wheel arrangement, and length are the figures on the model pages.
  • Electro-Motive production rosters on this site. GP18: Norfolk Southern 1–16, serials 27772–27787, order 5655, September–October 1963; No. 17, serial 28353, order 5655, October 1963. The GP18 compilation records these units as low-hood locomotives. GP38: 2001–2002, serials 31782–31783, order 7895, June 1966; 2003–2004, serials 32308–32309, order 7925, October 1966; 2005–2007, serials 32491–32493, order 7937, June–July 1967.
  • The Diesel Shop, original Norfolk Southern motive power, revised June 15, 2019, data from R. Craig. The same road numbers and construction numbers. GP18s conveyed to the Southern as 180–195 and 196 and given high short hoods. GP38s conveyed as 2880–2886 and given high short hoods. GP38s 2001–2007 left the factory with low short hoods. Sources named there: Gary and Stephen Dolzall, Baldwin Diesel Locomotives; Diesel Era, on the GP18; Extra 2200 South, March 1968.
  • Norfolk & Southern Railway Historical Society, diesel roster posted from John F. Sullivan, “Norfolk Southern Railway,” Railfan & Railroad, August 1996. Southern numbers 180–196 for the GP18s. Retirement of the Baldwin switchers, the DRS-6-4-1500s, and AS-416s 1601–1605 in the mid-1960s. AS-416s 1606–1617 retired with the Southern merger, 1616 preserved at Spencer. No. 702 to Montpelier & Barre 30 in June 1967. Nos. 701 and 703 retired by the Southern in 1978. The society’s equipment list supplies the later owners of 701, 703, and 1616 used above. The chronology supplies the fleet counts: 18 diesels and 31 steam locomotives at the end of 1948; 23 diesels and 21 steam locomotives in 1951; 31 diesels on January 29, 1954, after 1611–1613.
  • Railroad Picture Archives. Southern GP38 2880, serial 31782, order 7895, built June 1966 as Norfolk Southern 2001, later Luxapalila Valley 2880. Southern 2881, serial 31783, built as Norfolk Southern 2002. Precision National 1616, photographed May 21, 1974, formerly Norfolk Southern 1616, later Peabody Coal 1616. DLCX 181, GP18, serial 27773, order 5655, formerly Norfolk Southern and Southern 181.
  • Durham & Southern page on this site. DRS-4-4-1500 No. 363, built as Norfolk Southern DRS-6-4-1500 No. 1504 in 1948.

Recent Articles

  1. Texas and Pacific Railway: Map, History, Timetables

    Nov 10, 26 10:33 PM

    1570098ujliu5009i1757093875.jpg
    The Texas & Pacific Railway, the federally chartered southern transcontinental that stopped at Sierra Blanca and became the Missouri Pacific's Texas and Louisiana main line. Merged October 15, 1976.

    Read More

  2. Texas and Pacific Steam Locomotives: Texas Types and Mountains

    Nov 10, 26 10:30 PM

    tp-2104-666.jpg
    Texas & Pacific steam: 70 Lima 2-10-4 Texas types, 600-669, classes I-1 through I-1d, and 10 Mountains, 900-909. No. 610 is at Palestine.

    Read More

  3. Texas and Pacific Diesel Roster (All-Time)

    Nov 10, 26 10:29 PM

    42767812_1995248017433792_890057054981455872_n.jpg
    All-time diesel roster of locomotives built for the Texas & Pacific. 246 units: E7s, E8s, 83 F7A and 35 F7B, NW2s, SW7s, SW8s, SW9s, GP7s, GP9s, GP18s, and GP35s. Serials and order numbers.

    Read More

  4. Santa Fe-Southern Pacific Railroad: Merger, History, Paint Scheme

    Nov 10, 26 10:07 PM

    2262007651g1bn12o60202793908.jpg
    The proposed Santa Fe-Southern Pacific merger, from the 1980 attempt and the 1983 holding company through the ICC denial, the Kodachrome paint, and the sale of the Southern Pacific.

    Read More

  5. CSX Santa Train Will Feature Locomotives 250 and 2026

    Nov 10, 26 01:51 PM

    csx-santa-train-250.jpg
    The CSX Santa Train will feature locomotives 250 and 2026 on November 21, 2026. The 84th running covers 110 miles from Shelbiana, Kentucky, to Kingsport, Tennessee.

    Read More

  6. Denton County Asks to Extend Stadler Car Relief

    Nov 10, 26 01:05 PM

    Denton County Transit Authority has asked the FRA to extend a waiver for its Stadler diesel multiple-unit cars. Comments run to January 11, 2027.

    Read More

  7. FreightCar America Reports Third-Quarter Results

    Nov 10, 26 01:02 PM

    freightcaramerica-ballastcar.jpg
    FreightCar America reported third-quarter revenue of $76.5 million and 662 railcar deliveries. Backlog stood at 2,660 cars valued at $284.5 million.

    Read More

  8. Amtrak Has Filed a Train Control Amendment

    Nov 10, 26 12:53 PM

    ethanallen-100-ny-dk.jpg
    Amtrak asked the FRA on October 26, 2026, to amend the safety plan for its Interoperable Electronic Train Management System. Comments are due November 30, 2026.

    Read More

  9. SunRail Signal Waiver Is Open for Comment

    Nov 10, 26 12:25 PM

    sunrail-107-sanford.jpg
    FRA has asked for comment on a petition to extend signal-testing relief on the Central Florida Rail Corridor. The notice names both the corridor and CSXT. Comments run to January 11, 2027.

    Read More

  10. Cars and Units Rose With BNSF Third-Quarter Earnings

    Nov 10, 26 12:18 PM

    bnsf-fullerton-2017-dk.jpg
    Berkshire Hathaway reports that after-tax BNSF earnings increased 19.3 percent in the third quarter of 2026, with car and unit volumes up 3.9 percent.

    Read More

  11. Amtrak Chicago Platforms Are Moving Toward Level Boarding

    Nov 10, 26 12:13 PM

    amtrak-cus-815.jpg
    Amtrak says construction is underway soon on the first level boarding platforms at Chicago Union Station, a 112 million dollar, 30-month project.

    Read More

  12. Maryland Has New Penn Line Times on November 16

    Nov 10, 26 12:07 PM

    marc-trn33-gaithersburgmd.jpg
    MARC Penn Line schedules change on November 16, 2026, after Amtrak trains return to regular schedules. Weekend southbound trains are unchanged.

    Read More

  13. Building Contract for Metrolink Sidings Goes to Granite

    Nov 10, 26 12:00 PM

    metro-850-sanclement.jpg
    Granite says Metrolink awarded a 51.5 million dollar SCORE contract for sidings near downtown Los Angeles and in Rancho Cucamonga.

    Read More

  14. EMD "F2" Locomotives: Specs, Roster, History

    Nov 10, 26 12:22 AM

    385273582375282934823583429866.jpg
    EMD F2, the 1,350-horsepower bridge between the FT and the F3. 104 locomotives, July through November 1946. Spotting features, specifications, and the production roster.

    Read More

  15. Southern Pacific Diesel Roster (All-Time)

    Nov 10, 26 12:08 AM

    sp-ml4000-9013.jpg
    Southern Pacific diesel roster with builder serials, order numbers, Texas and New Orleans numbers, and the 1965 renumbering. Alco, Baldwin, Fairbanks-Morse, Electro-Motive, General Electric, Krauss-Ma…

    Read More

  16. Southern Pacific Steam Roster: Post 1900

    Nov 09, 26 11:56 PM

    34692934982375275782689304973908.jpg
    Southern Pacific steam locomotives built since 1900. Pacific Lines, Texas and Louisiana Lines, cab-forwards, the GS 4-8-4s, and five narrow-gauge Ten-Wheelers. The quantity column counts the rows as p…

    Read More

  17. Canal Street Yard Assessment Stays Open Through December 7

    Nov 09, 26 01:07 PM

    The FRA signed the Canal Street Yard environmental assessment on November 6, 2026. Public inspection runs through December 7, and meeting dates are not confirmed.

    Read More

  18. NS Legacy Cab-Signal Comments Are Due November 9

    Nov 09, 26 01:05 PM

    ns-3395-sayre.jpg
    The FRA must receive comments by November 9, 2026, on a Norfolk Southern plan to drop legacy cab signals on 14 line segments and rely on positive train control.

    Read More

  19. Elimination Grant of $27.8 Million Reaches Scott Road in Allen County

    Nov 09, 26 12:53 PM

    Allen County received $27,878,116, also stated as $27.8 million, to design and build a grade separation where Scott Road crosses Norfolk Southern.

    Read More

  20. Vermont Receives $60.3 Million for the Western Corridor

    Nov 09, 26 12:45 PM

    vmt-431-dk.jpg
    Vermont will receive $60.3 million to rehabilitate about 60 miles of the Western Corridor. The delegation quote also calls the sum $60 million.

    Read More

  21. Burlingame Grade Separation Wins a Federal Grant

    Nov 09, 26 10:42 AM

    broadway-grade-burlingame.png
    Rep. Kevin Mullin said on November 5, 2026 that the FRA awarded $90.4 million for the Caltrain Broadway grade separation in Burlingame. Early work is expected in May 2027.

    Read More

  22. Orange County Rail Line Gets a Coastal Permit

    Nov 09, 26 10:18 AM

    The California Coastal Commission on November 5, 2026 approved a 10-year permit for the San Clemente rail line, including about 690,000 cubic yards of sand.

    Read More

  23. Railroad Quiet Zones Are Reinstated in St. Louis

    Nov 09, 26 10:14 AM

    trra-2004-2012.jpg
    St. Louis said on November 6, 2026 that the FRA reinstated the city quiet zones. Horns are to stop after railroad systems are updated.

    Read More

  24. Southern Pacific Railroad: Map, History, Logo

    Nov 08, 26 01:58 PM

    7902976511n10780918y1939078.jpg
    The Southern Pacific, from the December 2, 1865 charter and the Big Four to Sprint, the Rio Grande Industries purchase of 1988, and the Union Pacific merger of February 1, 1997.

    Read More

  25. California Awards Flexible Rail Aid to Nine Projects

    Nov 08, 26 01:15 PM

    metro-880-600.jpg
    CalSTA on November 5, 2026 awarded $66.58 million in flexible State Rail Assistance to nine California projects. Each amount in the summary is a cap, printed as up to.

    Read More

  26. CSX Leaves Three Days Out of the Weekly Reports

    Nov 08, 26 12:02 PM

    csx-berea-2022.jpg
    CSX told the Surface Transportation Board it cannot recover October 27-29 data for the EP 724 and EP 787 reports covering the week ending October 30, 2026.

    Read More

  27. NJ Transit Advances Three Station Housing Projects

    Nov 08, 26 11:56 AM

    njt-4016.jpg
    NJ Transit on November 5, 2026 advanced station projects in Jersey City, Bound Brook, and Morristown. The three are projected to add more than 1,000 homes.

    Read More

  28. River Fox Train Wraps a Locomotive for America 250

    Nov 08, 26 11:06 AM

    riverfox-2658.jpg
    The River Fox Train in West Sacramento wrapped a locomotive with America 250 markings, the American flag, and the Sacramento skyline. The wrap is expected to stay through 2027.

    Read More

  29. California Keeps Metrolink Service in the 2027 Budget

    Nov 07, 26 11:35 PM

    metro-886-wm.png
    Metrolink says a California State Transportation Agency grant lets the proposed fiscal year 2027 budget keep service at current levels. The board hearing is November 13, 2026.

    Read More

  30. WM's 4-6-6-4 Locomotives (M-2): Specs, Roster, History

    Nov 07, 26 04:37 PM

    wm-4664-blw-1203.png
    Western Maryland class M-2, twelve Baldwin 4-6-6-4s numbered 1201-1212, built in 1940 and 1941 for Hagerstown-Connellsville fast freight. Roster, specifications, and retirement in 1952-1953.

    Read More

  31. Missouri Pacific Diesel Roster (All-Time)

    Nov 07, 26 04:26 PM

    80012871623622j2h6820937098.jpg
    Missouri Pacific diesel roster with builder serials, order numbers, subsidiary lettering, and renumberings. Alco, Baldwin, Electro-Motive, and General Electric. Texas and Pacific locomotives are on th…

    Read More

  32. Missouri Pacific Steam Roster (Built Since 1900)

    Nov 07, 26 04:21 PM

    mp-484-2113.jpg
    Missouri Pacific steam locomotives built since 1900. Drury quantity column 1,439. Sedalia rebuilds counted once, 1,407 frames. Last steam was 0-6-0 9301 in November 1955.

    Read More

  33. Missouri Pacific Railroad: Map, Locomotives, Logo, History

    Nov 07, 26 04:19 PM

    86920419917263722672869080270909.jpg
    The Missouri Pacific was a large Midwestern that carried a long history of financial difficulty until later years.

    Read More

  34. LIRR Service Changes Start on November 9

    Nov 07, 26 03:15 PM

    New Long Island Rail Road schedules start on every branch on Monday, November 9, 2026. Midday and weekend times change. Rush hour does not. Babylon service returns in stages.

    Read More

  35. Draft EA Reviews Norfolk Southern Track in London, Ohio

    Nov 07, 26 11:35 AM

    ns-easliverpool-2025.jpg
    The Surface Transportation Board environmental office issued a draft assessment on November 6, 2026, for about 0.96 miles of Norfolk Southern track in London, Ohio. Comments are due November 20.

    Read More

  36. Metrolink Lines Will Not Run on Three Routes November 7

    Nov 07, 26 10:53 AM

    metro-865-2011.jpg
    Metrolink will not run the Ventura County, Orange County, or Inland Empire-Orange County lines on November 7 and 8, 2026. The advisory says no substitute transportation will be provided.

    Read More

  37. Hartford Line Adds a Weekday Round Trip on November 16

    Nov 07, 26 10:48 AM

    ctdot-danbury-03.jpg
    Connecticut said the Hartford Line adds a weekday New Haven-Hartford round trip on November 16, starts a morning train in Springfield, and extends weekend stops to Windsor and Windsor Locks.

    Read More

  38. Board Issues a Policy Statement on Rail Preemption

    Nov 07, 26 10:44 AM

    nec-220-2025.jpg
    The Surface Transportation Board placed a policy statement on public inspection for the November 9 Federal Register. It reviews existing preemption precedent and says it makes no binding determination…

    Read More

  39. NJ Transit Restores Lines After the Newark Drawbridge Stop

    Nov 07, 26 10:37 AM

    njt-4019-23.jpg
    NJ Transit said Morris and Essex service between Hackettstown and Dover, and Montclair-Boonton service between Hackettstown and Montclair State University, resumed after the Newark Drawbridge stop.

    Read More

  40. EMD "SD35" Locomotives: Data Sheet, Specs, Roster

    Nov 06, 26 10:35 PM

    720774650013819109490158.jpg
    EMD SD35, 2,500 horsepower, 16-cylinder 567D3A, built June 1964 through January 1966. 360 locomotives. Specifications and the production roster by owner, serial, and order.

    Read More

  41. EMD "SDP35" Locomotives: Data Sheet, Specs, Roster

    Nov 06, 26 10:32 PM

    sal-sdp35-1115.jpg
    EMD SDP35, the steam-generator SD35. 35 locomotives, July 1964 through September 1965. Seaboard Air Line 1100-1119, Atlantic Coast Line 550, Louisville and Nashville 1700-1703, Union Pacific 1400-1409…

    Read More

  42. RJ Corman Will Be Replaced on Part of the Luzerne Lines

    Nov 06, 26 01:34 PM

    rn-tunkhannock-dk.jpg
    A November 6, 2026 notice says Wilkes-Barre Terminal Railway would acquire about 59.65 miles in Luzerne County and replace R.J. Corman as operator on part of the line. The earliest date is November 22…

    Read More

  43. NS Names a Student Hub at the University of Georgia

    Nov 06, 26 12:03 PM

    ns-3631-wc.jpg
    Norfolk Southern said a 100,000 dollar gift named a student-organization hub in Driftmier Engineering Center. The University of Georgia marked the naming on October 26. The space is for 23 clubs.

    Read More

  44. Union Pacific Filed Its Vena Recording Certification

    Nov 06, 26 11:56 AM

    up-9523-np.jpg
    Union Pacific filed a November 5, 2026 verified statement that the confidential label is off the March 17 Vena recording and that parties of record received a copy at 3:30 p.m. Eastern.

    Read More

  45. OmniTRAX Adds Tenants at Its Blue Island Hub

    Nov 06, 26 10:26 AM

    omnitrax-blueisland.jpg
    OmniTRAX has signed new construction-company leases at its 90-acre Blue Island, Illinois, hub and is planning a second phase.

    Read More

  46. Veterans and Active-Duty Members Exceed 16 Percent of Norfolk Southern

    Nov 06, 26 10:14 AM

    ns-9232-dk.jpg
    Norfolk Southern said on November 5, 2026, that more than 3,000 veterans and active-duty service members are more than 16 percent of its workforce. This year grants are $100,000 and $50,000.

    Read More

  47. BNSF: Merger Would Put Half of U.S. Rail Shipments Under One Railroad

    Nov 06, 26 10:00 AM

    bnsf-crawford-2009.jpg
    BNSF chief marketing officer Tom G. Williams told customers on November 3, 2026, that a Union Pacific-Norfolk Southern merger would put about half of U.S. rail shipments under one railroad. Nothing is…

    Read More

  48. Amtrak Opens a Winter Fare Sale

    Nov 06, 26 09:28 AM

    amtrk-pennsylvanian-2021.jpg
    Amtrak opened a Winter Wanderlust sale on November 5, 2026. Book by November 12 for travel from December 1, 2026, through March 14, 2027. Blackout dates apply. Coach and Acela Business only.

    Read More

  49. CN and CPKC Report October Grain Records

    Nov 06, 26 08:50 AM

    cpkc-9375-pimage.png
    CPKC reported October 2026 grain records in Canada and the United States. CN reported 3.54 million metric tonnes across Canada. The releases do not print a combined total.

    Read More

  50. New Brunswick Transload Gets CN Rail Service

    Nov 06, 26 08:49 AM

    cn-newbrunswick-transload.png
    CN said on November 4, 2026, that it has started serving AD Gagnon Transload Services near Grand Falls, New Brunswick. The site is three kilometres from the Trans-Canada Highway and lists room for 106…

    Read More