1. Home
  2. ›
  3. Fallen Flags
  4. ›
  5. Norfolk & Western
  6. ›
  7. Diesel Roster

Norfolk & Western Diesel Roster (All-Time)

Published: October 12, 2026

By: Adam Burns

The Norfolk & Western’s own diesel fleet begins in the fall of 1955, with four GP9s and four RS-3s, and it ends with C36-7s delivered in 1981 and 1982. Its own orders were hood units from Electro-Motive, Alco, and General Electric, and the road units carried a high short hood. The F7s and E8s in Norfolk & Western paint arrived with the Wabash lease of October 16, 1964.

Locomotives built new for the Norfolk & Western total 1,464. That figure is the quantity column of the three builder tables below. It includes five GP9 replacement frames, the C425s the Wabash had ordered and the N&W received, two GP35s the Pittsburgh & West Virginia had ordered, and one replacement U25B. Merger-road fleets, two leased commuter cabs, and the yard slugs are counted in their own tables.

Norfolk and Western GP9 No. 502, built as 764, at Roanoke in March 1959

GP9 No. 502, built as No. 764 in 1957, at Roanoke, Virginia, in March 1959. Norfolk & Western publicity photograph.

On this page: At a glance · What was bought new · Electro-Motive · Alco · General Electric · Leased cabs and slugs · Virginian, Nickel Plate, and the others · Wabash cabs · How to count the tables

At a glance

ItemDetail
RailroadNorfolk & Western. Mark NW. Company page: Norfolk & Western
Built new for the N&W1,464 locomotives. Electro-Motive 990, Alco 219, General Electric 255
First road dieselsSeptember 1955. GP9s 10–13, later 710–713. RS-3s 300–303, September–October 1955
Last new powerSix SD50S, 6500–6505, December 1980. C36-7s 8500–8530 (2nd), 31 locomotives, 1981–1982
Inside the 1,464Five GP9 replacement frames. C425s 1000–1006, ordered by the Wabash and delivered to the N&W. GP35s 1300–1301, ordered by the Pittsburgh & West Virginia and delivered to the N&W. U25B 3515
Outside the 1,464Two leased F40PHs. Twenty-nine slugs. Virginian diesel blocks, 65. Nickel Plate blocks, 395. Pittsburgh & West Virginia Fairbanks-Morse units, 26. Illinois Terminal units carried on the N&W, 41. Wabash cabs and U25Bs, described below
ElectricsTen Virginian EL-C units, 301–310, stay with the electric roster

Information compiled October 12, 2026.

Hoods, high short hoods, and five replacement frames

Stuart T. Saunders became president on April 1, 1958, and the buying that had started with eight road units in 1955 became a fleet. The railroad specified a high short hood on the road units it ordered. GP9s dominate the first years: 306 frames, including three replacement frames for 799, 800, and 805, and two more for 813 and 817. After the first four units were renumbered, and after 762–767 became 500–505, the GP9 number slots come to about 300. The frames are 306. Four of those GP9s, 713, 714, 716, and 730, were later rebuilt as GP9R 5000–5003, the same four locomotives. Nos. 903 and 905 were modified in later years.

Alco’s contribution is 219 locomotives, from the T-6 switchers and the RS-3s through the C630s. General Electric’s is 255, from the U28B to the C36-7. The last SD40-2 order is eighteen locomotives, serials 796353-1 through 796353-18, dated December 1980, recorded against the number series 6189–6207. Eighteen serials are what the order contains. The new-locomotive total uses eighteen.

Electro-Motive, built new

Nine hundred and ninety locomotives. GP9s account for 306 of them, GP18s for 48, GP30s for 44, GP35s for 69, GP40s for 60, GP38ACs for 55, SD35s for 80, SD40s for 45, SD40-2s for 162, SD45s for 115, and SD50S units for 6.

ModelNumbersQtySerialOrderBuiltNotes
GP910–13421012–210155418September 1955Later 710–713
GP9506–5211624948–249635583November–December 1958Steam generators
GP9620–6634424772–248155582October 1958–February 1959
GP9664–699, 843–8504424816–2485955861959One order. 664–699 is 36 locomotives and 843–850 is 8
GP9714–7342121833–218535459July 1956
GP9735–7612722158–221845476December 1956 and February 1957
GP9762–767622185–221905486February 1957Later 500–505. Steam generators. No. 502 was built as 764
GP9768–7973023045–230745522April–May 1957
GP9798–8121523251–232655535May 1957
GP9799 (2nd), 800 (2nd), 805 (2nd)324736–247388054July 1958Replacement frames
GP9813–8423024436–244655571March–June 1958
GP9813 (2nd), 817 (2nd)224734–247358053June 1958Replacement frames
GP9851–8944424860–2490355871959
GP9895–9142024904–2492355881959, through September
GP18915–9382424924–249475609December 1959–January 1960
GP18939–9622426780–268035633June–August 1961
GP30522–5583727355–273915637June–August 1962
GP305591279785637August 1962
GP30560–565627393–273985637August–September 1962
GP35200–2141528615–286295657November–December 1963
GP35215–2382429215–292385665March–April 1964
GP352391293695665March–April 1964
GP351300–1301229859–298607768November 1964Ordered by the Pittsburgh & West Virginia. Delivered as N&W
GP351302–1308729658–296647760November 1964Serials 29665–29667, three units, were cancelled
GP351309–13282030278–302975679January–March 1965
GP401329–13583031869–318987901April–May 1966
GP401359–13832533250–332747054August–September 1967
GP401384–1388533275–332795733September 1967
GP38AC4100–41242535620–356447326June–October 1971The number series skips 4125–4129
GP38AC4130–41441535645–356595775June–October 1971
GP38AC4145–41591538188–382025775September–December 1971
SD351500–15202130761–307817819June–August 1965
SD351521–1529930782–307907820August 1965
SD351530–15532431162–311855698October–November 1965A yard slug was later built from No. 1530
SD351554–1559631136–3114178531965
SD351560–15731431142–3115578541965
SD351574–1579631156–3116178551965
SD401580–16093031899–319285707May–June 1966
SD401610–16241535605–356197320May 1971
SD40-21625–16351173638-1 to 73638-1173638September 1973
SD40-21636–16521774615-1 to 74615-1774615July 1974
SD40-26073–61386675622-1 to 75622-6675622February–May 1975
SD40-26139–618850776086-1 to 776086-50776086April–June 1978
SD40-26189–620718796353-1 to 796353-18796353December 1980Eighteen serials are recorded against the number series 6189–6207
SD451700–1704531955–319595705July 1966
SD451705–17292531960–319847905September 1966
SD451730–1734531985–319897904July–September 1966
SD451735–1738432699–327027953April–May 1967
SD451739–17642632703–327287988July–August 1967
SD451765–17892535521–355457199February 1970No. 1776 wore the bicentennial scheme
SD451790–18142535546–355705745December 1969–March 1970
SD50S6500–65056806030-1 to 806030-6806030December 1980

Alco, built new

Two hundred and nineteen locomotives. The T-6s are 40, the RS-3s are 8, the RS-11s are 99, the RS-36s are 6, the C420s are 8, the C425s are 18, the C628s are 30, and the C630s are 10. Century order numbers are in the Order column. The earlier Alco construction numbers are in the Serial column.

ModelNumbersQtySerialOrderBuiltNotes
T-610–21 (2nd)1282309–82320January–March 1959Second use of the 10–21 series, after the GP9s had been renumbered
T-622–492883364–83391April–October 1959Nos. 40 and 41 went to the Chesapeake Western as 10 and 11
RS-3300–303481361–81364September–October 1955No. 300 is preserved
RS-3304–307481845–81848January–February 1956Later renumbered 99–92, in reverse order
RS-11308–3241781465–81475, 81775–81780March–April 1956
RS-11325–3401682057–82065, 82323–82329January–February 1957
RS-11341–3501082340–82342, 82358, 82372–82377June and November 1957
RS-11351–3762682628–82641, 82956–82967November–December 1957 and November–December 1958
RS-11377–3921683010–83013, 83395–83406January–March 1959
RS-11393–4061483435–83442, 83691–83696May–June 1959 and May–June 1961
RS-36407–412684107–84112March 1962
C420413–42083397-01 to 3397-08December 1964
C4251000–100673386-1 to 3386-7October 1964Ordered by the Wabash. Delivered as N&W. Nos. 1000, 1002, and 1005 were rebuilt and sold for mine service
C4251007–1016103400-1 to 3400-10January 1965High short hoods
C425101713426-1December 1965Renumbered 1011 (2nd) shortly after delivery
C6281100–1109103429-01 to 3429-10November 1965High short hoods. Sold to the Chicago & North Western
C6281110–1129203455-01 to 3455-20April 1966High short hoods. Sold to the Chicago & North Western
C6301130–113453456-01 to 3456-05May 1966
C6301135–113953480-01 to 3480-05September 1967No. 1135 is preserved

General Electric, built new

Two hundred and fifty-five locomotives. U28Bs are 30, U30Bs are 110, the single U25B is the replacement unit 3515, U30Cs are 3, C30-7s are 80, and C36-7s are 31. The U30Bs date from 1967, 1970, and 1971. The U30Cs are Nos. 8000–8002, ahead of the C30-7s.

ModelNumbersQtySerialOrderBuiltNotes
U28B1900–19141535957–35971July–August 1966
U28B1915–19291535972–35986September–October 1966
U30B1930–19441536256–36270March–May 1967
U30B1945–19642036326–36345June–July 1967
U30B8465–85145037441–37490August 1970–January 1971
U30B8515–85392537747–37771May 1971
U25B3515135581February 1965Replacement for a wrecked former Wabash U25B
U30C8000–8002339841–39843April 1974
C30-78003–80373542018–42052December 1978
C30-78038–80824542330–42374October 1979
C36-78500–8505 (2nd)643242–43247March 1981
C36-78506–8525 (2nd)2043852–43871May–June 1982
C36-78526–8530 (2nd)543770–437741981–1982

Two leased cabs, and the slugs

In November 1977 the Chicago Regional Transportation Authority leased the Norfolk & Western two F40PHs for the commuter trains the railroad operated on the former Wabash. The lease is its own count of 2. The yard slugs are a separate group of 29. A slug has no diesel engine of its own. The parents are named in the notes. Nos. 9900–9919 were built from former Wabash and Virginian H-24-66s.

ModelNumbersQtySerialOrderBuiltNotes
F40PH1151766062-16766062November 1977“Village of Oaklawn.” Leased from the Chicago RTA
F40PH1161766062-17766062November 1977“Village of Orland Park.” Leased from the Chicago RTA
ModelNumbersQtySerialOrderBuiltNotes
Slug, RP-G49700–97023Built from U30Bs
Slug9900–991920Built from former Wabash and Virginian H-24-66s
Slug9920–99212From N&W 255 and 257, nee Nickel Plate 330 and 332
Slug9922–99232From N&W 253 and 256, nee Nickel Plate 328 and 331
Slug99501From wrecked Erie Lackawanna SDP45 3637, EMD 34978, June 1969
Slug99511From SD35 1530

What the mergers brought

Each table below is a block of locomotives that received Norfolk & Western numbers, counted apart from the 1,464. The Akron, Canton & Youngstown entered the Norfolk & Western on October 16, 1964. Its diesel list awaits a later compilation.

Virginian, December 1, 1959

Sixty-five diesel locomotives took N&W numbers. Ten EL-C electrics, 301–310, built in October 1956, came in the same merger and were sold to the New Haven in 1962 as class EF-4. The electric class page is the Virginian EL-C. The railroad is the Virginian.

ModelNumbersQtySerialOrderBuiltNotes
H16-44110–14940Ex-Virginian 10–49
H24-66150–17425Ex-Virginian 50–74

Nickel Plate, October 16, 1964

Three hundred and ninety-five locomotives, counted by the N&W number blocks. The Nickel Plate page is the company history. Second N&W numbers, where the same units received them, are in the notes.

ModelNumbersQtySerialOrderBuiltNotes
RSD-122325–23339Ex-Nickel Plate 325–333
NW22011–202212Ex-Nickel Plate 11–22
S-22025–204521Ex-Nickel Plate 25–45
S-42046–2061, 2065–208335Ex-Nickel Plate 46–61 and 65–83
S-120851Ex-Nickel Plate 85
SW12105–21062Ex-Nickel Plate 105–106
SW82107–21148Ex-Nickel Plate 107–114
H10-442125–21339Ex-Nickel Plate 125–133
H12-442134–215522Ex-Nickel Plate 134–155
SW72230–22323Ex-Nickel Plate 230–232
SW92233–224412Ex-Nickel Plate 233–244
SD92340–235920Ex-Nickel Plate 340–359
GP72400–244748Ex-Nickel Plate 400–447. Later 1400–1447
GP92448–252477Ex-Nickel Plate 448–524
GP92525–253410Ex-Nickel Plate 525–534
RS-32535–255723Ex-Nickel Plate 535–557
RS-112558–257720Ex-Nickel Plate 558–577
C42025781Ex-Nickel Plate 578
GP182700–270910Ex-Nickel Plate 700–709
GP92800–281415Ex-Nickel Plate 800–814
RS-112850–286415Ex-Nickel Plate 850–864
RS-362865–287511Ex-Nickel Plate 865–875
GP302900–29091027894–27903November 1962
GP3529101Serial unrecorded

Pittsburgh & West Virginia

Twenty-six Fairbanks-Morse units. The two GP35s ordered by the Pittsburgh & West Virginia, Nos. 1300 and 1301, were delivered as Norfolk & Western and are already in the Electro-Motive table. The lease itself took effect at 12:01 a.m. on October 16, 1964. The company page is the Pittsburgh & West Virginia.

ModelNumbersQtySerialOrderBuiltNotes
H20-4450–7122
H16-4490–93 (2nd)4

Illinois Terminal, purchased September 1, 1981

Forty-one units carried on the Norfolk & Western roster from the Illinois Terminal. The Illinois Terminal’s separate corporate existence ended in 1982.

ModelNumbersQtySerialOrderBuiltNotes
SW12001201–121212
SW71220, 122121220 is ex-Union Pacific 1809 (1st). 1221 is ex-Chesapeake & Ohio 5228
GP20m2008, 20092Ex-Union Pacific 482 and 480
SW821151Ex-Illinois Terminal 801
SW15002290–22967Ex-Illinois Terminal 1509–1515
SD392961–29666Ex-Illinois Terminal 2301–2306
GP73401–34066Ex-Illinois Terminal 1501–1506
GP9m34191Ex-Southern Pacific 3419 (2nd), nee Southern Pacific 5628
GP38-24160–41634Ex-Illinois Terminal 2001–2004. No dynamic brakes

Wabash cabs, and the U25Bs

The Norfolk & Western ordered no EMD cab units. F7s and E8s in its paint came with the Wabash lease of October 16, 1964 and were renumbered into the 3600s and 3800s. F7A 3717 is former Wabash 1185. F7A 3666 is former Wabash 1159-A. E8A 3815 is the unit at WABIC Tower in the photograph. The pre-lease fleet, and its builder serials, is the Wabash page.

Norfolk and Western F7A No. 3717, former Wabash 1185, at Decatur, Illinois, on September 25, 1965

F7A No. 3717, former Wabash 1185, at Decatur, Illinois, on September 25, 1965. Dick Wallin photo. Warren Calloway collection.

Norfolk and Western E8A No. 3815 and a Geep at WABIC Tower, Decatur, Illinois, in May 1966

E8A No. 3815 and a Geep at WABIC Tower, Decatur, Illinois, in May 1966. The Wabash and the Illinois Central crossed there. Rick Burn photo.

Wabash U25Bs 500–514, fifteen locomotives built in May–August 1962, came onto the Norfolk & Western as 3516–3529, a series of fourteen numbers. They remained Wabash locomotives. U25B 3515, in the General Electric table, is a separate replacement locomotive built new for the N&W. Wabash C424s 3900–3906 had been ordered for the Nacional de México, cancelled before delivery, and placed on the Wabash in March 1964. Wabash B902, the missing unit in that series, was wrecked and stayed off the Norfolk Southern roster. Those C424s remained Wabash locomotives.

How to count the tables

Add the quantity column of the Electro-Motive, Alco, and General Electric tables. The sum is 1,464, and that is the number of locomotives built new for the Norfolk & Western. The leased F40PHs sum to 2. The slugs sum to 29. The Virginian diesel blocks sum to 65. The Nickel Plate blocks sum to 395. The Pittsburgh & West Virginia Fairbanks-Morse units sum to 26. The Illinois Terminal units sum to 41. Those six figures sit beside the 1,464. The ten EL-C electrics stand outside every diesel sum.

Related reading

Sources

  • John Komanesky, Norfolk & Western diesel roster, The Diesel Shop, revised February 13, 2021. Road numbers, dispositions, and the merger blocks
  • Andre Kristopans, Electro-Motive order list for the Norfolk & Western. Order numbers and serials for the EMD road units, including the split of GP9 orders 5586 and 5587 and the eighteen serials of SD40-2 order 796353
  • David Thompson, SD35 roster. Serials 31162–31185 for Nos. 1530–1553

Recent Articles

  1. Texas and Pacific Railway: Map, History, Timetables

    Nov 10, 26 10:33 PM

    1570098ujliu5009i1757093875.jpg
    The Texas & Pacific Railway, the federally chartered southern transcontinental that stopped at Sierra Blanca and became the Missouri Pacific's Texas and Louisiana main line. Merged October 15, 1976.

    Read More

  2. Texas and Pacific Steam Locomotives: Texas Types and Mountains

    Nov 10, 26 10:30 PM

    tp-2104-666.jpg
    Texas & Pacific steam: 70 Lima 2-10-4 Texas types, 600-669, classes I-1 through I-1d, and 10 Mountains, 900-909. No. 610 is at Palestine.

    Read More

  3. Texas and Pacific Diesel Roster (All-Time)

    Nov 10, 26 10:29 PM

    42767812_1995248017433792_890057054981455872_n.jpg
    All-time diesel roster of locomotives built for the Texas & Pacific. 246 units: E7s, E8s, 83 F7A and 35 F7B, NW2s, SW7s, SW8s, SW9s, GP7s, GP9s, GP18s, and GP35s. Serials and order numbers.

    Read More

  4. Santa Fe-Southern Pacific Railroad: Merger, History, Paint Scheme

    Nov 10, 26 10:07 PM

    2262007651g1bn12o60202793908.jpg
    The proposed Santa Fe-Southern Pacific merger, from the 1980 attempt and the 1983 holding company through the ICC denial, the Kodachrome paint, and the sale of the Southern Pacific.

    Read More

  5. CSX Santa Train Will Feature Locomotives 250 and 2026

    Nov 10, 26 01:51 PM

    csx-santa-train-250.jpg
    The CSX Santa Train will feature locomotives 250 and 2026 on November 21, 2026. The 84th running covers 110 miles from Shelbiana, Kentucky, to Kingsport, Tennessee.

    Read More

  6. Denton County Asks to Extend Stadler Car Relief

    Nov 10, 26 01:05 PM

    Denton County Transit Authority has asked the FRA to extend a waiver for its Stadler diesel multiple-unit cars. Comments run to January 11, 2027.

    Read More

  7. FreightCar America Reports Third-Quarter Results

    Nov 10, 26 01:02 PM

    freightcaramerica-ballastcar.jpg
    FreightCar America reported third-quarter revenue of $76.5 million and 662 railcar deliveries. Backlog stood at 2,660 cars valued at $284.5 million.

    Read More

  8. Amtrak Has Filed a Train Control Amendment

    Nov 10, 26 12:53 PM

    ethanallen-100-ny-dk.jpg
    Amtrak asked the FRA on October 26, 2026, to amend the safety plan for its Interoperable Electronic Train Management System. Comments are due November 30, 2026.

    Read More

  9. SunRail Signal Waiver Is Open for Comment

    Nov 10, 26 12:25 PM

    sunrail-107-sanford.jpg
    FRA has asked for comment on a petition to extend signal-testing relief on the Central Florida Rail Corridor. The notice names both the corridor and CSXT. Comments run to January 11, 2027.

    Read More

  10. Cars and Units Rose With BNSF Third-Quarter Earnings

    Nov 10, 26 12:18 PM

    bnsf-fullerton-2017-dk.jpg
    Berkshire Hathaway reports that after-tax BNSF earnings increased 19.3 percent in the third quarter of 2026, with car and unit volumes up 3.9 percent.

    Read More

  11. Amtrak Chicago Platforms Are Moving Toward Level Boarding

    Nov 10, 26 12:13 PM

    amtrak-cus-815.jpg
    Amtrak says construction is underway soon on the first level boarding platforms at Chicago Union Station, a 112 million dollar, 30-month project.

    Read More

  12. Maryland Has New Penn Line Times on November 16

    Nov 10, 26 12:07 PM

    marc-trn33-gaithersburgmd.jpg
    MARC Penn Line schedules change on November 16, 2026, after Amtrak trains return to regular schedules. Weekend southbound trains are unchanged.

    Read More

  13. Building Contract for Metrolink Sidings Goes to Granite

    Nov 10, 26 12:00 PM

    metro-850-sanclement.jpg
    Granite says Metrolink awarded a 51.5 million dollar SCORE contract for sidings near downtown Los Angeles and in Rancho Cucamonga.

    Read More

  14. EMD "F2" Locomotives: Specs, Roster, History

    Nov 10, 26 12:22 AM

    385273582375282934823583429866.jpg
    EMD F2, the 1,350-horsepower bridge between the FT and the F3. 104 locomotives, July through November 1946. Spotting features, specifications, and the production roster.

    Read More

  15. Southern Pacific Diesel Roster (All-Time)

    Nov 10, 26 12:08 AM

    sp-ml4000-9013.jpg
    Southern Pacific diesel roster with builder serials, order numbers, Texas and New Orleans numbers, and the 1965 renumbering. Alco, Baldwin, Fairbanks-Morse, Electro-Motive, General Electric, Krauss-Ma…

    Read More

  16. Southern Pacific Steam Roster: Post 1900

    Nov 09, 26 11:56 PM

    34692934982375275782689304973908.jpg
    Southern Pacific steam locomotives built since 1900. Pacific Lines, Texas and Louisiana Lines, cab-forwards, the GS 4-8-4s, and five narrow-gauge Ten-Wheelers. The quantity column counts the rows as p…

    Read More

  17. Canal Street Yard Assessment Stays Open Through December 7

    Nov 09, 26 01:07 PM

    The FRA signed the Canal Street Yard environmental assessment on November 6, 2026. Public inspection runs through December 7, and meeting dates are not confirmed.

    Read More

  18. NS Legacy Cab-Signal Comments Are Due November 9

    Nov 09, 26 01:05 PM

    ns-3395-sayre.jpg
    The FRA must receive comments by November 9, 2026, on a Norfolk Southern plan to drop legacy cab signals on 14 line segments and rely on positive train control.

    Read More

  19. Elimination Grant of $27.8 Million Reaches Scott Road in Allen County

    Nov 09, 26 12:53 PM

    Allen County received $27,878,116, also stated as $27.8 million, to design and build a grade separation where Scott Road crosses Norfolk Southern.

    Read More

  20. Vermont Receives $60.3 Million for the Western Corridor

    Nov 09, 26 12:45 PM

    vmt-431-dk.jpg
    Vermont will receive $60.3 million to rehabilitate about 60 miles of the Western Corridor. The delegation quote also calls the sum $60 million.

    Read More

  21. Burlingame Grade Separation Wins a Federal Grant

    Nov 09, 26 10:42 AM

    broadway-grade-burlingame.png
    Rep. Kevin Mullin said on November 5, 2026 that the FRA awarded $90.4 million for the Caltrain Broadway grade separation in Burlingame. Early work is expected in May 2027.

    Read More

  22. Orange County Rail Line Gets a Coastal Permit

    Nov 09, 26 10:18 AM

    The California Coastal Commission on November 5, 2026 approved a 10-year permit for the San Clemente rail line, including about 690,000 cubic yards of sand.

    Read More

  23. Railroad Quiet Zones Are Reinstated in St. Louis

    Nov 09, 26 10:14 AM

    trra-2004-2012.jpg
    St. Louis said on November 6, 2026 that the FRA reinstated the city quiet zones. Horns are to stop after railroad systems are updated.

    Read More

  24. Southern Pacific Railroad: Map, History, Logo

    Nov 08, 26 01:58 PM

    7902976511n10780918y1939078.jpg
    The Southern Pacific, from the December 2, 1865 charter and the Big Four to Sprint, the Rio Grande Industries purchase of 1988, and the Union Pacific merger of February 1, 1997.

    Read More

  25. California Awards Flexible Rail Aid to Nine Projects

    Nov 08, 26 01:15 PM

    metro-880-600.jpg
    CalSTA on November 5, 2026 awarded $66.58 million in flexible State Rail Assistance to nine California projects. Each amount in the summary is a cap, printed as up to.

    Read More

  26. CSX Leaves Three Days Out of the Weekly Reports

    Nov 08, 26 12:02 PM

    csx-berea-2022.jpg
    CSX told the Surface Transportation Board it cannot recover October 27-29 data for the EP 724 and EP 787 reports covering the week ending October 30, 2026.

    Read More

  27. NJ Transit Advances Three Station Housing Projects

    Nov 08, 26 11:56 AM

    njt-4016.jpg
    NJ Transit on November 5, 2026 advanced station projects in Jersey City, Bound Brook, and Morristown. The three are projected to add more than 1,000 homes.

    Read More

  28. River Fox Train Wraps a Locomotive for America 250

    Nov 08, 26 11:06 AM

    riverfox-2658.jpg
    The River Fox Train in West Sacramento wrapped a locomotive with America 250 markings, the American flag, and the Sacramento skyline. The wrap is expected to stay through 2027.

    Read More

  29. California Keeps Metrolink Service in the 2027 Budget

    Nov 07, 26 11:35 PM

    metro-886-wm.png
    Metrolink says a California State Transportation Agency grant lets the proposed fiscal year 2027 budget keep service at current levels. The board hearing is November 13, 2026.

    Read More

  30. WM's 4-6-6-4 Locomotives (M-2): Specs, Roster, History

    Nov 07, 26 04:37 PM

    wm-4664-blw-1203.png
    Western Maryland class M-2, twelve Baldwin 4-6-6-4s numbered 1201-1212, built in 1940 and 1941 for Hagerstown-Connellsville fast freight. Roster, specifications, and retirement in 1952-1953.

    Read More

  31. Missouri Pacific Diesel Roster (All-Time)

    Nov 07, 26 04:26 PM

    80012871623622j2h6820937098.jpg
    Missouri Pacific diesel roster with builder serials, order numbers, subsidiary lettering, and renumberings. Alco, Baldwin, Electro-Motive, and General Electric. Texas and Pacific locomotives are on th…

    Read More

  32. Missouri Pacific Steam Roster (Built Since 1900)

    Nov 07, 26 04:21 PM

    mp-484-2113.jpg
    Missouri Pacific steam locomotives built since 1900. Drury quantity column 1,439. Sedalia rebuilds counted once, 1,407 frames. Last steam was 0-6-0 9301 in November 1955.

    Read More

  33. Missouri Pacific Railroad: Map, Locomotives, Logo, History

    Nov 07, 26 04:19 PM

    86920419917263722672869080270909.jpg
    The Missouri Pacific was a large Midwestern that carried a long history of financial difficulty until later years.

    Read More

  34. LIRR Service Changes Start on November 9

    Nov 07, 26 03:15 PM

    New Long Island Rail Road schedules start on every branch on Monday, November 9, 2026. Midday and weekend times change. Rush hour does not. Babylon service returns in stages.

    Read More

  35. Draft EA Reviews Norfolk Southern Track in London, Ohio

    Nov 07, 26 11:35 AM

    ns-easliverpool-2025.jpg
    The Surface Transportation Board environmental office issued a draft assessment on November 6, 2026, for about 0.96 miles of Norfolk Southern track in London, Ohio. Comments are due November 20.

    Read More

  36. Metrolink Lines Will Not Run on Three Routes November 7

    Nov 07, 26 10:53 AM

    metro-865-2011.jpg
    Metrolink will not run the Ventura County, Orange County, or Inland Empire-Orange County lines on November 7 and 8, 2026. The advisory says no substitute transportation will be provided.

    Read More

  37. Hartford Line Adds a Weekday Round Trip on November 16

    Nov 07, 26 10:48 AM

    ctdot-danbury-03.jpg
    Connecticut said the Hartford Line adds a weekday New Haven-Hartford round trip on November 16, starts a morning train in Springfield, and extends weekend stops to Windsor and Windsor Locks.

    Read More

  38. Board Issues a Policy Statement on Rail Preemption

    Nov 07, 26 10:44 AM

    nec-220-2025.jpg
    The Surface Transportation Board placed a policy statement on public inspection for the November 9 Federal Register. It reviews existing preemption precedent and says it makes no binding determination…

    Read More

  39. NJ Transit Restores Lines After the Newark Drawbridge Stop

    Nov 07, 26 10:37 AM

    njt-4019-23.jpg
    NJ Transit said Morris and Essex service between Hackettstown and Dover, and Montclair-Boonton service between Hackettstown and Montclair State University, resumed after the Newark Drawbridge stop.

    Read More

  40. EMD "SD35" Locomotives: Data Sheet, Specs, Roster

    Nov 06, 26 10:35 PM

    720774650013819109490158.jpg
    EMD SD35, 2,500 horsepower, 16-cylinder 567D3A, built June 1964 through January 1966. 360 locomotives. Specifications and the production roster by owner, serial, and order.

    Read More

  41. EMD "SDP35" Locomotives: Data Sheet, Specs, Roster

    Nov 06, 26 10:32 PM

    sal-sdp35-1115.jpg
    EMD SDP35, the steam-generator SD35. 35 locomotives, July 1964 through September 1965. Seaboard Air Line 1100-1119, Atlantic Coast Line 550, Louisville and Nashville 1700-1703, Union Pacific 1400-1409…

    Read More

  42. RJ Corman Will Be Replaced on Part of the Luzerne Lines

    Nov 06, 26 01:34 PM

    rn-tunkhannock-dk.jpg
    A November 6, 2026 notice says Wilkes-Barre Terminal Railway would acquire about 59.65 miles in Luzerne County and replace R.J. Corman as operator on part of the line. The earliest date is November 22…

    Read More

  43. NS Names a Student Hub at the University of Georgia

    Nov 06, 26 12:03 PM

    ns-3631-wc.jpg
    Norfolk Southern said a 100,000 dollar gift named a student-organization hub in Driftmier Engineering Center. The University of Georgia marked the naming on October 26. The space is for 23 clubs.

    Read More

  44. Union Pacific Filed Its Vena Recording Certification

    Nov 06, 26 11:56 AM

    up-9523-np.jpg
    Union Pacific filed a November 5, 2026 verified statement that the confidential label is off the March 17 Vena recording and that parties of record received a copy at 3:30 p.m. Eastern.

    Read More

  45. OmniTRAX Adds Tenants at Its Blue Island Hub

    Nov 06, 26 10:26 AM

    omnitrax-blueisland.jpg
    OmniTRAX has signed new construction-company leases at its 90-acre Blue Island, Illinois, hub and is planning a second phase.

    Read More

  46. Veterans and Active-Duty Members Exceed 16 Percent of Norfolk Southern

    Nov 06, 26 10:14 AM

    ns-9232-dk.jpg
    Norfolk Southern said on November 5, 2026, that more than 3,000 veterans and active-duty service members are more than 16 percent of its workforce. This year grants are $100,000 and $50,000.

    Read More

  47. BNSF: Merger Would Put Half of U.S. Rail Shipments Under One Railroad

    Nov 06, 26 10:00 AM

    bnsf-crawford-2009.jpg
    BNSF chief marketing officer Tom G. Williams told customers on November 3, 2026, that a Union Pacific-Norfolk Southern merger would put about half of U.S. rail shipments under one railroad. Nothing is…

    Read More

  48. Amtrak Opens a Winter Fare Sale

    Nov 06, 26 09:28 AM

    amtrk-pennsylvanian-2021.jpg
    Amtrak opened a Winter Wanderlust sale on November 5, 2026. Book by November 12 for travel from December 1, 2026, through March 14, 2027. Blackout dates apply. Coach and Acela Business only.

    Read More

  49. CN and CPKC Report October Grain Records

    Nov 06, 26 08:50 AM

    cpkc-9375-pimage.png
    CPKC reported October 2026 grain records in Canada and the United States. CN reported 3.54 million metric tonnes across Canada. The releases do not print a combined total.

    Read More

  50. New Brunswick Transload Gets CN Rail Service

    Nov 06, 26 08:49 AM

    cn-newbrunswick-transload.png
    CN said on November 4, 2026, that it has started serving AD Gagnon Transload Services near Grand Falls, New Brunswick. The site is three kilometres from the Trans-Canada Highway and lists room for 106…

    Read More