1. Home
  2. ›
  3. Fallen Flags
  4. ›
  5. Cincinnati, New Orleans and Texas Pacific Railway
  6. ›
  7. Diesel Roster

Cincinnati, New Orleans and Texas Pacific Diesel Roster (All-Time)

Last revised: October 7, 2026

By: Adam Burns

Southern locomotives lettered for the Cincinnati, New Orleans and Texas Pacific used Southern’s own number series. The subsidiary was the lessee of the city of Cincinnati’s railroad from Cincinnati to Chattanooga, and the same practice put CNO&TP initials on cabs, hoods, and switchers that worked that line and the rest of the Southern system. The tables list 317 locomotives. Each one is a unit the Southern compilation assigns to the CNO&TP, or a unit the Electro-Motive builder list sold to the Southern for that subsidiary.

Southern FP7 6146 with the Birmingham Special near Front Royal VA in 1969

Southern FP7 #6146 - a unit sublettered for the CNO&TP - has train 17, the Birmingham Special east of Front Royal, Virginia on September 6, 1969. Roger Puta photo.

Four switchers came onto the CNO&TP by relettering. Four GP9s carry CNO&TP numbers after earlier Southern-family numbers. GP30 2641 was wrecked, and a December 1965 locomotive kept the number. The company story is the Cincinnati, New Orleans and Texas Pacific page. Norfolk Southern still uses many of these road numbers.

On this page: At a glance · Switchers · Cab units · Road switchers through the SD24 · Later hood units · Relettered from other companies

At a glance

ItemDetail
RailroadCincinnati, New Orleans and Texas Pacific. Mark CNTP. Company Cincinnati, New Orleans and Texas Pacific
Number seriesSouthern Railway numbers, with CNO&TP sublettering
Fleet in these tables317 locomotives
Switchers29 built for the subsidiary. Four more were relettered from other Southern companies
Cab units85, from the 1939 FT demonstrators through the 1953 PA-2s
Road power through 196078, including five Fairbanks-Morse Train Masters and 21 SD24s
Hood units from 1963121, including the replacement for wrecked GP30 2641

Road numbers and subsidiary assignments follow the Southern motive-power compilation at thedieselshop.us, revised November 10, 2022. Electro-Motive serials and order numbers follow Andre Kristopans. Alco construction numbers follow that site’s model rosters. Fairbanks-Morse construction numbers and contract LD179 follow the Train Master roster. GE 44-ton 6010 follows the 44-ton roster. Information compiled October 7, 2026.

Switchers built for the subsidiary

The yard fleet begins with two Alco S1s and three S2s in 1941, a GE 44-tonner in 1945, seven NW2s, and two S4s. Fourteen SW7s arrived in 1950 as 6060–6073 and later carried 1102–1115. The NW2s were built as 6050–6056. After the system renumber into 1044–1085, the Southern compilation’s Note A names twenty-four numbers as CNO&TP-owned: 1045–1047, 1054–1056, 1058, 1061–1062, 1064–1068, 1072–1073, and 1075–1082. The note lists later numbers only. The seven locomotives built as 6050–6056 remain the NW2 row.

ModelNumbersQtySerialOrderBuiltNotes
S16000–6001269506–69507September 1941Renumbered from DS6000–DS6001
S26057–6059369643–69645October 1941Renumbered from DS6057–DS6059
NW26050–605671465–1471E434December 1941–February 1942Later scattered into the 1044–1085 renumber. See the note above
44-ton6010127828October 1945GE 44-tonner roster
S46074–6075278337, 78338September 1951
SW76060–60731410942–109556056February–March 1950Later 1102–1115

Cab units

The first Southern FT set was a pair of Electro-Motive demonstrators sold to the CNO&TP. The builder list keeps the A/B/C/D set numbers. The Southern compilation lists the same six cabs as 6100–6105 and the same six boosters as 6150–6155, and it records booster 6155 as later number 6103B. That renumber is the only set-letter crosswalk either list prints.

F3A 6106–6113, F7A 6114–6120, and FP7 6130–6149 are CNO&TP orders on the builder list. The Southern compilation gives those road numbers and leaves the owner cell blank, while it does tag the matching boosters. The builder’s purchaser is the assignment used here.

ModelNumbersQtySerialOrderBuiltNotes
FTA6100A, 6100D21030a, 1031aE390March 1939Demonstrators 1030 and 1031. Shop series 6100–6105
FTA6101A, 6101D21336a–1337aE391July 1941Shop series 6100–6105
FTA6102A, 6102D22089–2090E503December 1943Shop series 6100–6105
FTB6100B11030E390May 1939Demonstrator booster. Shop series 6150–6155
FTB6100C11031E390May 1939Shop series 6150–6155
FTB6101B, 6101C21336–1337E391July 1941Shop series 6150–6155
FTB6102B, 6102C22091–2092E504December 1943Shop series 6150–6155. Shop notes 6155 later numbered 6103B
F3A6106–611383853–3860E735May 1947
F3B6156–615943861–3864E735May 1947
F7A6114–6120711517–115236098April 1950
F7B6160–6163411524–115276098April 1950
F7B6164–6168512346–123506178November 1950
F7B6169–61821416487–165003121October–November 1952
F7B61831174293121November 1952
FP76130–61391011507–115166113April–May 1950
FP76140–61491012336–123456144October–December 1950
DL1096400–6401269400–69401February 1941
DL1106425–6426269441–69442February 1941Built as 6400B and 6401B
PA-26900–6903480846–80849DL-304DOctober–November 1953First use of 6900–6903. Later E8As took the numbers
PA-26904–6905281081–81082DL-304DDecember 1953First use of 6904–6905

Road switchers through the SD24

Alco RS2s 6206 and 6207 were bought by the Danville & Western and came to the CNO&TP with steam-generator equipment. The RS3 block on the Southern compilation is 6210–6239. Eleven GP7s were built as 6200–6205 and 6240–6244. Nos. 6200 and 6201 were wrecked. Nos. 6202 and 6203 became 8289 and 8290. The other seven survivors were renumbered into 8291–8297. GP9s 6245–6249 were built for the subsidiary. Nos. 6250 and 6251 had been Live Oak, Perry & Gulf 302 and 303. Nos. 6252 and 6253 had been Southern 2500 and 2501.

Five Fairbanks-Morse H24-66 Train Masters, 6300–6304, were the subsidiary’s only FM road locomotives. The Train Master production list, and the Train Master page, give them construction numbers 24L856–24L860 and contract LD179. Twenty-one SD24s followed in the next number block.

ModelNumbersQtySerialOrderBuiltNotes
RS26206–62072August 1949Built for the Danville & Western. Steam-generator equipped
RS36210–623930February–March 1952
GP76200–6203410146–101496032April 19506200–6201 wrecked. 6202–6203 later 8289–8290
GP76204–6205210977–109786032April 1950Later among 8291–8297
GP76240–6244517669–176736490January 1953Later among 8291–8297
GP96245–6249520585–205895400July–August 1955
GP96250–6251220592–205935400August 1955Built as Live Oak, Perry & Gulf 302–303
GP96252–6253220594–205955400August 1955Built as Southern 2500–2501
H24-666300–6301224L856–24L857LD179May 1955Train Master
H24-666302–6304324L858–24L860LD179June 1955Train Master
SD246305–63252125654–256745606December 1959–February 1960

Later hood units

GP30s 2630–2634 and 2641–2644 are the CNO&TP slice of a 60-unit Southern order. No. 2640, immediately ahead of them, is an Alabama Great Southern unit on the same order. Wrecked 2641 was replaced in December 1965 by a new locomotive that kept the number and the GP30 designation and rode on a GP35 carbody. Its serial is 31215, order 8072.

Inside the high-nose SD45s 3105–3169, the Southern compilation names three units built for the CNO&TP: 3106, 3168, and 3169. This roster keeps those three. SD40s are 3175–3178. SD40-2s are 3216 and 3231–3240. GP38-2s are the Note C numbers 5028–5033, 5226–5227, 5235–5238, and 5247–5253. Builder orders date those slices to 1972, 1977, and 1979.

GP50s assigned to the CNO&TP are 7039–7069 and 7077–7079. No. 7076 is listed for both the CNO&TP and the Georgia Northern, and the table holds that number for a source that assigns it to one company. Ten GE B23-7s, 4012–4017 and 4019–4022, close the road fleet. No. 4018 is absent from the CNO&TP line of that note. Nine MP15s, 2383–2391, are the late switchers built for the subsidiary.

ModelNumbersQtySerialOrderBuiltNotes
GP302630–2634528590–285947669October 1963Slice of the September–November 1963 order
GP302641–2644428596–285997669October 19632640 on this order is Alabama Great Southern. 2641 wrecked
GP302641 (2nd)1312158072December 1965Replacement. GP35 carbody. Kept the GP30 designation
GP382728–27421535258–352725744September 1969
GP38AC2871–2876637343–373485778October 1971
SD4531061335837074December 1967High nose. One of three SD45s built for the CNO&TP
SD453168–3169236117–361185755March 1970High nose
SD403175–3178437360–373637308April 1971
SD40-23216172661-872661January 1973
SD40-23231–32401073641-15–73641-2473641September 1973
GP38-25028–503367362-19–7362-247362February–March 1972
GP38-25226–52272767053-1–767053-2767053February 1977
GP38-25235–52384786292-4–786292-7786292August–September 1979
GP38-25247–52537786292-16–786292-22786292August–September 1979
GP507039–706325786251-23–786251-47786251August–November 1980
GP507064–70696807008-1–807008-6807008November–December 1980
GP507077–70793807054-5–807054-7807054April–June 19817076 is also listed for the Georgia Northern. Held for a single-company assignment
MP1523831787185-10787185September–October 1979
MP152384–23918787244-1–787244-8787244November 1979
B23-74012–4017, 4019–4022101978–1981GE. The 3970–4023 series ran September 1978–April 1981. 4018 is absent from the CNO&TP line

Relettered from other Southern companies

Three small groups were delivered to other Southern subsidiaries and later lettered CNO&TP. SW1 1002 and SW9 1133 had been Chattanooga Traction Company locomotives. The SW9 had been that company’s No. 5. Both were relettered in 1970. SW1500s 2336 and 2337 were delivered as Chattanooga Traction units in November 1969 and relettered afterward. Their serials sit in the Southern SW1500 order that also produced 2333–2335.

ModelNumbersQtySerialOrderBuiltNotes
SW110021April 1947Chattanooga Traction. Relettered CNO&TP in 1970
SW911331November 1950Built as Chattanooga Traction 5. Relettered CNO&TP in 1970
SW15002336–2337235289–352904564November 1969Delivered as Chattanooga Traction. Relettered CNO&TP

Related reading

Sources

  • Southern Railway motive-power compilation, thedieselshop.us, revised November 10, 2022, for road numbers, models, subsidiary tags, Notes A through H, and the relettering notes. Its cited authorities are Extra 2200 South (June 1962), Diesel Era, Gary and Stephen Dolzall, Baldwin Diesel Locomotives, and Paul K. Withers with Warren Calloway and J. Harlen Wilson, Diesels of the Southern Railway.
  • Andre Kristopans, Electro-Motive production lists at utahrails.net (freight cab units, 567 switchers, 645 switchers, 567 road switchers, 40-series, Dash-2, and 50-series), for serials, order numbers, and builder dates, and for the CNO&TP purchaser line on the FT, F3, F7, FP7, GP7, GP9, and SD24 orders.
  • Alco model rosters at thedieselshop.us, for S1 construction numbers 69506–69507, S2 69643–69645, S4 78337 and 78338, DL109 69400–69401, DL110 69441–69442, and PA-2 80846–80849 and 81081–81082.
  • Fairbanks-Morse H24-66 production roster, for 6300–6304, construction numbers 24L856–24L860, and the May–June 1955 dates used on the Train Master page.
  • GE 44-ton production roster on this site, for 6010, construction number 27828, October 1945.

Recent Articles

  1. Texas and Pacific Railway: Map, History, Timetables

    Nov 10, 26 10:33 PM

    1570098ujliu5009i1757093875.jpg
    The Texas & Pacific Railway, the federally chartered southern transcontinental that stopped at Sierra Blanca and became the Missouri Pacific's Texas and Louisiana main line. Merged October 15, 1976.

    Read More

  2. Texas and Pacific Steam Locomotives: Texas Types and Mountains

    Nov 10, 26 10:30 PM

    tp-2104-666.jpg
    Texas & Pacific steam: 70 Lima 2-10-4 Texas types, 600-669, classes I-1 through I-1d, and 10 Mountains, 900-909. No. 610 is at Palestine.

    Read More

  3. Texas and Pacific Diesel Roster (All-Time)

    Nov 10, 26 10:29 PM

    42767812_1995248017433792_890057054981455872_n.jpg
    All-time diesel roster of locomotives built for the Texas & Pacific. 246 units: E7s, E8s, 83 F7A and 35 F7B, NW2s, SW7s, SW8s, SW9s, GP7s, GP9s, GP18s, and GP35s. Serials and order numbers.

    Read More

  4. Santa Fe-Southern Pacific Railroad: Merger, History, Paint Scheme

    Nov 10, 26 10:07 PM

    2262007651g1bn12o60202793908.jpg
    The proposed Santa Fe-Southern Pacific merger, from the 1980 attempt and the 1983 holding company through the ICC denial, the Kodachrome paint, and the sale of the Southern Pacific.

    Read More

  5. CSX Santa Train Will Feature Locomotives 250 and 2026

    Nov 10, 26 01:51 PM

    csx-santa-train-250.jpg
    The CSX Santa Train will feature locomotives 250 and 2026 on November 21, 2026. The 84th running covers 110 miles from Shelbiana, Kentucky, to Kingsport, Tennessee.

    Read More

  6. Denton County Asks to Extend Stadler Car Relief

    Nov 10, 26 01:05 PM

    Denton County Transit Authority has asked the FRA to extend a waiver for its Stadler diesel multiple-unit cars. Comments run to January 11, 2027.

    Read More

  7. FreightCar America Reports Third-Quarter Results

    Nov 10, 26 01:02 PM

    freightcaramerica-ballastcar.jpg
    FreightCar America reported third-quarter revenue of $76.5 million and 662 railcar deliveries. Backlog stood at 2,660 cars valued at $284.5 million.

    Read More

  8. Amtrak Has Filed a Train Control Amendment

    Nov 10, 26 12:53 PM

    ethanallen-100-ny-dk.jpg
    Amtrak asked the FRA on October 26, 2026, to amend the safety plan for its Interoperable Electronic Train Management System. Comments are due November 30, 2026.

    Read More

  9. SunRail Signal Waiver Is Open for Comment

    Nov 10, 26 12:25 PM

    sunrail-107-sanford.jpg
    FRA has asked for comment on a petition to extend signal-testing relief on the Central Florida Rail Corridor. The notice names both the corridor and CSXT. Comments run to January 11, 2027.

    Read More

  10. Cars and Units Rose With BNSF Third-Quarter Earnings

    Nov 10, 26 12:18 PM

    bnsf-fullerton-2017-dk.jpg
    Berkshire Hathaway reports that after-tax BNSF earnings increased 19.3 percent in the third quarter of 2026, with car and unit volumes up 3.9 percent.

    Read More

  11. Amtrak Chicago Platforms Are Moving Toward Level Boarding

    Nov 10, 26 12:13 PM

    amtrak-cus-815.jpg
    Amtrak says construction is underway soon on the first level boarding platforms at Chicago Union Station, a 112 million dollar, 30-month project.

    Read More

  12. Maryland Has New Penn Line Times on November 16

    Nov 10, 26 12:07 PM

    marc-trn33-gaithersburgmd.jpg
    MARC Penn Line schedules change on November 16, 2026, after Amtrak trains return to regular schedules. Weekend southbound trains are unchanged.

    Read More

  13. Building Contract for Metrolink Sidings Goes to Granite

    Nov 10, 26 12:00 PM

    metro-850-sanclement.jpg
    Granite says Metrolink awarded a 51.5 million dollar SCORE contract for sidings near downtown Los Angeles and in Rancho Cucamonga.

    Read More

  14. EMD "F2" Locomotives: Specs, Roster, History

    Nov 10, 26 12:22 AM

    385273582375282934823583429866.jpg
    EMD F2, the 1,350-horsepower bridge between the FT and the F3. 104 locomotives, July through November 1946. Spotting features, specifications, and the production roster.

    Read More

  15. Southern Pacific Diesel Roster (All-Time)

    Nov 10, 26 12:08 AM

    sp-ml4000-9013.jpg
    Southern Pacific diesel roster with builder serials, order numbers, Texas and New Orleans numbers, and the 1965 renumbering. Alco, Baldwin, Fairbanks-Morse, Electro-Motive, General Electric, Krauss-Ma…

    Read More

  16. Southern Pacific Steam Roster: Post 1900

    Nov 09, 26 11:56 PM

    34692934982375275782689304973908.jpg
    Southern Pacific steam locomotives built since 1900. Pacific Lines, Texas and Louisiana Lines, cab-forwards, the GS 4-8-4s, and five narrow-gauge Ten-Wheelers. The quantity column counts the rows as p…

    Read More

  17. Canal Street Yard Assessment Stays Open Through December 7

    Nov 09, 26 01:07 PM

    The FRA signed the Canal Street Yard environmental assessment on November 6, 2026. Public inspection runs through December 7, and meeting dates are not confirmed.

    Read More

  18. NS Legacy Cab-Signal Comments Are Due November 9

    Nov 09, 26 01:05 PM

    ns-3395-sayre.jpg
    The FRA must receive comments by November 9, 2026, on a Norfolk Southern plan to drop legacy cab signals on 14 line segments and rely on positive train control.

    Read More

  19. Elimination Grant of $27.8 Million Reaches Scott Road in Allen County

    Nov 09, 26 12:53 PM

    Allen County received $27,878,116, also stated as $27.8 million, to design and build a grade separation where Scott Road crosses Norfolk Southern.

    Read More

  20. Vermont Receives $60.3 Million for the Western Corridor

    Nov 09, 26 12:45 PM

    vmt-431-dk.jpg
    Vermont will receive $60.3 million to rehabilitate about 60 miles of the Western Corridor. The delegation quote also calls the sum $60 million.

    Read More

  21. Burlingame Grade Separation Wins a Federal Grant

    Nov 09, 26 10:42 AM

    broadway-grade-burlingame.png
    Rep. Kevin Mullin said on November 5, 2026 that the FRA awarded $90.4 million for the Caltrain Broadway grade separation in Burlingame. Early work is expected in May 2027.

    Read More

  22. Orange County Rail Line Gets a Coastal Permit

    Nov 09, 26 10:18 AM

    The California Coastal Commission on November 5, 2026 approved a 10-year permit for the San Clemente rail line, including about 690,000 cubic yards of sand.

    Read More

  23. Railroad Quiet Zones Are Reinstated in St. Louis

    Nov 09, 26 10:14 AM

    trra-2004-2012.jpg
    St. Louis said on November 6, 2026 that the FRA reinstated the city quiet zones. Horns are to stop after railroad systems are updated.

    Read More

  24. Southern Pacific Railroad: Map, History, Logo

    Nov 08, 26 01:58 PM

    7902976511n10780918y1939078.jpg
    The Southern Pacific, from the December 2, 1865 charter and the Big Four to Sprint, the Rio Grande Industries purchase of 1988, and the Union Pacific merger of February 1, 1997.

    Read More

  25. California Awards Flexible Rail Aid to Nine Projects

    Nov 08, 26 01:15 PM

    metro-880-600.jpg
    CalSTA on November 5, 2026 awarded $66.58 million in flexible State Rail Assistance to nine California projects. Each amount in the summary is a cap, printed as up to.

    Read More

  26. CSX Leaves Three Days Out of the Weekly Reports

    Nov 08, 26 12:02 PM

    csx-berea-2022.jpg
    CSX told the Surface Transportation Board it cannot recover October 27-29 data for the EP 724 and EP 787 reports covering the week ending October 30, 2026.

    Read More

  27. NJ Transit Advances Three Station Housing Projects

    Nov 08, 26 11:56 AM

    njt-4016.jpg
    NJ Transit on November 5, 2026 advanced station projects in Jersey City, Bound Brook, and Morristown. The three are projected to add more than 1,000 homes.

    Read More

  28. River Fox Train Wraps a Locomotive for America 250

    Nov 08, 26 11:06 AM

    riverfox-2658.jpg
    The River Fox Train in West Sacramento wrapped a locomotive with America 250 markings, the American flag, and the Sacramento skyline. The wrap is expected to stay through 2027.

    Read More

  29. California Keeps Metrolink Service in the 2027 Budget

    Nov 07, 26 11:35 PM

    metro-886-wm.png
    Metrolink says a California State Transportation Agency grant lets the proposed fiscal year 2027 budget keep service at current levels. The board hearing is November 13, 2026.

    Read More

  30. WM's 4-6-6-4 Locomotives (M-2): Specs, Roster, History

    Nov 07, 26 04:37 PM

    wm-4664-blw-1203.png
    Western Maryland class M-2, twelve Baldwin 4-6-6-4s numbered 1201-1212, built in 1940 and 1941 for Hagerstown-Connellsville fast freight. Roster, specifications, and retirement in 1952-1953.

    Read More

  31. Missouri Pacific Diesel Roster (All-Time)

    Nov 07, 26 04:26 PM

    80012871623622j2h6820937098.jpg
    Missouri Pacific diesel roster with builder serials, order numbers, subsidiary lettering, and renumberings. Alco, Baldwin, Electro-Motive, and General Electric. Texas and Pacific locomotives are on th…

    Read More

  32. Missouri Pacific Steam Roster (Built Since 1900)

    Nov 07, 26 04:21 PM

    mp-484-2113.jpg
    Missouri Pacific steam locomotives built since 1900. Drury quantity column 1,439. Sedalia rebuilds counted once, 1,407 frames. Last steam was 0-6-0 9301 in November 1955.

    Read More

  33. Missouri Pacific Railroad: Map, Locomotives, Logo, History

    Nov 07, 26 04:19 PM

    86920419917263722672869080270909.jpg
    The Missouri Pacific was a large Midwestern that carried a long history of financial difficulty until later years.

    Read More

  34. LIRR Service Changes Start on November 9

    Nov 07, 26 03:15 PM

    New Long Island Rail Road schedules start on every branch on Monday, November 9, 2026. Midday and weekend times change. Rush hour does not. Babylon service returns in stages.

    Read More

  35. Draft EA Reviews Norfolk Southern Track in London, Ohio

    Nov 07, 26 11:35 AM

    ns-easliverpool-2025.jpg
    The Surface Transportation Board environmental office issued a draft assessment on November 6, 2026, for about 0.96 miles of Norfolk Southern track in London, Ohio. Comments are due November 20.

    Read More

  36. Metrolink Lines Will Not Run on Three Routes November 7

    Nov 07, 26 10:53 AM

    metro-865-2011.jpg
    Metrolink will not run the Ventura County, Orange County, or Inland Empire-Orange County lines on November 7 and 8, 2026. The advisory says no substitute transportation will be provided.

    Read More

  37. Hartford Line Adds a Weekday Round Trip on November 16

    Nov 07, 26 10:48 AM

    ctdot-danbury-03.jpg
    Connecticut said the Hartford Line adds a weekday New Haven-Hartford round trip on November 16, starts a morning train in Springfield, and extends weekend stops to Windsor and Windsor Locks.

    Read More

  38. Board Issues a Policy Statement on Rail Preemption

    Nov 07, 26 10:44 AM

    nec-220-2025.jpg
    The Surface Transportation Board placed a policy statement on public inspection for the November 9 Federal Register. It reviews existing preemption precedent and says it makes no binding determination…

    Read More

  39. NJ Transit Restores Lines After the Newark Drawbridge Stop

    Nov 07, 26 10:37 AM

    njt-4019-23.jpg
    NJ Transit said Morris and Essex service between Hackettstown and Dover, and Montclair-Boonton service between Hackettstown and Montclair State University, resumed after the Newark Drawbridge stop.

    Read More

  40. EMD "SD35" Locomotives: Data Sheet, Specs, Roster

    Nov 06, 26 10:35 PM

    720774650013819109490158.jpg
    EMD SD35, 2,500 horsepower, 16-cylinder 567D3A, built June 1964 through January 1966. 360 locomotives. Specifications and the production roster by owner, serial, and order.

    Read More

  41. EMD "SDP35" Locomotives: Data Sheet, Specs, Roster

    Nov 06, 26 10:32 PM

    sal-sdp35-1115.jpg
    EMD SDP35, the steam-generator SD35. 35 locomotives, July 1964 through September 1965. Seaboard Air Line 1100-1119, Atlantic Coast Line 550, Louisville and Nashville 1700-1703, Union Pacific 1400-1409…

    Read More

  42. RJ Corman Will Be Replaced on Part of the Luzerne Lines

    Nov 06, 26 01:34 PM

    rn-tunkhannock-dk.jpg
    A November 6, 2026 notice says Wilkes-Barre Terminal Railway would acquire about 59.65 miles in Luzerne County and replace R.J. Corman as operator on part of the line. The earliest date is November 22…

    Read More

  43. NS Names a Student Hub at the University of Georgia

    Nov 06, 26 12:03 PM

    ns-3631-wc.jpg
    Norfolk Southern said a 100,000 dollar gift named a student-organization hub in Driftmier Engineering Center. The University of Georgia marked the naming on October 26. The space is for 23 clubs.

    Read More

  44. Union Pacific Filed Its Vena Recording Certification

    Nov 06, 26 11:56 AM

    up-9523-np.jpg
    Union Pacific filed a November 5, 2026 verified statement that the confidential label is off the March 17 Vena recording and that parties of record received a copy at 3:30 p.m. Eastern.

    Read More

  45. OmniTRAX Adds Tenants at Its Blue Island Hub

    Nov 06, 26 10:26 AM

    omnitrax-blueisland.jpg
    OmniTRAX has signed new construction-company leases at its 90-acre Blue Island, Illinois, hub and is planning a second phase.

    Read More

  46. Veterans and Active-Duty Members Exceed 16 Percent of Norfolk Southern

    Nov 06, 26 10:14 AM

    ns-9232-dk.jpg
    Norfolk Southern said on November 5, 2026, that more than 3,000 veterans and active-duty service members are more than 16 percent of its workforce. This year grants are $100,000 and $50,000.

    Read More

  47. BNSF: Merger Would Put Half of U.S. Rail Shipments Under One Railroad

    Nov 06, 26 10:00 AM

    bnsf-crawford-2009.jpg
    BNSF chief marketing officer Tom G. Williams told customers on November 3, 2026, that a Union Pacific-Norfolk Southern merger would put about half of U.S. rail shipments under one railroad. Nothing is…

    Read More

  48. Amtrak Opens a Winter Fare Sale

    Nov 06, 26 09:28 AM

    amtrk-pennsylvanian-2021.jpg
    Amtrak opened a Winter Wanderlust sale on November 5, 2026. Book by November 12 for travel from December 1, 2026, through March 14, 2027. Blackout dates apply. Coach and Acela Business only.

    Read More

  49. CN and CPKC Report October Grain Records

    Nov 06, 26 08:50 AM

    cpkc-9375-pimage.png
    CPKC reported October 2026 grain records in Canada and the United States. CN reported 3.54 million metric tonnes across Canada. The releases do not print a combined total.

    Read More

  50. New Brunswick Transload Gets CN Rail Service

    Nov 06, 26 08:49 AM

    cn-newbrunswick-transload.png
    CN said on November 4, 2026, that it has started serving AD Gagnon Transload Services near Grand Falls, New Brunswick. The site is three kilometres from the Trans-Canada Highway and lists room for 106…

    Read More