Last revised: October 31, 2026
By: Adam Burns
The Wabash kept buying steam into 1931, and Decatur was still turning Mikado boilers into Hudsons in 1947. The quantity column on the post-1900 list is 708. Twenty-three Prairies rebuilt as Pacifics, and seven Mikados rebuilt as Hudsons, are listed again. Counted once, the frames are 678. Freight power from the Moguls of 1899 through the Mikados and the 2-10-2s was built around 64-inch drivers. The fast freight of the automobile years fell to the Mountains and the Northerns, with 70-inch drivers, and then to the diesels.
0-6-0 No. 546, Class B-7, awaits its fate at the shops in Decatur, Illinois, in late 1952. Baldwin built the locomotive in October 1907, serial 31865. It was scrapped in April 1953. Fred Byerly photo. American-Rails.com collection.
On this page: At a glance · Switchers · Moguls and Prairies · Mikados and 2-10-2s · Passenger power · Roster
| Item | Detail |
|---|---|
| Railroad | Wabash. Mark WAB. Company history |
| This table | Steam locomotives built since 1900. The 1899 Moguls stay, because they are the engines that finished the steam years |
| Switchers | 124. Six-wheel and eight-wheel |
| Moguls | 131. Classes F-4 through F-7, all with 64-inch drivers |
| Prairies | 90. Class G-1. Twenty-three were rebuilt as Pacifics and are listed again |
| Consolidations | 30 in the table, the ex-Wheeling & Lake Erie I-3s. Seventeen more, the I-2s, are named below and are outside the column |
| Mikados | 168 in the column. Twenty were on the road as Class K-2 after the Pere Marquette trade. The column counts both sides of that trade |
| 2-10-2s | 25. Class L-1, Brooks, 1917 |
| Atlantics | 28. Classes E-2, E-3, and E-4 |
| Ten-Wheelers | 16. Classes H-11 and H-12 |
| Pacifics | 39. Sixteen J-1s built new in 1912, and twenty-three J-2 rebuilds |
| Hudsons | 7. Class P-1, 700–706, rebuilt at Decatur in 1943–1947 from Mikados already in the column |
| Mountains | 25. Class M-1, 2800–2824, Baldwin, 1930 |
| Northerns | 25. Class O-1, 2900–2924. The class page carries the engines |
| Quantity column | 708 |
| Unique frames | 678 |
| Survivor | Mogul 573, at the National Museum of Transportation. The museum classes it F-5. One of two Wabash steam locomotives preserved |
The twentieth-century switcher fleet was three groups of 0-6-0s and then the 0-8-0s. Baldwin built the sixteen Class B-6s, 509–524, in 1903 and 1904. The forty-two B-7s, 525–566, came from Baldwin and Rhode Island between 1906 and 1912. No. 546, above, is one of them. Between 1917 and 1923 the Wabash rebuilt nineteen Moguls into B-8s, 481–499. The donors are not named on this list, and the B-8s are counted as the switchers they became.
The eight-wheel switchers followed the United States Railroad Administration pattern: 25-by-28-inch cylinders, 52-inch drivers, and 55,781 pounds of tractive effort. Two engines, 1501 and 1502, Class C-1, are rebuilds of 1917. The railroad’s own list treats them as former I-2 Consolidations. Schenectady delivered twenty C-3s in 1923, 1525–1544, weighing 217,500 pounds. Lima delivered twenty-five C-4s in 1926, 1545–1569, slightly heavier. They were the only Lima locomotives the Wabash owned. The last of both 0-8-0 classes lasted into 1951–1954.
Class C-3 0-8-0 No. 1540 at Decatur, Illinois, circa 1950. Fred Byerly photo. American-Rails.com collection.
Four groups of 2-6-0s were built from 1899 through 1904, every one of them on 64-inch drivers. The F-4s and F-7s were built simple. The F-5s and F-6s were compounds and were later simpled. Richmond and Rhode Island built the twenty-four F-4s in 1899, numbered 751–778 and later scattered through 569–599. That second span is wider than twenty-four engines. Four more 1899 engines, 752–755, are the F-5s, later numbered inside 571–586. The two classes are separate groups, and their later numbers overlap. Sixty-six F-6s, 801–866, came from Richmond and Baldwin in 1901–1903. Baldwin’s thirty-seven F-7s, 867–903, followed in 1904.
Steam outlasted the main-line freight diesels on one branch. By the end of 1953 the road freight was diesel. The Bluffs–Keokuk line kept 1899 Moguls into 1955, because 124,000 pounds was all the Illinois River bridge would carry. Mogul No. 573, built by Rhode Island in 1899 as No. 754, was given to the National Museum of Transportation in 1955. The museum’s own collection page classes it F-5. It is one of two Wabash steam locomotives that survive. Nos. 582 and 589 left the roster in June and July 1928.
The modern freight engine of 1906 and 1907 was the Prairie. Ninety G-1s, 2001–2090, came from Baldwin and Rogers. They weighed 228,200 pounds and rolled on 64-inch drivers. Between 1916 and 1926 the shops rebuilt twenty-three of them into J-2 Pacifics. The table lists the ninety Prairies and the twenty-three Pacifics. They are the same frames.
Both groups of twentieth-century Consolidations were secondhand, bought in 1910 and 1911. Seventeen I-2s had been built by Brooks in 1905 for the Detroit, Toledo & Ironton. Those seventeen sit outside the quantity column. The two C-1 switchers are the rebuilds the railroad counted separately. Thirty I-3s, 2301–2330, were Baldwin engines of 1906 from the Wheeling & Lake Erie. They are the Consolidations in the column.
The K-1 was the Wabash Mikado of 1912: sixty-three engines, 2401–2463, from Richmond, Baldwin, and Pittsburgh, with 64-inch drivers, 25½-by-30-inch cylinders, and an engine weight of 266,840 pounds. The next new freight power came in 1917 and 1918. Twenty-four of the K-1s were sold to the Algers, Winslow & Western, the Algoma Central & Hudson Bay, the Alton & Southern, and the Seaboard Air Line. Five of the Wabash numbers became Algoma Central 62 through 66: 2460, 2455, 2457, 2463, and 2458.
Schenectady delivered twenty United States Railroad Administration light Mikados in 1918, Class K-2, 2201–2220. They are shown with 64-inch drivers rather than the usual 63. Thicker tires may have been substituted. About a year later, 2213, 2214, 2215, 2218, and 2219 went to the Pere Marquette. Five Baldwin engines of 1918 came from Western Pacific 321–325 and took those same numbers. The column counts twenty Schenectady frames and five Baldwin frames. After the trade the Wabash had twenty K-2s.
The heavy Mikados were a Schenectady job of 1923 and 1925, still on 64-inch drivers, with 27-by-32-inch cylinders. Twenty-five K-3s, 2250–2274, came in 1923. The retirement column opens in 1944 because 2254 was scrapped that year. Five more engines of the same year, 2275–2279, were built with boosters and classed K-3b. They were new locomotives, not a later fitting. In 1925 the same works built twenty-five K-4s, 2720–2744, and twenty booster K-4bs, 2700–2719. Five K-5s, 2600–2604, were the three-cylinder engines: two 23-by-32-inch cylinders and a 23-by-28-inch cylinder between the frames.
The 2-10-2s belong with that freight program. Brooks built twenty-five L-1s in 1917, 2501–2525, on 64-inch drivers, and the weights ran from 325,000 to 338,580 pounds. They were the wrong engine once the railroad wanted faster freights. Thirteen were sold in 1941 and 1942 to the Kansas City Southern, the Missouri Pacific, and the Chicago & Eastern Illinois. The Chicago & Illinois Midland roster counts nine of these Brooks engines as its Class G-4, 651–659. Nos. 2503 and 2507 remained on the Wabash.
The Atlantics and Ten-Wheelers were the passenger engines of the new century. Richmond built six E-2s in 1901, 606–611, later carried as 694–699 and 624–629. Brooks built twelve E-3s in 1903, 612–623. Baldwin built ten E-4s in 1904, 602–611. Six H-11 Ten-Wheelers, Richmond, 1901, were 620–625 and later 630–635 and 1630–1635. Ten H-12s came from Baldwin in 1904, 636–645. The H-12s were gone by 1933. The E-4s lasted, some of them, until 1949.
The last new passenger steam, until the Hudson rebuilds, was the J-1 Pacific of 1912. Sixteen engines, 660–675: Richmond built 660–669 and Baldwin built 670–675. The J-2s were the twenty-three Prairie rebuilds. Six of them, 1676–1681, were finished in 1916 and 1917 for the Windsor–Buffalo trains. The American engines took 699 and then the next lower number as each one was completed, down through 683. Numbers 682 and 1682 were left vacant. The six Canadian engines were gone in 1951. The seventeen American rebuilds came off between 1947 and 1952.
During the war the Wabash had plenty of locomotives and not the ones the faster freights needed. The K-5 boilers were reused. In 1943 and 1944 Decatur built five 4-6-4s from those five boilers. In 1946 and 1947 the last two K-4s, 2743 and 2744, were called back for the same treatment. The seven Hudsons were Class P-1, 700–706, with 80-inch drivers. The builder on the list is the Wabash. The work was done at Decatur. They were off the roster in 1956. The table lists them, and it still lists the Mikados they had been.
The dual-service engines of 1930 were the end of new steam. Baldwin built twenty-five Class M-1 Mountains, 2800–2824, early in the year: 27-by-32-inch cylinders, 70-inch drivers, and 406,400 pounds. Tractive effort as built was 67,400 pounds. Boiler pressure was later raised. They worked the Montpelier–Decatur freight and, now and then, passenger trains. The same order produced twenty-five Class O-1 Northerns, 2900–2924, which went onto the freight roster from August 1930 through January 1931. Their story, including the Walschaerts and Baker split and the scrap dates of 1955 and 1956, is on the Class O-1 page. None of the Northerns was preserved. The Mountains’ retirement column on this list reads 1953.
The quantity column adds to 708. A blank cell is empty. Where a renumber series is longer than the quantity, the quantity is the figure in the table. The twenty-three J-2s and the seven P-1s are frames already counted as Prairies or Mikados. The seventeen I-2 Consolidations are not in the column.
| Type | Class | Numbers | Qty | Builder | Built | Retired | Notes |
|---|---|---|---|---|---|---|---|
| 0-6-0 | B-6 | 509-524 | 16 | Baldwin | 1903-1904 | 1931-1947 | — |
| 0-6-0 | B-7 | 525-566 | 42 | Baldwin, Rhode Island | 1906-1912 | 1949-1954 | — |
| 0-6-0 | B-8 | 481-499 | 19 | Wabash | 1917-1923 | 1931-1938 | Rebuilt from 2-6-0 |
| 0-8-0 | C-1 | 1501, 1502 | 2 | Rebuilt | 1917 | 1947 | — |
| 0-8-0 | C-3 | 1525-1544 | 20 | Schenectady | 1923 | 1951-1954 | — |
| 0-8-0 | C-4 | 1545-1569 | 25 | Lima | 1926 | 1951-1954 | — |
| 2-6-0 | F-4 | 751-778 | 24 | Richmond, Rhode Island | 1899 | 1927-1955 | Renumbered 569-599 |
| 2-6-0 | F-5 | 752-755 | 4 | Rhode Island, Richmond | 1899 | 1931-1953 | Renumbered 571-586 |
| 2-6-0 | F-6 | 801-866 | 66 | Richmond, Baldwin | 1901-1903 | 1930-1952 | — |
| 2-6-0 | F-7 | 867-903 | 37 | Baldwin | 1904 | 1931-1947 | — |
| 2-6-2 | G-1 | 2001-2090 | 90 | Baldwin, Rogers | 1906-1907 | 1934-1950 | 23 rebuilt to 4-6-2 |
| 2-8-0 | I-3 | 2301-2330 | 30 | Baldwin | 1906 | 1939-1947 | Ex-Wheeling & Lake Erie |
| 2-8-2 | K-1 | 2401-2463 | 63 | Richmond, Baldwin, Pittsburgh | 1912 | 1939-1954 | — |
| 2-8-2 | K-2 | 2201-2220 | 20 | Schenectady | 1918 | 1949-1953 | 2213, 2214, 2215, 2218, 2219 to Pere Marquette |
| 2-8-2 | K-2 | 2213, 2214, 2215, 2218, 2219 | 5 | Baldwin | 1918 | 1951-1952 | Ex-Western Pacific 321-325 |
| 2-8-2 | K-3 | 2250-2274 | 25 | Schenectady | 1923 | 1944-1955 | — |
| 2-8-2 | K-3b | 2275-2279 | 5 | Schenectady | 1923 | 1951-1952 | Built with boosters |
| 2-8-2 | K-4 | 2720-2744 | 25 | Schenectady | 1925 | 1951-1953 | 2743, 2744 rebuilt to 4-6-4 |
| 2-8-2 | K-4b | 2700-2719 | 20 | Schenectady | 1925 | 1951-1953 | Built with boosters |
| 2-8-2 | K-5 | 2600-2604 | 5 | Schenectady | 1925 | — | Rebuilt to 4-6-4 |
| 2-10-2 | L-1 | 2501-2525 | 25 | Brooks | 1917 | 1950-1951 | — |
| 4-4-2 | E-2 | 606-611 | 6 | Richmond | 1901 | 1931, 1933 | Renumbered 694-699, 624-629 |
| 4-4-2 | E-3 | 612-623 | 12 | Brooks | 1903 | 1933-1945 | — |
| 4-4-2 | E-4 | 602-611 | 10 | Baldwin | 1904 | 1936-1949 | — |
| 4-6-0 | H-11 | 620-625 | 6 | Richmond | 1901 | 1931 | Renumbered 630-635, 1630-1635 |
| 4-6-0 | H-12 | 636-645 | 10 | Baldwin | 1904 | 1931, 1933 | — |
| 4-6-2 | J-1 | 660-675 | 16 | Richmond, Baldwin | 1912 | 1951-1954 | — |
| 4-6-2 | J-2 | 683-699 | 17 | Wabash | 1916-1926 | 1947-1952 | Ex-G-1. 682 vacant |
| 4-6-2 | J-2 | 1676-1681 | 6 | Wabash | 1916-1917 | 1951 | Ex-G-1. Windsor-Buffalo. 1682 vacant |
| 4-6-4 | P-1 | 700-706 | 7 | Wabash | 1943-1947 | 1956 | Decatur. From the K-5s and K-4s 2743, 2744 |
| 4-8-2 | M-1 | 2800-2824 | 25 | Baldwin | 1930 | 1953 | — |
| 4-8-4 | O-1 | 2900-2924 | 25 | Baldwin | 1930 | 1955-1956 | — |
Oct 31, 26 12:35 AM
Oct 31, 26 12:30 AM
Oct 31, 26 12:28 AM
Oct 31, 26 12:18 AM
Oct 31, 26 12:11 AM
Oct 31, 26 12:06 AM
Oct 31, 26 12:01 AM
Oct 30, 26 11:01 PM
Oct 30, 26 08:36 PM
Oct 30, 26 04:03 PM
Oct 30, 26 03:59 PM
Oct 30, 26 03:41 PM
Oct 30, 26 01:36 PM
Oct 30, 26 01:18 PM
Oct 30, 26 01:00 PM
Oct 30, 26 12:38 PM
Oct 30, 26 12:03 PM
Oct 30, 26 10:25 AM
Oct 30, 26 09:14 AM
Oct 29, 26 11:12 PM
Oct 29, 26 07:58 PM
Oct 29, 26 06:52 PM
Oct 29, 26 10:56 AM
Oct 28, 26 11:54 PM
Oct 28, 26 11:48 PM
Oct 28, 26 11:44 PM
Oct 28, 26 10:51 PM
Oct 28, 26 10:48 PM
Oct 28, 26 10:43 PM
Oct 28, 26 10:37 PM
Oct 28, 26 04:31 PM
Oct 28, 26 11:05 AM
Oct 28, 26 10:13 AM
Oct 28, 26 10:09 AM
Oct 28, 26 09:55 AM
Oct 28, 26 09:48 AM
Oct 28, 26 09:43 AM
Oct 27, 26 11:02 PM
Oct 27, 26 10:55 PM
Oct 27, 26 10:49 PM
Oct 27, 26 10:24 PM
Oct 27, 26 10:32 AM
Oct 27, 26 10:27 AM
Oct 27, 26 10:25 AM
Oct 27, 26 09:52 AM
Oct 27, 26 12:12 AM
Oct 26, 26 01:44 PM
Oct 26, 26 01:38 PM
Oct 26, 26 01:20 PM
Oct 25, 26 11:38 PM