-
Home
›
-
Fallen Flags
›
-
Western Maryland
›
-
Durbin Branch
The Durbin Branch (Western Maryland): History, Map, Operations
Published: September 25, 2026
By: Adam Burns
The Durbin Branch was the Western Maryland’s way south from Elkins to the Chesapeake & Ohio. Forty-six point nine miles, two summits, two tunnels, and grades past 2 percent, it was built by the Coal & Iron Railway and opened to Durbin on July 27, 1903. Coal, lumber, and a mixed train were typical traffic on this line. The mixed train was the last passenger service the Western Maryland ran. The C&O line it met at Durbin along its Greenbrier Branch, and told in more detail in William McNeel’s Durbin Route.
Consolidation #752 at the depot in Durbin, West Virginia, with what appears to be the local from Elkins. Chesapeake & Ohio doodlebug #9055, and a combine, wait on the Greenbrier connection. No. 9055 will turn south along the Greenbrier River for Cass, Marlinton, and the main line at Ronceverte. Bill Price photo.
On this page:
At a glance ·
Coal & Iron ·
Forty-seven miles ·
What the branch did all day ·
Consolidations, then a hammerhead ·
After the Greenbrier closed
At a glance
| Item | Detail |
| Railroad | Western Maryland, Durbin Subdivision. Built by the Coal & Iron Railway, a West Virginia Central subsidiary |
| Charter | December 14, 1899 |
| Opened | Bemis, late 1902. Durbin, July 27, 1903 |
| Length | 46.9 miles, Elkins to Durbin (William McNeel) |
| Profile | Grades past 2 percent. Tunnel No. 1 under Cheat Mountain, south of Canfield. Tunnel No. 2 under Shavers Mountain, at Glady |
| Connection | Chesapeake & Ohio Greenbrier Branch at Durbin. The C&O was already there, open to Durbin on May 26, 1902 |
| Traffic | Lumber, coal, tanbark, local freight, and interchange cars for the C&O. Through cars between Ronceverte and Elkins from January 1, 1924 |
| Last passenger | Mixed train, Elkins–Durbin, April 10, 1959. Three days a week at the end |
| Last freight | Trains last ran in November 1983. Service to Durbin was discontinued February 15, 1984 |
A railroad to meet the C&O
Henry G. Davis wanted a southern outlet for the West Virginia Central. The Chesapeake & Ohio was building north along the Greenbrier River from Ronceverte, and the two companies settled on Durbin as the meeting place. The C&O’s Greenbrier Branch was open to Durbin on May 26, 1902. Davis’s connection was a new company. The Coal & Iron Railway was chartered on December 14, 1899, as a West Virginia Central subsidiary, and it left Elkins headed east, then turned south near Bowden.
The country did not cooperate. Grades ran past 2 percent. Tunnel No. 1 went under Cheat Mountain south of Canfield. Tunnel No. 2 went under Shavers Mountain near Glady. Service reached Bemis in late 1902. The rails reached Durbin on July 27, 1903. McNeel, whose book is really the biography of the C&O line, gives the Western Maryland distance from the Elkins station as 46.9 miles. Gould’s Western Maryland inherited the Coal & Iron with the West Virginia Central in 1905, and the branch became the Durbin Subdivision of the Elkins Division.
Forty-seven miles, and a junction at the end
Western Maryland system map, 1940, with the Durbin Branch highlighted. The blue line is the Coal & Iron route from Elkins to the C&O at Durbin.
A train leaving Elkins climbed into the Cheat country, passed Cheat Junction, where the Greenbrier, Cheat & Elk came in, and then faced the two summits. That junction was the door to the logging railroad and, after 1927, to the Elk River coal branches. The 1931 connector between that line and the Durbin Subdivision, built on a 2½ percent grade, let an Elkins–Spruce train stay on the mountain instead of running east to Durbin and backing out. Before that connector, the Durbin Branch was the only way off the GC&E.
Durbin itself was a small terminal with a large job. The Western Maryland depot and water tank sat beside the C&O’s Greenbrier Branch. A WM Consolidation could stand in front of the depot while a C&O doodlebug, bound south for Cass and Marlinton, waited on the other railroad. That is the photograph above: H-7B No. 752 on the home road, C&O 9055 on the connection. Durbin was near the north end of the Greenbrier, not the middle of it. From here the C&O followed the river south, past Cass, to the main line at Ronceverte.
What the branch did all day
The ordinary train was a local. It left Elkins with empties for the coal sidings and the lumber mills, picked up loads on the way south, and did the same work northbound. Tanbark, mine supplies, and a merchandise car for a store at Bemis or Glady rode with the hoppers. The grades meant short trains and a Consolidation that was already working hard with a modest consist. This was not a place for the I-2 Decapods or the 2-8-8-2s. Those engines belonged on the Blue Ridge and on Black Fork’s heavier coal. The Durbin Branch was a 2-8-0 railroad.
The junction made some of those locals more than locals. In late 1923 the two companies agreed to interchange at Durbin as a north-south route. Heavier rail went down on the Greenbrier, and on January 1, 1924, through cars began moving between Ronceverte and Elkins. For a few years a load of Greenbrier lumber or a car of Elk River coal could cross the mountain system without going out to Cumberland and back. The volume was never Alphabet Route volume. It was enough to justify the interchange, a depot, and a mixed train.
Passenger service thinned to that mixed train. By the 1930s an H-7B or an H-8 drew it, freight cars ahead of a combine or a coach. At the end it ran three days a week. Ridership was small. The train survived because the branch still needed a freight crew, and the coach cost little once the engine was going anyway. It was the last passenger train on the Western Maryland. The final run was April 10, 1959.
The engines the branch actually used
No. 752, in the photograph, is a class H-7B Consolidation, one of 750–764, built by Richmond in 1912 with 60-inch drivers. That is the size of engine the Durbin job wanted: enough tractive force for a 2 percent railroad, small enough for the curves and the short turnouts at a mill. The H-8s, Schenectady 1914, with 52-inch drivers, shared the work. Both classes were still the usual power on the mixed train in the years just before the diesels. The full class list is the steam roster.
The last passenger engines were diesels. Four Alco RS3s, 192, 193, 194, and 197, arrived between May 1953 and September 1954 with a steam generator and a dynamic brake stuffed into a high short hood. Crews called them hammerheads. They drew the mixed train in its last seasons, then stayed in freight service after the coach came off. Geeps and the other RS3s covered the branch once steam was stored. Four-axle power remained the rule. The curves that had kept the 2-8-8-2s on the Blue Ridge kept the SD40s off this subdivision. The serials are the diesel roster.
A branch without its other railroad
The C&O filed on March 18, 1975, to abandon 92 miles of the Greenbrier from near North Caldwell to Durbin, and to leave the Western Maryland a 2.84-mile stub from Durbin up to Bartow. The Commission gave the C&O permission in 1978. Operations over most of that line ended at the close of 1978, and the rail was coming up in 1979. The Greenbrier River Trail is that grade. Once the southern connection was gone, the Durbin Branch no longer had a railroad to meet.
Chessie kept a local service a few years longer. In June 1983 the Western Maryland, the C&O, and the B&O asked to abandon the WM from Greenbrier Junction to Durbin, and the leftover C&O from Durbin to Bartow. The application priced a rehabilitation of Glady Tunnel at $565,000, and another $575,000 to tie and surface the line. The traffic would not pay for either. The last trains ran in November 1983. The Commission approved the abandonment on December 6, 1983, and service was discontinued on February 15, 1984.
What remains of the old subdivision is the Elkins end, from town out to Cheat Junction, owned by the West Virginia State Rail Authority and operated by the West Virginia Central. The rest of the grade toward Durbin is quiet. The wye at Durbin, where this branch once met the Greenbrier, is the north end of today’s Durbin & Greenbrier Valley. The Consolidation in the photograph, and the doodlebug beside it, were the daily railroad at that wye.
Related reading
Sources
- McNeel, William. The Durbin Route. The Coal & Iron’s 46.9 miles, the July 27, 1903 opening, and the C&O Greenbrier’s arrival at Durbin on May 26, 1902
- Cook, Roger, and Karl Zimmermann. The Western Maryland Railway: Fireballs and Black Diamonds. H-7B and H-8 assignments on the Durbin mixed
- Western Maryland Railway. Last passenger train, the Elkins–Durbin mixed, April 10, 1959. Hammerhead RS3s 192–194 and 197
- Interstate Commerce Commission abandonment record, Chesapeake & Ohio Greenbrier and Western Maryland Durbin, 1975–1984. Application of June 1983; last trains November 1983; approval December 6, 1983; discontinuance February 15, 1984
-
Nov 10, 26 12:22 AM
EMD F2, the 1,350-horsepower bridge between the FT and the F3. 104 locomotives, July through November 1946. Spotting features, specifications, and the production roster.
Read More
-
Nov 10, 26 12:08 AM
Southern Pacific diesel roster with builder serials, order numbers, Texas and New Orleans numbers, and the 1965 renumbering. Alco, Baldwin, Fairbanks-Morse, Electro-Motive, General Electric, Krauss-Ma…
Read More
-
Nov 09, 26 11:56 PM
Southern Pacific steam locomotives built since 1900. Pacific Lines, Texas and Louisiana Lines, cab-forwards, the GS 4-8-4s, and five narrow-gauge Ten-Wheelers. The quantity column counts the rows as p…
Read More
-
Nov 09, 26 01:07 PM
The FRA signed the Canal Street Yard environmental assessment on November 6, 2026. Public inspection runs through December 7, and meeting dates are not confirmed.
Read More
-
Nov 09, 26 01:05 PM
The FRA must receive comments by November 9, 2026, on a Norfolk Southern plan to drop legacy cab signals on 14 line segments and rely on positive train control.
Read More
-
Nov 09, 26 12:53 PM
Allen County received $27,878,116, also stated as $27.8 million, to design and build a grade separation where Scott Road crosses Norfolk Southern.
Read More
-
Nov 09, 26 12:45 PM
Vermont will receive $60.3 million to rehabilitate about 60 miles of the Western Corridor. The delegation quote also calls the sum $60 million.
Read More
-
Nov 09, 26 10:42 AM
Rep. Kevin Mullin said on November 5, 2026 that the FRA awarded $90.4 million for the Caltrain Broadway grade separation in Burlingame. Early work is expected in May 2027.
Read More
-
Nov 09, 26 10:18 AM
The California Coastal Commission on November 5, 2026 approved a 10-year permit for the San Clemente rail line, including about 690,000 cubic yards of sand.
Read More
-
Nov 09, 26 10:14 AM
St. Louis said on November 6, 2026 that the FRA reinstated the city quiet zones. Horns are to stop after railroad systems are updated.
Read More
-
Nov 08, 26 01:58 PM
The Southern Pacific, from the December 2, 1865 charter and the Big Four to Sprint, the Rio Grande Industries purchase of 1988, and the Union Pacific merger of February 1, 1997.
Read More
-
Nov 08, 26 01:15 PM
CalSTA on November 5, 2026 awarded $66.58 million in flexible State Rail Assistance to nine California projects. Each amount in the summary is a cap, printed as up to.
Read More
-
Nov 08, 26 12:02 PM
CSX told the Surface Transportation Board it cannot recover October 27-29 data for the EP 724 and EP 787 reports covering the week ending October 30, 2026.
Read More
-
Nov 08, 26 11:56 AM
NJ Transit on November 5, 2026 advanced station projects in Jersey City, Bound Brook, and Morristown. The three are projected to add more than 1,000 homes.
Read More
-
Nov 08, 26 11:06 AM
The River Fox Train in West Sacramento wrapped a locomotive with America 250 markings, the American flag, and the Sacramento skyline. The wrap is expected to stay through 2027.
Read More
-
Nov 07, 26 11:35 PM
Metrolink says a California State Transportation Agency grant lets the proposed fiscal year 2027 budget keep service at current levels. The board hearing is November 13, 2026.
Read More
-
Nov 07, 26 04:37 PM
Western Maryland class M-2, twelve Baldwin 4-6-6-4s numbered 1201-1212, built in 1940 and 1941 for Hagerstown-Connellsville fast freight. Roster, specifications, and retirement in 1952-1953.
Read More
-
Nov 07, 26 04:26 PM
Missouri Pacific diesel roster with builder serials, order numbers, subsidiary lettering, and renumberings. Alco, Baldwin, Electro-Motive, and General Electric. Texas and Pacific locomotives are on th…
Read More
-
Nov 07, 26 04:21 PM
Missouri Pacific steam locomotives built since 1900. Drury quantity column 1,439. Sedalia rebuilds counted once, 1,407 frames. Last steam was 0-6-0 9301 in November 1955.
Read More
-
Nov 07, 26 04:19 PM
The Missouri Pacific was a large Midwestern that carried a long history of financial difficulty until later years.
Read More
-
Nov 07, 26 03:15 PM
New Long Island Rail Road schedules start on every branch on Monday, November 9, 2026. Midday and weekend times change. Rush hour does not. Babylon service returns in stages.
Read More
-
Nov 07, 26 11:35 AM
The Surface Transportation Board environmental office issued a draft assessment on November 6, 2026, for about 0.96 miles of Norfolk Southern track in London, Ohio. Comments are due November 20.
Read More
-
Nov 07, 26 10:53 AM
Metrolink will not run the Ventura County, Orange County, or Inland Empire-Orange County lines on November 7 and 8, 2026. The advisory says no substitute transportation will be provided.
Read More
-
Nov 07, 26 10:48 AM
Connecticut said the Hartford Line adds a weekday New Haven-Hartford round trip on November 16, starts a morning train in Springfield, and extends weekend stops to Windsor and Windsor Locks.
Read More
-
Nov 07, 26 10:44 AM
The Surface Transportation Board placed a policy statement on public inspection for the November 9 Federal Register. It reviews existing preemption precedent and says it makes no binding determination…
Read More
-
Nov 07, 26 10:37 AM
NJ Transit said Morris and Essex service between Hackettstown and Dover, and Montclair-Boonton service between Hackettstown and Montclair State University, resumed after the Newark Drawbridge stop.
Read More
-
Nov 06, 26 10:35 PM
EMD SD35, 2,500 horsepower, 16-cylinder 567D3A, built June 1964 through January 1966. 360 locomotives. Specifications and the production roster by owner, serial, and order.
Read More
-
Nov 06, 26 10:32 PM
EMD SDP35, the steam-generator SD35. 35 locomotives, July 1964 through September 1965. Seaboard Air Line 1100-1119, Atlantic Coast Line 550, Louisville and Nashville 1700-1703, Union Pacific 1400-1409…
Read More
-
Nov 06, 26 01:34 PM
A November 6, 2026 notice says Wilkes-Barre Terminal Railway would acquire about 59.65 miles in Luzerne County and replace R.J. Corman as operator on part of the line. The earliest date is November 22…
Read More
-
Nov 06, 26 12:03 PM
Norfolk Southern said a 100,000 dollar gift named a student-organization hub in Driftmier Engineering Center. The University of Georgia marked the naming on October 26. The space is for 23 clubs.
Read More
-
Nov 06, 26 11:56 AM
Union Pacific filed a November 5, 2026 verified statement that the confidential label is off the March 17 Vena recording and that parties of record received a copy at 3:30 p.m. Eastern.
Read More
-
Nov 06, 26 10:26 AM
OmniTRAX has signed new construction-company leases at its 90-acre Blue Island, Illinois, hub and is planning a second phase.
Read More
-
Nov 06, 26 10:14 AM
Norfolk Southern said on November 5, 2026, that more than 3,000 veterans and active-duty service members are more than 16 percent of its workforce. This year grants are $100,000 and $50,000.
Read More
-
Nov 06, 26 10:00 AM
BNSF chief marketing officer Tom G. Williams told customers on November 3, 2026, that a Union Pacific-Norfolk Southern merger would put about half of U.S. rail shipments under one railroad. Nothing is…
Read More
-
Nov 06, 26 09:28 AM
Amtrak opened a Winter Wanderlust sale on November 5, 2026. Book by November 12 for travel from December 1, 2026, through March 14, 2027. Blackout dates apply. Coach and Acela Business only.
Read More
-
Nov 06, 26 08:50 AM
CPKC reported October 2026 grain records in Canada and the United States. CN reported 3.54 million metric tonnes across Canada. The releases do not print a combined total.
Read More
-
Nov 06, 26 08:49 AM
CN said on November 4, 2026, that it has started serving AD Gagnon Transload Services near Grand Falls, New Brunswick. The site is three kilometres from the Trans-Canada Highway and lists room for 106…
Read More
-
Nov 06, 26 08:47 AM
Union Pacific said on November 5, 2026, that passenger obligations would remain if it combines with Norfolk Southern. The capacity claim is a Union Pacific analysis, not a Surface Transportation Board…
Read More
-
Nov 05, 26 11:19 PM
Fairbanks-Morse Consolidation Line cab units, the C-Liners. 165 locomotives, Beloit and Kingston, March 1950 through February 1955. Models, specs, and production rosters.
Read More
-
Nov 05, 26 12:03 PM
Atlanta, Birmingham & Coast, from Brunswick and Waycross to Atlanta and Birmingham. Atlantic Coast Line control at the close of 1926. Merged in January 1946 as the Western Division. Steam roster of th…
Read More
-
Nov 05, 26 12:00 PM
The El Paso & Southwestern, the Phelps Dodge copper railroad from Tucson to the Rock Island at Tucumcari. Southern Pacific control on October 31, 1924.
Read More
-
Nov 05, 26 11:55 AM
Brightline said on November 5, 2026, that trains to and from Orlando have resumed after weather suspensions in Brevard County. Later that morning the departures page still showed the Orlando segment s…
Read More
-
Nov 05, 26 11:43 AM
Metra says customers who want service alerts must sign up again at metratracker.com. The November 2 story says the new system has launched and the old email list is shut down. A notice on the same pag…
Read More
-
Nov 05, 26 11:38 AM
Norfolk Southern used one 26-hour window on the W Line for six projects in Indiana and Kentucky, including three bridge replacements. The October 27 account does not give the calendar day of the work.
Read More
-
Nov 05, 26 11:29 AM
The Federal Railroad Administration extended comments on a CSX petition for relief from some qualified mechanical inspector rules until December 2, 2026. The November 2 notice does not grant the waive…
Read More
-
Nov 05, 26 09:21 AM
Brightline said on November 4, 2026, that it expects trains to and from Orlando to resume on Thursday, November 5. South Florida stations kept running. The departures page still showed the Orlando seg…
Read More
-
Nov 05, 26 09:15 AM
The Federal Railroad Administration extended comments on a Union Pacific petition for relief from some qualified mechanical inspector rules until December 2, 2026. The November 2 notice does not grant…
Read More
-
Nov 05, 26 09:03 AM
WisDOT opened the draft 2027 State Freight Plan for comment through December 1, 2026. The plan covers freight rail with highways, harbors, aviation, and intermodal links. Completion is expected in sum…
Read More
-
Nov 05, 26 08:52 AM
U.S. railroads moved 514,080 carloads and intermodal units in the week ending October 31, 2026, up 3.5 percent from a year earlier, the Association of American Railroads said on November 4.
Read More
-
Nov 05, 26 08:49 AM
San Francisco Municipal Transportation Agency said on November 4, 2026 that Proposition H and a regional transit measure passed. Proposition H is about 160 million dollars a year for Muni. The regiona…
Read More