Published: October 12, 2026
By: Adam Burns
Pennsylvania Railroad class E2b was six experimental freight electrics from General Electric, numbered 4939 through 4944. Each was a B-B rated at 2,500 horsepower. The wire was the railroad’s 11,000-volt, 25-cycle catenary, and a transformer with a tap changer fed that current to alternating-current traction motors. Engines 4939 through 4942 arrived in 1951–52. General Electric built 4943 and 4944 as demonstrators to show the Great Northern, and the Pennsylvania bought them in March 1953. All six were scrapped in 1964.
The class letters E2b had already been used on a Pennsylvania 4-4-2 Atlantic. The locomotives on this page are the freight electrics of the early 1950s. Freight under the wire was still a P5a boxcab, and these six were General Electric’s half of a ten-engine experiment aimed at a replacement. They were built to multiple with the alternating-current engines already on the property, and the six were commonly made up as three pairs. The freight electric the railroad later bought in quantity is the E44.
A pair of Pennsylvania Railroad class E2b freight electrics with a freight at North Philadelphia, about 1956. The lead engine carries two pantographs, with the forward one raised. Photographer unknown. American-Rails.com collection.
On this page: At a glance · Ten experimentals · Straight alternating current · Specifications · Roster · On the railroad
| Item | Detail |
|---|---|
| Railroad | Pennsylvania Railroad |
| Class | E2b. Experimental freight electric |
| Road numbers | 4939–4944. Six locomotives, numbered straight through |
| Builder | General Electric |
| Built | 4939–4942 in 1951–52. Demonstrators 4943 and 4944, purchased March 1953 |
| Wheel arrangement | B-B. Four axles, each motored |
| Line current | 11,000 volts, 25 Hz AC, overhead catenary |
| Horsepower | 2,500 per locomotive. A pair is 5,000 |
| Work | Freight. Commonly three pairs. Able to multiple with a P5a |
| Disposition | Scrapped in 1964 |
The passenger motor under Pennsylvania catenary was the GG1. Freight was the P5a, a 2-C-2 from the electrification into Washington and Harrisburg. On the modified engines the crew sat back from the nose. By the early 1950s the P5a was an old locomotive for the job it was still doing. The railroad went looking for a freight electric it could order in quantity. What it bought first was a comparison.
Ten locomotives came out of that comparison. General Electric’s six are this class. Baldwin-Westinghouse delivered the other four in 1951, and those four tried the electrical path the next production engine would use. An ignitron rectifier took the alternating current off the wire and supplied direct current to the traction motors. Class E3b, numbers 4995 and 4996, rode on three two-axle trucks, a B-B-B, and was rated 3,000 horsepower. Class E3c, numbers 4997 and 4998, rode on two three-axle trucks, a C-C, from the same order. The full class list is on the electric roster.
All ten were scrapped in 1964. Baldwin-Westinghouse had left the locomotive business. The rectifier stayed. General Electric built it into the E44, delivered from 1960 through 1963, and that is the freight motor the experiment was reaching for.
An E2b looks like a step toward the diesel. Robert S. McGonigal’s note on the class makes the distinction that matters: the cab and the running gear followed diesel practice, and the motors were conventional alternating-current machines, the family already under a P5a and a GG1. Line current at 11,000 volts and 25 cycles came down through the pantograph to a transformer. The tap changer set what the motors saw, and the motors took that current as alternating current.
That choice is why an E2b could run in multiple with the electrics the Pennsylvania already owned. The partner in those mixed sets was generally a P5a boxcab. On their own, the six were commonly kept as three pairs, each pair a 5,000-horsepower freight locomotive. The lead engine in the North Philadelphia photograph carries two pantographs, with the forward one against the wire.
The published class figures are 2,500 horsepower, 35,400 pounds of tractive effort, and 65 miles an hour. The class table gives the tractive effort as that single figure.
| Item | Detail |
|---|---|
| Class | E2b |
| Type | Experimental freight electric |
| Wheel arrangement | AAR B-B. Four axles, all powered. UIC Bo-Bo |
| Quantity | 6 |
| Road numbers | 4939–4944 |
| Builder | General Electric |
| Order engines | 4939–4942, delivered 1951–52 |
| Demonstrators | 4943 and 4944, built for General Electric to show the Great Northern, purchased by the Pennsylvania in March 1953 and numbered into the class |
| Line current | 11,000 volts, 25 Hz AC |
| Current collection | Pantograph, from overhead catenary |
| Transmission | Transformer tap changer to AC traction motors |
| Horsepower | 2,500 per locomotive |
| Tractive effort | 35,400 lb, published as a single class figure |
| Maximum speed | 65 mph, the published class figure |
| Multiple-unit | With the railroad’s other straight-AC electrics. Commonly paired with a second E2b, and also run with a P5a |
| Disposition | All six scrapped in 1964 |
Six locomotives, 4939 through 4944. Every engine is General Electric, class E2b, B-B, 2,500 horsepower, and every engine was scrapped in 1964. The four from the railroad’s order arrived in 1951–52. The two demonstrators were purchased in March 1953.
| Road no. | Builder | How it joined the class | Disposition |
|---|---|---|---|
| 4939 | General Electric | 1951–52 order | Scrapped 1964 |
| 4940 | General Electric | 1951–52 order | Scrapped 1964 |
| 4941 | General Electric | 1951–52 order | Scrapped 1964 |
| 4942 | General Electric | 1951–52 order | Scrapped 1964 |
| 4943 | General Electric | Demonstrator. Purchased March 1953 | Scrapped 1964 |
| 4944 | General Electric | Demonstrator. Purchased March 1953 | Scrapped 1964 |
The published record of the class is a handful of trains, which is about what six engines leave behind. In February 1954 Trains & Travel ran H. N. Proctor’s photograph of 4943 and 4939 at Potomac Yard, Severn, Maryland, ready to leave with train EC-5. The demonstrator and one of the order engines were already a pair in through freight. On July 5, 1955, a Fred R. Kern slide shows 4939 and a mate near Frankford Junction, on the Philadelphia electrification. The photograph at the top of this page is another pair at North Philadelphia, about 1956.
They were still at it late. A color slide dated August 15, 1960, shows 4944 at Enola, Pennsylvania, coupled to P5a 4733, the mixed multiple-unit set the class had been built to allow. The E44s were in delivery by then. The six E2bs were scrapped in 1964.
Related pages: Pennsylvania electric roster · Pennsylvania Railroad · GG1 · E44 · B1 switchers · Pennsylvania steam roster · Electric locomotives
Oct 12, 26 10:52 PM
Oct 12, 26 10:33 PM
Oct 12, 26 10:10 PM
Oct 12, 26 09:55 PM
Oct 12, 26 09:52 PM
Oct 12, 26 09:27 PM
Oct 12, 26 08:41 PM
Oct 12, 26 02:44 PM
Oct 12, 26 12:50 PM
Oct 12, 26 11:44 AM
Oct 12, 26 11:39 AM
Oct 12, 26 09:40 AM
Oct 12, 26 12:15 AM
Oct 11, 26 05:44 PM
Oct 11, 26 05:39 PM
Oct 11, 26 05:19 PM
Oct 11, 26 05:15 PM
Oct 10, 26 11:51 PM
Oct 10, 26 11:22 PM
Oct 10, 26 11:16 PM
Oct 10, 26 10:54 PM
Oct 10, 26 09:33 PM
Oct 10, 26 09:08 PM
Oct 10, 26 06:35 PM
Oct 10, 26 06:31 PM
Oct 10, 26 06:26 PM
Oct 10, 26 05:36 PM
Oct 09, 26 10:31 PM
Oct 09, 26 12:26 PM
Oct 09, 26 11:31 AM
Oct 09, 26 10:42 AM
Oct 09, 26 10:41 AM
Oct 09, 26 10:36 AM
Oct 08, 26 11:48 PM
Oct 08, 26 11:37 PM
Oct 08, 26 11:34 PM
Oct 08, 26 11:00 PM
Oct 08, 26 04:28 PM
Oct 08, 26 03:59 PM
Oct 08, 26 02:34 PM
Oct 08, 26 02:12 PM
Oct 08, 26 01:46 PM
Oct 08, 26 10:32 AM
Oct 08, 26 09:24 AM
Oct 08, 26 12:08 AM
Oct 07, 26 12:09 PM
Oct 07, 26 12:05 PM
Oct 07, 26 12:02 PM
Oct 07, 26 11:39 AM
Oct 07, 26 11:26 AM